The Productivity Improvement for Steel Framing Work Efficiency by Work Sampling and 5-minute Rating Technique

  • Chang, SooWon;Yi, June-Seong;Son, JeongWook
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.40-46
    • /
    • 2015
  • This study presents the results of our analysis and recommendations for process and productivity improvements. The project studied consists of a 5-story research building, with a structure of steel frames supporting concrete slabs. The observations focused on the analysis of the overall erection and framing process. The methods used for the analysis consisted in intensive visits on site, where construction processes were observed in term of resources, activities, durations, materials' handling procedures, and technology used. Back to the office, authors used the information captured to model the different trades' activities, using work sampling and 5-minute rating technique. The work sampling provides insight into the activity, hence allowing for process improvements. The productivity of various trades is strongly dependent on the organization of the work process and work site conditions. Improving the productivity of the entire project or company is not possible until everyone is committed to improvement.

Action to Improve the Reliability of Production Planning

  • Kim Daeyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.139-144
    • /
    • 2002
  • Management of today's dynamic projects requires a shift of focus from product to process. The purpose of traditional project controls is to conform performance to plan. The purpose of lean project controls is to make the best possible choices at each point in time during the course of the project, as well as contributing knowledge to the parent organizations so they can learn from project experience. The Lean Construction Institute(LCI) proposed the Last Planner System(LPS) capable of accomplishing that purpose, principally through controlling the quality of planning and of management processes themselves, as distinct from concentrating exclusively on project performance. The case project was a pilot project for the implementation of the Last Planner. Consequently, the coordination of the work on this project was extremely successful. The project had its share of challenges. The coordination did not prevent design problems, or supplier errors, but helped the team deal with the problems effectively while maintaining the work flow. The last planner helped the contractors know: a) who will be doing what and where, b) what each one needs from the others, and c) what are the project priorities. The system itself created a more collaborative environment, because it 'demands' that the subcontractors address these issues.

Selecting Optimum Management Practicesin Pre-construction Phase Considering Project Characteristics

  • Cha, Hee-Sung;Kim, Ki-Hyun;Ko, Young-Jin
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.1
    • /
    • pp.1-4
    • /
    • 2012
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the hardships of managing construction project in the construction industry. This research classifies and applies the improvements made by the operator's work, in order to apply factors of success on the construction project, as performance management factors. In addition, in order to predict the results reflecting the project characteristic of performance management factor un-improvable by the operator in the initial stage of construction, the effect of project characteristic to the performance was drawn by performance difficulty. Also, in order to improve the predicted performance, researches on setting valid best practices according to the performance territory through a correlation analysis between the best practices improvable through the operator's work, and the performance was made.

An Establishment the Work Breakdown Structure for Owners in the Multi-Complex Project (입체·복합 프로젝트에서 발주자 중심의 WBS 구축방향)

  • Ko, Dae-Jun;Choi, Eun-A;Seo, Young-Chil;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.127-131
    • /
    • 2008
  • The successful project management is based on definition of project goals in construction industry. The WBS(Work Breakdown Structure) is one of the major factors which defines works related to project goals. The necessity of the WBS for owners in multi complex projects which would help them to understand the whole project is rising because the multi-complex project in the construction industry has increasing recently. Therefore, this study suggests directions to establish the WBS for owners through investigating a concept of the multi-complex project first and analyzing types of project, domestic and foreign WBS, and case studies.

  • PDF

Analysis of ERP System Success Factors Depending on Organizational Culture and Size (기업의 조직문화와 기업의 규모에 따른 ERP 시스템 도입의 성공요인 분석)

  • Jung, Chang-Wook;Kim, Il-Kyoung
    • Journal of Information Technology Services
    • /
    • v.6 no.2
    • /
    • pp.35-47
    • /
    • 2007
  • The purpose of this thesis is to analyze the success factors of ERP system in corporations and to know what is different in the factors depending on organizational culture and size. Considering there are various results from introduction of the same information technology(IT), it is implied that organizational characteristics make a difference. In this thesis we did factor analysis and multiple regression about the factors based on the previous studies and analyzed the priorities depending on organizational culture and size. The results show that mechanistic organization has key success factors of work process change, project team abilities, and determination of CEO while organic organization has those of work process change and project team abilities. Plus bigger sized organization has success factors of work process change, project team abilities, and determination of CEO while small sized organization has those of work process change and project team abilities.

