1 |
Eom, J.E., Lee, J.H., Kim, J.H., Choi, I.S. (2014) An Introduction to a BIM-based Automated Reinforcement Modeling System, J. Comput. Struct. Eng. Inst. Korea, 27(3).
|
2 |
Hong, S.U., Cho, Y.S., Lee, J.H., Hong, S.C. (2011) The Study on Development of Automatic Reinforcement Placing System of Columns for RC Structures based on Parametric Technology, J. Archi. Inst. Korea Struct. & Constr., 27(1), pp.11-18.
|
3 |
Hyundai Development Company (2010) Reinforced Concrete Reinforcement Details.
|
4 |
Information Publishing Group (2010) For beginners C# exercises 200.
|
5 |
Jang, J.W. (2013) The Development of a Rebar Arrangement System for Reinforced Concrete by Applying the Structural BIM-based Lean Design Technique, Master's Thesis, Graduate School of Hanyang University.
|
6 |
Kim, M.S. (2014) Utilizability of BIM Software Tools in the Early Stage of Architectural Design - Concentrated on Comparative Analysis among Major BIM Softwares, Reg. Assoc. Archi. Inst. Korea, 16(6) pp.65-72.
|
7 |
Park, S.H. (2014) C# 5.0 Programming to Stimulate the Brain.
|
8 |
Park, Y.J., Won, S.K., Han, C. H., Lee, J.B. (2011) A Study on 3D BIM Collaborative Approximate Estimating.
|
9 |
Addison-Wesley, Addison-Wesley (2014) Essential C# 5.0.
|
10 |
Architectural Institute of Korea (2009) KBC, Korean Building and Commentary.
|
11 |
Choi, H.C., Lee, Y.J., Lee, S.E., Kim, C.K. (2014) Development of 3-Dimensional Rebar Detail Design and Placing Drawing System, J. Comput. Struct. Eng. Inst. Korea, 27(4), pp.289-296.
DOI
|
12 |
Cho, Y.S., Kim, M..R., Hong, S.C. (2013) A Study on Automatic Reinforcement Placement System of Isolated Foundation based on S-BIM, J. Archit. Inst. Korea Struct.& Constr., 29(11), pp.21-28.
|