Korean Journal of Construction Engineering and Management
/
v.24
no.3
/
pp.52-61
/
2023
Conflicts in a construction project not only make negative impacts on project performance such as schedule delay or cost overrun but also require social cost to resolve the conflicts. Although the conflict needs a preemptive management because a conflict usually begins with a complaint, existing studies have focused on conflict resolution after it occurs. This study identifies and categorizes complaints which mainly appear in the construction projects. Those complaints were evaluated and quantified in terms of occurrence frequency and potential to conflict through a questionnaire survey with industry experts. Using the survey results, this study examines the characteristic of complaints in linear project and clustered project, and analyzes what kind of complaints occur by project type. As the results, this study derives the complaints with high potential to the conflicts that should be managed first during managing a construction project in each project type.
Public construction projects are implemented by government or public agencies using public resources to enhance the welfare of the people. Therefore, this paper investigates the impact factors for public construction performance. Then, the weights for impact factors are assigned using AHP. The impact factors are categorized into construction policies, project management efforts, and project environment. Further, 16 detail impact factors are listed in each category. The results show that weights are ordered in appropriate budget, reasonable project implementation process, and pre-project planning. These impact factors are related with pre-construction management activities. However, construction related impact like procurement, work difficulty, and construction environment show relatively low weights. The results can be useful to improve construction performance with managing impact factors showed high weights.
The purpose of this paper is to examine the present performance evaluation methods and to make Monte Carlo Simulation Model for the IT-based Government innovation project. It is suggested the proper ways in applying of Monte Carlo Simulation Model by integration of present evaluation methods. It develops the theoretical framework for this paper, examining the existing literature on proposing an approach to the key concepts of the economic impact analysis methods. It examines the actual conditions of performance evaluation focusing on the It-based Government Innovation project. It considers how the simulation model is applied to the performance management in the public innovation project focusing on the framework, process and procedure of performance management.
The Maglav system project affects communities and are usually funded by public agencies. Evaluation of this project that considerably impact whole communities requires public involvement. This specific requirement of transportation projects determines the method of their evaluation as the impacts are estimated from the transportation economic point of view. Especially evaluation criteria must reflect the needs of the interested parties and should consider all foreseeable benefits and losses caused by the Maglav project. To select evaluation criteria and evaluation method may help a decision--maker in making a best selection for a Maglav project.
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.21
no.4
/
pp.157-169
/
2021
Establishing an investment evaluation system for public ICT projects is ultimately to increase the success rate of public ICT projects in which government finances are invested and to revitalize the projects, thereby establishing a foundation for national economic growth and enhancing the competitiveness of the global ICT industry. This study tried to empirically verify the effect of public ICT project investment evaluation factors established according to the existing evaluation system on actual project success, and to suggest directions for future investment evaluation factors. Five evaluation factors such as public interest, economic feasibility, technology, policy and budget efficiency were derived through prior research, and the effect of these evaluation criteria on actual project success was verified through questionnaires from experts who directly participated in the actual project. In addition, it was confirmed whether the government's support system had a moderating effect between the investment evaluation factors and the project success of the ICT project. The reliability and validity of measurement tools, structural model analysis, and path analysis were empirically analyzed, and the significance of existing ICT investment evaluation factors was verified.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.423-426
/
2004
Costs of public rental housing development project consist on various kinds of profits and expenses such as national housing fund, rental cost, construction cost, financing cost. Therefore, project would not be executed without minute management and precise prediction about each item. Cash (low prediction and analysis are necessary to grasp current situation of project, because construction project which is conducted for a long period has fluent risks and inflows and outflows of cash. Although cash flow analysis has been conducted, cash flow has never been expected and managed. General matters to expect cash flow can be known by actual results and literatures. Hut there is no thesis which is studied about risk to enhance precision of expectation of cash flow. As existing thesises studied the risk about whole project, we haven't known precise relations of cash flow and project. Therefore, in this study, we are supposed to analysis and distinguish risk facts which can affect each item of cash flow for precise cash flow expectation and management of public rental housing development project.
Information strategy planning(ISP) is an analysis of the organization's work, information flow, and current information systems, and planning information structures to achieve organizational strategies and objectives. In addition to the systematic promotion of the information sector in the public sector, the government is required to establish an information strategy plan in order to enhance the efficiency of the information sector. However, there are many cases in which the IT project budget is reflected without establishing the information strategy planning. The purpose of this study is to clarify the criteria for establishing the information strategy planning in order to enhance the effectiveness of the information strategy planning. For this purpose, we set up a judgment model for Information strategy planning through expert group review (FGI) and conducted questionnaires on public sector experts. In addition, we proposed a project to establish an information strategy planning and an exceptional project based on the size of iinformatization project and characteristics of informatization project.
