DOI QR코드

DOI QR Code

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Received : 2019.01.29
  • Accepted : 2019.02.22
  • Published : 2019.02.28

Abstract

In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.

Keywords

CPTSCQ_2019_v24n2_127_f0001.png 이미지

Fig. 1. Civil BIM library in CALS web site (https://www.calspia.go.kr)

CPTSCQ_2019_v24n2_127_f0002.png 이미지

Fig. 2. Revit family element type property of Civil BIM library

CPTSCQ_2019_v24n2_127_f0003.png 이미지

Fig. 3. Integrated quantity of Civil BIM library

CPTSCQ_2019_v24n2_127_f0004.png 이미지

Fig. 4. BIM library structure integrated standard breakdown structure

CPTSCQ_2019_v24n2_127_f0005.png 이미지

Fig. 5. System flowchart connection with road and river BIM-based quantity-schedule(4D)-cost(5D)

CPTSCQ_2019_v24n2_127_f0006.png 이미지

Fig. 6. BIM-based library database flowchart integrated CBS/OBS/WBS standard breakdown structure

CPTSCQ_2019_v24n2_127_f0007.png 이미지

Fig. 7. System process connection with road and river quantity-schedule(4D)-cost(5D)

CPTSCQ_2019_v24n2_127_f0008.png 이미지

Fig. 8. System sample display connection with road and river quantity-schedule(4D)-cost(5D)

CPTSCQ_2019_v24n2_127_f0009.png 이미지

Fig. 9. Quantity-Cost(5D) connection with BIM-based library DB

CPTSCQ_2019_v24n2_127_f0010.png 이미지

Fig. 10. Cost Breakdown Structure Sample data

CPTSCQ_2019_v24n2_127_f0011.png 이미지

Fig. 11. BIM-based quantity-schedule(4D)-cost(5D) system sample display integrated Cost breakdown system information

CPTSCQ_2019_v24n2_127_f0012.png 이미지

Fig. 12. Object Breakdown Structure Sample data

CPTSCQ_2019_v24n2_127_f0013.png 이미지

Fig. 13. The process of BIM-based library property and Object breakdown structure property information

CPTSCQ_2019_v24n2_127_f0014.png 이미지

Fig. 14. BIM-based quantity-schedule(4D)-cost(5D) system sample display integrated Object breakdown system information

CPTSCQ_2019_v24n2_127_f0015.png 이미지

Fig. 15. Work Breakdown Structure Sample data

CPTSCQ_2019_v24n2_127_f0016.png 이미지

Fig. 16. The process of BIM-based library property and Work breakdown structure property information

CPTSCQ_2019_v24n2_127_f0017.png 이미지

Fig. 17. BIM-based quantity-schedule(4D)-cost(5D) system sample display integrated Work breakdown system information

CPTSCQ_2019_v24n2_127_f0018.png 이미지

Fig. 18. The flowchart of Schedule(4D)-Cost(5D) Integrated module connection with matrix function module in quantity-schedule(4D)-cost(5D) system

CPTSCQ_2019_v24n2_127_f0019.png 이미지

Fig. 19. The sample system display connection withquantity-cost(5D) by matrix cell unit

CPTSCQ_2019_v24n2_127_f0020.png 이미지

Fig. 20. The activity automatically create by matrix combine CBS and WBS breakdown structure

CPTSCQ_2019_v24n2_127_f0021.png 이미지

Fig. 21. The statement automatically create by matrix function combine with CBS and WBS breakdown structure

CPTSCQ_2019_v24n2_127_f0022.png 이미지

Fig. 22. Export of excel file format statement automatically create by matrix function

References

  1. LEE M. H. "A Study on Adoption of Normalizing Method for Database of Estimate on Design Stage using BIM -Focused on Building Interior Construction", Masters Thesis, Han-Yang University, pp. 2, pp. 36. August 2011
  2. LEE J. H. Parametric Quantity Take-Off of Earthwork by Comparing the Use of Surface and Solid Models, Journal of the BIM Association of Korea, pp. 59, August 2018.
  3. LEE Y. B. A Study on Standardization of BIM Library for Classification System and Property Information, Masters Thesis, Se-Jong University, pp. 18-20, pp. 58-60. June 2011
  4. RYU M. G. A Study on Improving Estimating Practices of Building Projects using BIM, Masters Thesis, Chung-Ang University, pp. 46-47, December 2008
  5. Ahn J. H. A Study on the BIM based Development of Integrated Information Breakdown Structure, Masters Thesis, Dong-Myung University, pp. 2, pp. 80-81, February 2018
  6. Jo. H. A Basic Study on the Construction to BIM Library of Architectural Design Firms, Masters Thesis, Han-Yang University, pp. 59, February 2012
  7. Lee. M. C. A Study on the BIM Property Information Modeling for the Cost Estimate of the Public Construction Projects, Masters Thesis, Seoul National University of Science and Technology, pp. 58, August 2010
  8. Shim. H. W. A Study on The Usability of a BIM-based Integration Solution to The Preliminary Estimate of The Public Construction Projects, Masters Thesis, Seoul National University of Science and Technology, pp. 68, February 2012
  9. Kim. J. Y. A Study of Reliability-based Quantity Estimation Error Analysis apply, Masters Thesis, Han-Yang University, pp. 104-105, February 2013
  10. Kim. H. Development of 3D BIM Based Object Breakdown Structure for Integrated Cost/Time Information, Masters Thesis, Kyung-Hee University, pp. 48, February 2012
  11. Jo. C. W. A Study on Developing Standard Framework for Implementing Open BIM - A Proposal for Developing Practical BIM Standard in Korea -, Masters Thesis, Kyung-Hee University, pp. 97-100, August 2012

Cited by

  1. 공동주택 리모델링 초기 설계안 검토 자동화 시스템 - 벽체, 바닥판의 정량 데이터 추출 vol.37, pp.3, 2019, https://doi.org/10.5659/jaik.2021.37.3.41