References
- Brahm, E. (2003). Conflict stages. Beyond intractability. "Conflict Research Consortium." University of Colorado, Boulder.
- Brockman, J.L. (2013). "Interpersonal conflict in construction: Cost, cause, and consequence." Journal of Construction Engineering and Management, 140(2), 04013050. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000805
- Buckley, J.J. (1985). "Fuzzy hierarchical analysis." Fuzzy sets and systems, 17(3), pp. 233-247. https://doi.org/10.1016/0165-0114(85)90090-9
- Castejón-Limas, M., Ordieres-Meré, J., González-Marcos, A., and González-Castro, V. (2011). "Effort estimates through project complexity. Annals of operations research." 186(1), pp. 395-406. https://doi.org/10.1007/s10479-010-0776-0
- Chang, D.Y. (1996). "Applications of the extent analysis method on fuzzy AHP." European journal of operational research, 95(3), pp. 649-655. https://doi.org/10.1016/0377-2217(95)00300-2
- Cho, K., Hong, T., and Hyun, C. (2009). "Effect of project characteristics on project performance in construction projects based on structural equation model." Expert Systems with Applications, 36(7), pp. 10461-10470. https://doi.org/10.1016/j.eswa.2009.01.032
- Harker, P.T., and Vargas, L.G. (1987). "The theory of ratio scale estimation: Saaty̓s analytic hierarchy process." Management science, 33(11), pp. 1383-1403. https://doi.org/10.1287/mnsc.33.11.1383
- Hsieh, T.Y., Lu, S.T., and Tzeng, G.H. (2004). "Fuzzy MCDM approach for planning and design tenders selection in public office buildings." International Journal of Project Management, 22(7), pp. 573-584. https://doi.org/10.1016/j.ijproman.2004.01.002
- Howes, R., and Robinson, H. (2006). "Infrastructure for the built environment: Global procurement strategies." Infrastructure for the Built Environment: Global Procurement Strategies.
- Hyundai Research Institute (HRI) (2016). Weekly Economic Review. 16(45).
- Institute of Social Conflict (SOCON) (2007). Conflict management and practical manual of SOC projects for each contruction project type, Ministry of Construction & Transportation Research Report.
- Jaffar, N., Tharim, A.A., and Shuib, M.N. (2011). "Factors of conflict in construction industry: a literature review." Procedia Engineering, 20, pp. 193-202. https://doi.org/10.1016/j.proeng.2011.11.156
- Jehn, K.A. (1997). "A qualitative analysis of conflict types and dimensions in organizational groups." Administrative science quarterly, 186(1), pp. 530-557. https://doi.org/10.2307/2393737
- Jorgensen, M. (2016). "A survey on the characteristics of projects with success in delivering client benefits." Information and Software Technology, 78, pp. 83-94. https://doi.org/10.1016/j.infsof.2016.05.008
- Kwon, K.D., and Lee K.W. (2017). "Building up DB of public policy conflicts and case studies." Korean Journal of Policy Studies, pp. 77-106.
- Kim, Y.M., and Chae, S. (1996). "The application of the analytical Hierarchy process(AHP) to the travel destination choice." The Tourism Science Society of Korea, 20-1(22), pp. 63-81.
- Lee, C., Won, J.W., Jang, W., Jung, W., Han, S.H., and Kwak, Y.H. (2017). "Social conflict management framework for project viability: Case studies from Korean megaprojects." International Journal of Project Management, 35(8), pp. 1683-1696. https://doi.org/10.1016/j.ijproman.2017.07.011
- Li, T.H., Ng, S.T., and Skitmore, M. (2013). "Evaluating stakeholder satisfaction during public participation in major infrastructure and construction projects: A fuzzy approach." Automation in construction, 29, pp. 123-135. https://doi.org/10.1016/j.autcon.2012.09.007
- Lim, J.H., Ga, S.J., Kim, K.M., Kim, J.S., and Jeon, H.J. (2016). "A study on stakeholder's behavior and responsibility." Industry-University Cooperation Foundation Dankook University.
- Lu, W., Zhang, L., and Pan, J. (2015). "Identification and analyses of hidden transaction costs in project dispute resolutions." International journal of project management. 33(3), pp. 711-718. https://doi.org/10.1016/j.ijproman.2014.08.009
- McLeod, L., and MacDonell, S.G. (2011). "Factors that affect software systems development project outcomes: A survey of research." ACM Computing Surveys (CSUR), 43(4), p. 24.
- Min, J.H., Jang, W., Han, S.H., Kim, D., and Young Hoon, K. (2018). "How Conflict Occurs and What Causes Conflict: Conflict Analysis Framework for Public Infrastructure Projects." Journal of Management in Engineering, 34(4), pp. 1-14.
- Moore, C.W. (2014). "The mediation process: Practical strategies for resolving conflict." John Wiley & Sons.
- Saaty, T.L. (1990). "How to make a decision: the analytic hierarchy process." European Journal of Operational Research, 48(1), pp. 9-26. https://doi.org/10.1016/0377-2217(90)90057-I
- Sharif, M., and Kerachian, R. (2018). "Conflict Resolution in Construction Projects Using Nonzero-Sum Fuzzy Bimatrix Games." Iranian Journal of Science and Technology, Transactions of Civil Engineering, pp. 1-9.
- Taylan, O., Bafail, A. O., Abdulaal, R.M., and Kabli, M.R. (2014). "Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies." Applied Soft Computing, 17, pp. 105-116. https://doi.org/10.1016/j.asoc.2014.01.003
- Vaux, J.S. (2014). "Relationship conflict in construction management and how it affects performance and profit." Pontificia Universidad Catolica del Peru, 8(33), 44.
- Wu, P. (2007). "Application of the Pattern of Construction Management Contract in Large-scale Project in Shanghai." JOURNAL-CHONGQING JIANZHU UNIVERSITY, 29(5), p. 159. https://doi.org/10.3969/j.issn.1674-4764.2007.05.032
- Yates, D.J. (1998). "Conflict and disputes in the development process: A transaction cost economics perspective."