1 |
Brahm, E. (2003). Conflict stages. Beyond intractability. "Conflict Research Consortium." University of Colorado, Boulder.
|
2 |
Brockman, J.L. (2013). "Interpersonal conflict in construction: Cost, cause, and consequence." Journal of Construction Engineering and Management, 140(2), 04013050.
DOI
|
3 |
Buckley, J.J. (1985). "Fuzzy hierarchical analysis." Fuzzy sets and systems, 17(3), pp. 233-247.
DOI
|
4 |
Castejón-Limas, M., Ordieres-Meré, J., González-Marcos, A., and González-Castro, V. (2011). "Effort estimates through project complexity. Annals of operations research." 186(1), pp. 395-406.
DOI
|
5 |
Chang, D.Y. (1996). "Applications of the extent analysis method on fuzzy AHP." European journal of operational research, 95(3), pp. 649-655.
DOI
|
6 |
Cho, K., Hong, T., and Hyun, C. (2009). "Effect of project characteristics on project performance in construction projects based on structural equation model." Expert Systems with Applications, 36(7), pp. 10461-10470.
DOI
|
7 |
Hyundai Research Institute (HRI) (2016). Weekly Economic Review. 16(45).
|
8 |
Harker, P.T., and Vargas, L.G. (1987). "The theory of ratio scale estimation: Saaty̓s analytic hierarchy process." Management science, 33(11), pp. 1383-1403.
DOI
|
9 |
Hsieh, T.Y., Lu, S.T., and Tzeng, G.H. (2004). "Fuzzy MCDM approach for planning and design tenders selection in public office buildings." International Journal of Project Management, 22(7), pp. 573-584.
DOI
|
10 |
Howes, R., and Robinson, H. (2006). "Infrastructure for the built environment: Global procurement strategies." Infrastructure for the Built Environment: Global Procurement Strategies.
|
11 |
Institute of Social Conflict (SOCON) (2007). Conflict management and practical manual of SOC projects for each contruction project type, Ministry of Construction & Transportation Research Report.
|
12 |
Jaffar, N., Tharim, A.A., and Shuib, M.N. (2011). "Factors of conflict in construction industry: a literature review." Procedia Engineering, 20, pp. 193-202.
DOI
|
13 |
Jehn, K.A. (1997). "A qualitative analysis of conflict types and dimensions in organizational groups." Administrative science quarterly, 186(1), pp. 530-557.
DOI
|
14 |
Lim, J.H., Ga, S.J., Kim, K.M., Kim, J.S., and Jeon, H.J. (2016). "A study on stakeholder's behavior and responsibility." Industry-University Cooperation Foundation Dankook University.
|
15 |
Jorgensen, M. (2016). "A survey on the characteristics of projects with success in delivering client benefits." Information and Software Technology, 78, pp. 83-94.
DOI
|
16 |
Kwon, K.D., and Lee K.W. (2017). "Building up DB of public policy conflicts and case studies." Korean Journal of Policy Studies, pp. 77-106.
|
17 |
Kim, Y.M., and Chae, S. (1996). "The application of the analytical Hierarchy process(AHP) to the travel destination choice." The Tourism Science Society of Korea, 20-1(22), pp. 63-81.
|
18 |
Lee, C., Won, J.W., Jang, W., Jung, W., Han, S.H., and Kwak, Y.H. (2017). "Social conflict management framework for project viability: Case studies from Korean megaprojects." International Journal of Project Management, 35(8), pp. 1683-1696.
DOI
|
19 |
Li, T.H., Ng, S.T., and Skitmore, M. (2013). "Evaluating stakeholder satisfaction during public participation in major infrastructure and construction projects: A fuzzy approach." Automation in construction, 29, pp. 123-135.
DOI
|
20 |
Lu, W., Zhang, L., and Pan, J. (2015). "Identification and analyses of hidden transaction costs in project dispute resolutions." International journal of project management. 33(3), pp. 711-718.
DOI
|
21 |
McLeod, L., and MacDonell, S.G. (2011). "Factors that affect software systems development project outcomes: A survey of research." ACM Computing Surveys (CSUR), 43(4), p. 24.
|
22 |
Min, J.H., Jang, W., Han, S.H., Kim, D., and Young Hoon, K. (2018). "How Conflict Occurs and What Causes Conflict: Conflict Analysis Framework for Public Infrastructure Projects." Journal of Management in Engineering, 34(4), pp. 1-14.
|
23 |
Moore, C.W. (2014). "The mediation process: Practical strategies for resolving conflict." John Wiley & Sons.
|
24 |
Yates, D.J. (1998). "Conflict and disputes in the development process: A transaction cost economics perspective."
|
25 |
Saaty, T.L. (1990). "How to make a decision: the analytic hierarchy process." European Journal of Operational Research, 48(1), pp. 9-26.
DOI
|
26 |
Sharif, M., and Kerachian, R. (2018). "Conflict Resolution in Construction Projects Using Nonzero-Sum Fuzzy Bimatrix Games." Iranian Journal of Science and Technology, Transactions of Civil Engineering, pp. 1-9.
|
27 |
Taylan, O., Bafail, A. O., Abdulaal, R.M., and Kabli, M.R. (2014). "Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies." Applied Soft Computing, 17, pp. 105-116.
DOI
|
28 |
Vaux, J.S. (2014). "Relationship conflict in construction management and how it affects performance and profit." Pontificia Universidad Catolica del Peru, 8(33), 44.
|
29 |
Wu, P. (2007). "Application of the Pattern of Construction Management Contract in Large-scale Project in Shanghai." JOURNAL-CHONGQING JIANZHU UNIVERSITY, 29(5), p. 159.
DOI
|