DOI QR코드

DOI QR Code

복합용도 개발 도시재생 사업에서의 단위 공간 기반 개산견적 모델링 가이드 제안 - ○○시 ○○역 복합환승센터 사례를 중심으로 -

A Proposal of Modeling Guide of the Unit Space-based Preliminary Cost Estimation in Urban Renewal Mix-Used Development - Case Study on ○○ Transfer Station Complex -

  • 투고 : 2013.03.19
  • 심사 : 2013.03.19
  • 발행 : 2013.03.30

초록

Mix-used development in urban renewal project is done to effectively utilize the limited downtown. Generally unlike a single project, It features placing a large number of different facilities(residential, commercial, business, cultural, etc.) which is each other organically linked. The purpose of this study is to suggest the method of modeling guide for 3D preliminary cost estimation considering visual and intuitive judgement of space in mix-used development Urban Renewal project. In this research, introducing SME(Standard Module and Element) breakdown structure, FID(Finish Identity) for estimating building space unit-based quantity take off was implemented. It could narrow the discrepancy of opinion between the stakeholders with more accurate cost-estimates, comparing to the traditional methods.

키워드

참고문헌

  1. Choo, H-J(2012) "A Study on the Effective Application Method of Construction Management System on Urban Regeneration Program", Masters Thesis, Chuang University.
  2. Franco K.T. Cheng, Jonathan Rihan, Joseph Tah, David Duce, Esra Kurul (2012), "Early stage multi-level cost estimation for schematic BIM models", Automation in Construction", Vol. 27, pp. 67-77. https://doi.org/10.1016/j.autcon.2012.05.008
  3. Hyun, C-T, Hong, T-H, Son, M-J, Jang, D-W (2009) "Development of the Construction Cost Prediction Model Based on Case-Based Reasoning in the Planning Phase of Mega-Project", Journal of the Architecture Institute of Korea, Vol. 25, No. 9, pp. 181-190.
  4. Kang, H-K(2009), "Value System Management Method Considering charateristic of Urban Regeneration Program." Masters Thesis, Kwang Woo University.
  5. Kim, C-J, Kim, Y-O (2007), "A Study on the Function Relations & Proximity of Facilities in Commercial Mixed- Use Building", Journal of the Architecture Institute of Korea, Vol. 23, NO. 4, pp. 73-82.
  6. Kim J-W, Ryu, H-G, Son Bo-Sik, Choi, Y-K (2009), "Process Model based on Characteristics of Mega-Scale and Multi-Complex Urban Regeneration Project." Journal of the Architecture Institute of Korea, Vol. 29 No. 1 pp. 617-620.
  7. Kim, G-H, Kang, K-I (2004) "A Study on Predicting Cost Estimation of Apartment Building Using Neurla Network's Architecture Optimized by Genetic Algorithms", Journal of the Architecture Institute of Korea, Vol. 20 No. 2, pp. 81-88.
  8. Kim, H-J (2012), "The Development of Data Model for Open BIM-Basd Estimates -Focused on Construction Type for Actual Cost of Public Project-", Masters Thesis, Kyung-Hee University.
  9. Kim, S-M, Cho, J-H, Lee, J-S, Chen, J-Y (2009). "Cost Estimating Model of Structural Elements using Approximate Quantity Survey in Preliminary Building Design Phase", Journal of the Architecture Institute of Korea, Vol. 25 No. 12, pp. 155-164.
  10. Kwon, O-H (2010), "The Study on application of 3D-based BIM for enhancing the efficiency of cost estimate and control : focusing on school facilities", Masters Thesis Hong ik University.
  11. Lee, M-C (2010), "A Study on the BIM Property Information Modeling for the Cost Estimate of the Public Construction Project", Masters Thesis, Seoul National University of Science and Technology.
  12. Lee, C-J, Lee, G, Won, J-S (2009) "An Analysis of the BIM Software Selection Factor", Journal of the Architecture Institute of Korea, Vol. 25 No. 7, pp. 153-163.
  13. Lim, C-W, Yu, J-H, Kim, C-D (2010), "Analysis for BIM Object Information Compatibility Problem Classification Among BIM Softwares", The Korea Institute of Building Construction Conference Vol. 10 No. 1 pp. 257-260.
  14. Lee, J-C (2004), "Developing an Automated Modules for Scheduling and Quantity Estimation Based on 3D CAD Model Information towards Effective Use of 4D CAD Model", Journal of the Architecture Institute of Korea, Vol. 20 No. 2, pp. 15-22.
  15. Min-Yuan Cheng, Hsing-Chih Tsai, Wen-Shan Hsieh, (2009) "Web-based Conceptual Cost Estimates for Construction Projects Using Evolutionary Fuzzy Neural Inference Model", Automation in Construction, 18, pp164-172. https://doi.org/10.1016/j.autcon.2008.07.001
  16. Park, S-H (2011), "Judgement Model for Consturction Cost Appropriateness of Mulit-Family House Projects in Planning Phase" Master Thesis University of Seoul.
  17. Park, Y-J, Won, S-K, Han, C-H, Lee, J-B (2011), "A Study on 3D BIM Collaborative Approximate Estimating Model of Structural Work for Apartment Project", Journal of the Architecture Institute of Korea, Vol. 27, No. 6, pp. 123-130.
  18. Seo, J-H, Ryu, H-G, Lee, D-R (2008) "Development of Public Office Cost Estimation Framework in Feasibility and Design Stage", Journal of the Architecture Institute of Korea, Vol. 24 No. 3, pp. 153-160.
  19. Son, B-S (2005), "Schematic cost estimation model based on quantity variables in building projects" Doctors Thesis Seoul National University.
  20. Shim, H-W (2012), "A Study on The Usability of a BIM-based Integration Solution to The Preliminary Estimate of The Public Construction Projects." Masters Thesis, Seoul National University of Science and Technology.
  21. Urban Renaissance Ministry of Land Infrastructure and Transport. (www.kourc.or.kr)