Assessment of BIM-Based Government Funded Projects at the Design Phase (BIM 적용 공공 프로젝트 설계단계의 평가 방안에 관한 연구)

  • Shin, Seung-Hyup;Ham, Nam-Hyuk;Kim, Jea-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.213-216
    • /
    • 2010
  • Nowadays BIM(Building Information System) is applied to the public construction delivery system. BIM can help communications between project applicants through the extraction of the exact and prompt information. It also increases the efficiency of planning, construction, economic feasibility and maintenance in the whole project. Due to increasing demands of BIM, project evaluation and its process on the final deliverables have been in major interests. Thus, through the analysis of the current BIM project, characteristics, types and applications have been researched. We have discussed completeness, relationship and planning of BIM data, which are the standards of evaluation.

  • PDF

A Study of the Analysis and Identification of Risk Factor in Regard to Cash Flow in Public Rental Housing Development Project (공공건설임대주택사업의 현금흐름에 대한 리스크분석)

  • Lee Sang-Gon;Lee Jae-Young;Lee Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.423-426
    • /
    • 2004
  • Costs of public rental housing development project consist on various kinds of profits and expenses such as national housing fund, rental cost, construction cost, financing cost. Therefore, project would not be executed without minute management and precise prediction about each item. Cash (low prediction and analysis are necessary to grasp current situation of project, because construction project which is conducted for a long period has fluent risks and inflows and outflows of cash. Although cash flow analysis has been conducted, cash flow has never been expected and managed. General matters to expect cash flow can be known by actual results and literatures. Hut there is no thesis which is studied about risk to enhance precision of expectation of cash flow. As existing thesises studied the risk about whole project, we haven't known precise relations of cash flow and project. Therefore, in this study, we are supposed to analysis and distinguish risk facts which can affect each item of cash flow for precise cash flow expectation and management of public rental housing development project.

  • PDF

Analyzing Relationships Between Project Characteristic and Public Conflict Characteristic in Public Construction Using Fuzzy Analytical Hierarchy Process (FAHP) (Fuzzy AHP를 이용한 프로젝트 특성과 공공갈등 특성 간의 영향 관계 중요도 분석)

  • Park, Sungjoon;Lee, Changjun;Han, Seung Heon;Yun, Sungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.70-77
    • /
    • 2020
  • Public conflict in domestic project has been increased and it results in direct and indirect damages. In order to reduce the loss, there have been diverse researches on the public conflict. However, most of researches tend to mainly focus on characteristics of the conflict. Considering the conflict occurred in SOC project, a research of conflict with project characteristics is necessary. In response to consider the relationships between characteristics of project and conflict, this paper aims to present the relative importance of the relationships. We conducted literature reviews and interviews with experts to select main characteristics of projects and public conflicts. Based on the selected four main characteristics each, we analyzed the relationships between them using Fuzzy AHP. The results show that SOC construction project type among project characteristics exerts the most important effect on overall public conflict. Especially conflict factors and conflict phases among public characteristics are critically influenced by project types. The findings provide a foundation for a conflict management reflecting varying public conflicts due to project characteristics.

Project Delivery Systems and Project Performance;An Evaluation Model for Public Construction Projects (공공건설사업의 발주방식 선정 및 성과평가 모델)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.41-47
    • /
    • 2007
  • The selection of the reasonable project delivery system (PDS) is crucial for a successful performance of a project, which means to achieve project objectives. Furthermore, the project performance has been tightly related to the selection of PDS appropriate to pertinent project characteristics. In this context, the ministry of finance and economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". For efficient operation of the new project delivery systems, this paper suggested a PDS selection model which supports decision making of the reasonable PDS for a pertinent project by assessing characteristics of the public construction projects, both quantitatively and qualitatively. In addition, a PDS performance evaluation model was proposed in order to get feedback on the result of the PDS selection and the operation for the succeeding project. The standard models suggested in this paper might be used as a tool to support the decision making of the public organizations.

  • PDF

Development of CM Model for BTL Projects in a Public Educational Facilities (공공교육시설 BTL사업의 CM적용모델 개발)

  • Shin, Nam-Kyoung;Woo, Kwang-Min;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.338-341
    • /
    • 2006
  • After the revision of Private Investment Law in January 2005, BTL is introduced to expand the social infrastructures as a major business procedure. Especially, the size of the public educational infrastructure ordered by each city education office is increased by 45% compared to last year, so it is major in BTL Project. However, in the process of practicing BTL Project by now, there are a lot of problems specially in the public educational infrastructure. As a result, this study gives the solutions in the process of BTL Project, the CM models to support the Education Office${\square}{\square}$job and the suggestions for the working scope of the participating construction companies.

  • PDF

AN ANALYSIS ON FACTORS AFFECTING SCHEDULE PERFORMANCE OF PUBLIC HOUSING PROJECTS: CASE OF SINGAPORE

  • Bon-Gang Hwang;Xianbo Zhao;Si Yi Ng
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.412-418
    • /
    • 2013
  • With the increasing demand for public housing, the Singapore government decided to reduce the waiting time of future public housing owners, which requires these projects to be completed on time. As a result, this study aims to identify the frequent and impactful factors affecting schedule performance of public housing projects in Singapore. The survey conducted with 36 industry experts revealed that "site management", "coordination among various parties", "design changes by owner during construction", "availability of laborers on site", "availability of material", and "availability of staff to manage projects" were the six factors that should be emphasized to assure the schedule performance of public housing projects. In addition, there was statistically significant agreement between public housing projects and other building projects on both the frequency and impact ranks of the factors. The findings from this study will help practitioners involving public housing projects to take measures to assure the achievement of project schedule objectives.

