Browse > Article
http://dx.doi.org/10.6106/JCEPM.2015.5.1.040

The Productivity Improvement for Steel Framing Work Efficiency by Work Sampling and 5-minute Rating Technique  

Chang, SooWon (Department of Architectural Engineering, Ewha Womans University)
Yi, June-Seong (Department of Architectural Engineering, Ewha Womans University)
Son, JeongWook (Department of Architectural Engineering, Ewha Womans University)
Publication Information
Journal of Construction Engineering and Project Management / v.5, no.1, 2015 , pp. 40-46 More about this Journal
Abstract
This study presents the results of our analysis and recommendations for process and productivity improvements. The project studied consists of a 5-story research building, with a structure of steel frames supporting concrete slabs. The observations focused on the analysis of the overall erection and framing process. The methods used for the analysis consisted in intensive visits on site, where construction processes were observed in term of resources, activities, durations, materials' handling procedures, and technology used. Back to the office, authors used the information captured to model the different trades' activities, using work sampling and 5-minute rating technique. The work sampling provides insight into the activity, hence allowing for process improvements. The productivity of various trades is strongly dependent on the organization of the work process and work site conditions. Improving the productivity of the entire project or company is not possible until everyone is committed to improvement.
Keywords
Productivity; Work Sampling; 5-minute Rating Technique; Crew Balance Chart;
Citations & Related Records
Times Cited By KSCI : 5  (Citation Analysis)
연도 인용수 순위
1 J. Adrian, "Construction Productivity: Measurement and Improvement", Stipes Publishing, pp.18-21, 2004.
2 C. H. Oglesby, H. Parker, G. Howell, "Productivity Improvement in Construction", McGraw Hill, pp.180-185, 1989.
3 B.S. Yoon, J.H. Yu, C.D. Kim, "The Analysis of Work Efficiency and Work Constraints by the Difference of Work Management Characteristics", Proceedings of KICEM, pp.437-451, 2009.
4 B.R. Kang, K.S. Kim, I.J. Um, K.J. Koo, "Development of Labor Productivity Index for Steel Construction", Proceedings of KICEM, pp.353-357, 2004.
5 Sawhney, A., A. Mund, and J. Marble. "Simulation of the structural steel erection process", in Proceedings of the 31st conference on Winter simulation: Simulation---a bridge to the future-Volume 2, Phoenix, AZ, USA, 1999.
6 Beavers, J., J. Moore, and W. Schriver, "Steel erection fatalities in the construction industry". Journal of Construction Engineering and Management, vol.135, no.3, pp.227-234. 2009.   DOI   ScienceOn
7 Aral, S., E. Brynjolfsson, and M. Van Alstyne, "Information, technology, and information worker productivity". Information Systems Research, vol.23, no.3-part-2, p.849-867. 2012.   DOI
8 Han, S. and D.W. Halpin. "The use of simulation for productivity estimation based on multiple regression analysis". in Proceedings of the 37th conference on Winter simulation. Winter Simulation Conference, New York, NY, USA, 2005.
9 Pan, N.-H., M.-L. Lee, and S.-Q. Chen, "Construction Material Supply Chain Process Analysis and Optimization", Journal of Civil Engineering and Management, vol.17, no.3, pp.357-370. 2011.   DOI
10 Kim, Y.-W., et al., "Environmental impacts comparison between onsite vs. prefabricated Just-In-Time (prefab-JIT) rebar supply in construction projects". Journal of Civil Engineering and Management, vol.19 no.5,pp. 647-655. 2013.   DOI
11 Seo, J.W. and H.H. Choi, "Risk-based safety impact assessment methodology for underground construction projects in Korea". Journal of construction engineering and management, vol.134, no.1, pp.72-81, 2008.   DOI   ScienceOn
12 Kartam, N., I. Flood, and P. Koushki, "Construction safety in Kuwait: issues, procedures, problems, and recommendations". Safety Science, vol.36, no.3, pp.163-184, 2000.   DOI   ScienceOn
13 Hajji, A.M. and P. Lewis, "Development of productivity-based estimating tool for energy and air emissions from earthwork construction activities", Smart and Sustainable Built Environment, vol.2, no.1, pp.84-100, 2013.   DOI
14 Hyun, C., et al., "The Development of Probabilistic Time and Cost Data: Focus on field conditions and labor productivity". KICEM Journal of Construction Engineering and Project Management, vol.1, no.1, pp.37-43, 2011.
15 Dom, N.M., N. Kasim, and A. Shamsudin, Factors Influencing Human Resource Planning (HRP) for Local Workforce Supply in Malaysian Construction Industry, KICEM Journal of Construction Engineering and Project Management, vol.2, no.1, pp.5-13, 2012.   DOI   ScienceOn
16 Nassar, K. and Hosny, O, "A Model for Assessing Maximum Overtime Rate in Labor Subcontracting Practices", KICEM Journal of Construction Engineering and Project Management, vol.2, no.2, pp.18-27, 2012.   DOI   ScienceOn
17 Kwon, S., et al., A Modified-AHP Method of Productivity Analysis for Deployment of Innovative Construction Tools on Construction Site, KICEM Journal of Construction Engineering and Project Management, vol.4, no.1, pp.45-50, 2014.   DOI   ScienceOn
18 G. Howell, G. Ballard, "Implementing Lean Construction Understanding and Action", 1998.
19 Bossink, B. and H. Brouwers, "Construction waste: quantification and source evaluation", Journal of Construction Engineering, vol.122, no.1, pp.55-60, 1996.   DOI
20 Poon, C.-S., A.T. Yu, and L. Jaillon, "Reducing building waste at construction sites in Hong Kong". Construction Management and Economics, vol.22, no.5, pp.461-470, 2004.   DOI   ScienceOn
21 D. Garrett, L. Lee, "Lean Construction Submittal Process.", Quality Engineering, Taylor & Francis, vol.23, pp.84-93, 2011.
22 Rojas, E. and Aramvareekul, P. "Labor Productivity Drivers and Opportunities in the Construction Industry." Journal of Management in Engineering, vol.19, no.2, pp.78-82, 2003.   DOI
23 Christian, J., and Hachey, D. "Effects of delay times on production rates in construction", Journal of Construction Engineering and Management. vol.121, no.1, pp.20-26, 1995.   DOI   ScienceOn
24 Thomas, H. R., Sanvido, V. E., and Sanders, S. R. "Impact of material management on productivity-a case study". Journal of Construction Engineering and Management. vol.115, no.3, pp.370-384, 1989.   DOI
25 Khanh, H.D. and S.Y. Kim, "Practitioners' Perception on Relationship between Production Planning and Waste Occurrence in Construction Projects", KICEM Journal of Construction Engineering and Project Management, vol.4, no.3, pp.1-12, 2014.