Critical Environmental Management Factor by Project Participants for Considering Work Importance and Difficulty (업무 중요도-난이도를 고려한 프로젝트 참여주체별 핵심 환경관리 항목 도출)

  • Hong, Suk-Kyoo;Kim, Chang-Won;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.214-215
    • /
    • 2013
  • Recently, Construction industry has been trying to reduce environmental impacts reflecting the global trend 'Green Growth'. However most of previous studies focused on operation & maintenance phases and do not have been approached construction phases. In addition, environmental management factors by project participants are assessed with only weight of factors, overlooking these work difficulty. Therefore This study aims to deducted the critical environmental management factors by project participants considering work difficulty in plan, design and construction phase. The basis data is collected through literature reviews and interview targeting each project participant and analyze these data using importance-difficulty analysis(IDA).

  • PDF

AN AUTOMATED FORMWORK MODELING SYSTEM DEVELOPMENT FOR QUANTITY TAKE-OFF BASED ON BIM

  • Seong-Ah Kim;Sangyoon Chin;Su-Won Yoon;Tae-Hong Shin;Yea-Sang Kim;Cheolho Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1113-1116
    • /
    • 2009
  • The attempt to use a 3D model each field such as design, structure, construction, facilities, and estimation in the construction project has recently increased more and more while BIM (Building Information Modeling) that manages the process of generating and managing building data has risen during life cycle of a construction project. While the 2D Drawing based work of each field is achieved in the already existing construction project, the BIM based construction project aims at accomplishing 3D model based work of each field efficiently. Accordingly, the solution that fits 3D model based work of each field and supports plans in order to efficiently accomplish the relevant work is demanded. The estimation, one of the fields of the construction project, has applied BIM to calculate quantity and cost of the building materials used to construction works after taking off building quantity information from the 3D model by a item for a Quantity Take-off grouping the materials relevant to a 3D object. A 3D based estimation program has been commonly used in abroad advanced countries using BIM. The program can only calculate quantity related to one 3D object. In other words, it doesn't support the take-off process considering quantity of a contiguous object. In case of temporary materials used in the frame construction, there are instances where quantity is different by the contiguous object. For example, the formwork of the temporary materials quantity is changed by dimensions of the contiguous object because formwork of temporary materials goes through the quantity take-off process that deduces quantity of the connected object when different objects are connected. A worker can compulsorily adjust quantity so as to recognize the different object connected to the contiguous object and deduces quantity, but it mainly causes the confusion of work because it must complexly consider quantity of other materials related to the object besides. Therefore, this study is to propose the solution that automates the formwork 3D modeling to efficiently accomplish the quantity take-off of formwork by preventing the confusion of the work which is caused by the quantity deduction process between the contiguous object and the connected object.

  • PDF

Delay Factors Based on the Importance of Finish Work in Apartment Construction Project (공동주택 마감공사 중요도 기반 작업지연 요인 분석)

  • Lee, Seung-Hoon;Lee, Sang-Hyo;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.125-129
    • /
    • 2010
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

  • PDF

Project Experience and its Impact on Project Performance (프로젝트 경험이 프로젝트 성과에 미치는 영향)

  • Yu, Gun Jea
    • The Journal of the Korea Contents Association
    • /
    • v.14 no.8
    • /
    • pp.365-373
    • /
    • 2014
  • The assignment of exploration on individuals provides challenging work environments, while it generates high levels of complexity. On the other hand, the assignment of exploitation on individuals offers less challenging work environments, while it makes low levels of complexity. Give the characteristics of exploration and exploitation, I argue that the assignments of both exploration and exploitation create the favorable work environments to individuals. Developed hypotheses were tested using a logit regression from a sample of 168 project managers in a R&D center. I found that a manager who experienced exploitation project(s) is positively related to higher performance in exploitation project(s). In addition, a manager who experienced both exploitation and exploration projects are found to be positively associated with higher project performance.

Study on Project Management Method of Naval Ship Building in Monetary Fluctuations (금융환경 변동 하에서 실적가치 기법에 의한 함정건조사업 관리 방안 연구)

  • Kim, Hyung-Man;Seo, Guan-Hee;Kim, Soo-Young
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.42 no.5 s.143
    • /
    • pp.542-549
    • /
    • 2005
  • Naval ships are complex weapon systems which play the integrated performance by system integration of many kinds of weapon systems and their leading ships are usually not disposed after test and evaluation but militarised. Then, strict project management is required for naval ship building projects by identifying problems early and by taking prefer measures in time against unexpected situations encountered in the process of the projects. EVMS is a project management system which can manage the schedule and the budget of a project concurrently and estimate the project's time duration and the cost at project completion. In this paper, the applicability and usefulness of WMS is studied for a assumed navai ship building project, in the environment of monetary fluctuations such as price index, wage increase rate and exchange rate.