  • PDF

The Impact of Project Manager's Leadership in Private-Public-Partnership(PPP) on Project Citizenship Behavior and Project Performance (민간투자사업 프로젝트 관리자의 리더십이 프로젝트 시민행동과 프로젝트 성과에 미치는 영향)

  • Hwang, Jae-Seung;Park, So-Hyun;Kim, Seung-Chu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.103-114
    • /
    • 2018
  • Public-Private-Partnership(PPP) is becoming a popular form of projects in construction industry worldwide. Normally, the management team of PPP project consists of various experts from different disciplines such as construction engineer, bank financier, contract manager, investors, etc. The diversity of team members causes difficulties in managing the team efficiently and furthermore for the smooth execution of the project itself. One of the solutions to this issue might be the application of citizenship behavior by the team members. This study conducts an empirical investigation of the effect of project citizenship behavior on the project performance. We have collected data by using a questionnaire from those with PPP project experiences in the domestic construction industry. The results show that project citizenship behavior has full mediating effects between PM's leadership and the project performance. This study has an academic significance in that it is the first attempt to apply the concept and to show the effect of citizenship behavior in project management discipline, particularly in construction industry, in Korea. We also expect that the project management teams for PPP projects would benefit from the findings of this study.

Risk Analysis and Classification of Public-Private Partenership in Project Financing Process (민관합동형 PF사업의 단계별 리스크 분류 및 위험도분석)

  • Park, Hye-Sung;Kim, Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.117-126
    • /
    • 2011
  • With Public-private partnership PF (project financing) deals saw explosive increase in quantity since its introduction to Korea in 2001, but, met with severe recession in the fallouts of the financial crisis that hit the global economy in 2008. This study intends to identify the risk factors corresponding to issues of public-private partnership projects financing structure and classify and analyze them by project phase. Outcomes of this research are expected to help recognize risk factors in each project phase during project planning and develop risk control and mitigation strategy during project implementation.

Assessment of Public Engagement Approach in Various Project Stages: The Case Study of Central Market, Hong Kong

  • Wong, Crystal;Chan, Icy;Lam, Lily;Zayed, Tarek;Sun, Yi
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.267-277
    • /
    • 2020
  • The present research evaluates the public engagement approach in various project stages. Hong Kong had long been criticized as top-down and executive-led jurisdiction by overlooking the importance of cultural heritage and public concerns on public projects. It was suggested to the government to engage public and provide sufficient public consultation. Thereby, the government announced a series of revitalization and conversion measures in Policy Address in 2008. To carry out the measures, there were voices, because of diverse and sometimes conflicting interests, over the effect of revitalization project. On the other hand, studies reveal that there are benefits of revitalization and enhancement of public engagement approach. In pursuit of the subject, the present research aims at studying the Central Market as a case study pilot project. In October 2009, the Policy Address announced that the Central Market be revitalized. Tasked to implement the project, Urban Renewal Authority (URA) continued to adopt the people-oriented approach as the guiding principle in its core business and in heritage preservation and revitalization so as to create a sustainable development. Between government and the public, URA acts as a bridge for communication. As between URA and the public, URA conducted public consultation, set up an ad-hoc committee in January 2016 to be in charge of the project and will continuously inform the government and public with the updates and project progress. The main objectives of the present research are to assess the advantages and challenges in different stages of public engagement approach, to evaluate the engagement system, to give a comprehensive view for participation of stakeholders, and to find out effective strategies to enhance civil engagement. Research was achieved through interviews to key persons in the project, questionnaire that was distributed to community and experts in the field. Case Study of the Central Market was studied and investigated using different sources, such as newspapers, journals, etc, to evaluate the degree of public engagement in the project. Both detailed qualitative methodological approaches of interview, questionnaire, and case study, act as a synergy to demonstrate the research objectives and provide the comprehensive perceptions on the revitalization project. The results show that public participants in revitalized project have generated considerable value enhancements to social-cultural, environmental, political and economic aspect. This study provides valuable insights that the public participation can make positive contribution to sustainability in the city. The findings indicate that no any single system is flawless therefore seeking both public opinions and professional advices are also important as a comprehensive approach to achieve higher sustainability of the building.

  • PDF

Public Infrastructure Practitioner's Recognition on Project Performance (공공토목공사 실무자의 성과요인 인식차이 분석)

  • Park, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.93-100
    • /
    • 2007
  • Performance measurement and evaluation is a critical issue in public funded civil infrastructure projects in recent years. As a results, Korean government has introduced the related policies and regulations based on the foreign cases to evaluate public construction projects. However, construction circumstances are different from other countries and the results from adopted regulations are not satisfied. Therefore this research proposes the critical success factors(schedule, cost, productivity, change order, safety, quality) for public construction projects based on previous related research outputs to successfully implement construction performance evaluation. Then, this paper also proposes the weights for the critical success factors. The proposed weights are developed by AHP of construction experts. Furthermore, the paper shows the difference of the weights of the critical success factors by project participants (owner, constructor, engineering, and inspector). This efforts will enhance the ability to develop an effective performance evaluation process and system for public construction projects.