The paper investigates X-project, in which the public was invited to participate in a national R&D project, examines how X-project attracted the public's attention and involved them in a national R&D project, and discusses the significance and limitations of X-project. X-project was executed by a 12 citizen-led committee, financially supported by the Ministry of Science, ICT, and Future Planning, and backed by the Science and Technology Policy Institute. People raised 6,212 questions that reflected the severe needs they experienced in their daily lives through the online and offline platforms of X-project. In addition, the committee members, scholars, experts, government officials, and citizens gathered together to select the fifty most provocative and novel of the questions raised by the public, and invited public participation to answer the questions in innovative ways. 310 research teams including professional researchers from universities and institutes, high-school students, lay persons, and corporate workers applied for X-project, and 54 of these teams were finally selected to receive funding from the government. Through planning and conducting X-project, as well as interviewing and surveying the participants in X-project and non-participants, we found that there was an enormous social consensus on the necessity of public participatory national R&D projects. People asserted that science and technology should put a greater focus on solving social problems and satisfying public needs. We also confirmed that the public could take part in national R&D projects. Most of all, we found that the questions raised by the public were very challenging, novel, and complex, and thus researchers need break-through approaches to address them. It can be also argued that through experiencing the X-project citizens can regard themselves as ones who are not only recipients of the benefits of the development of science and technology, but also contributors of the development of them. We finally argue that there are some limitations to X-project in terms of how to provide diverse incentives that attract more participation, how to develop the process in which people got involved in the project in more easy ways, and how to create new ways for lay persons and professional researchers to cooperate in solving social problems.
Journal of Korean Society of Industrial and Systems Engineering
/
v.44
no.3
/
pp.230-239
/
2021
There is a growing interest in project management knowledge, project management information systems, and process improvement to systematically project execution in public sectors, achieve high performance and value, and increase the effectiveness of the overall industry. In particular, the software industry is a knowledge-intensive industry centered on professional manpower. This study examines the effect of the project managers' competences of regional SW promotion agencies on and project performance and the moderating effect of the level of project management maturity. We collected data using a questionnaire to the project managers of regional SW promotion agencies. In this study, a structural equation model was used to analyze the relationship between project managers' competences and performance. In addition, a multi-group structural equation model was used to analyze the moderating effect according to the high and low project maturity. As a result of the analysis, it was found that only contextual competence among the competences of the project manager had a positive effect on project performance. It was found that technical and behavioral competence did not have a positive effect on management and completion performance. It was found that the moderating effect according to the maturity of business management of local institutions was not significant.
Park, Sung-Ae;Park, Jung-Ho;Yun, Soon-Nyung;Lee, In-Sook
Research in Community and Public Health Nursing
/
v.12
no.2
/
pp.532-546
/
2001
This report is the result of interim evaluation of a health promotion project which was operated by a public health center of K Gu in the year of 2000. It evaluated the aspects of the aim of a project, a target group. and adequacy and appropriateness of a approaching strategy by considering data of public health center's self-evaluation, and guidelines of a group assigned to evaluate the project. The way of evaluation was dividing the project into a colligated evaluation and a evaluation by projects in the aspects of the structure, the procedure. and the result of a result. Through this. a device to improve the health improvement project was derived. The target data for evaluation was the second data and data of self-evaluation, reported data, membership register data of a health management. and interview materials with the people in charge by projects that are all collected as a project management documents. The result of evaluation is stated below. 1. Main purpose of a health promotion project is building a environment of healthy life practicing and providing information through various ways to increase the rate of practicing healthy life. Through overall project. the ultimate purpose and definite purpose were same, however, it was not quite satisfied to offer planning of a time, and a target amount in detailed strategy. As the purpose was to build environment of healthy life practicing. most of the projects had the whole community citizen as a target group. That made difficult to operate detailed projects. so the result was hard to estimate as much as the effort put into it. Also, there were too many kinds of projects and target groups to be equal to by the human source of a health promotion project team. so we were just bent on operating a project. and could not prepare for the evaluation. As the most of former evaluation of public health service was just counting number of the objects, the new way of evaluating a project wasn't familiar to us. so the evaluation of a detailed project cannot be done well. Techniques and advices needed for all of these things weren't offered appropriately. For the forward direction of unfolding project. it is desirable to operate project by selecting focused target and considering a strategy of evaluation as a strategy of reasonable spread. The evaluation of the project became difficult as participation of citizen for it was poor. So, approach strategy that can lead the motivation of community citizen should be derived. 2. For the continuation of a health promotion project, technical assistance system. description of a field in charge, and arrangement of the amount of task should be developed as a central level. Furthermore, as the health promotion project focus on behavioral modification program whose purpose is to lessen dangerous factors. the public health service model which is incorporated with former project should be developed and spread out in the field for the object-centered project plan.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.