Action to Improve the Reliability of Production Planning  

Kim Daeyoung (텍사스대 건설관리학)
Publication Information
Korean Journal of Construction Engineering and Management / v.3, no.4, 2002 , pp. 139-144 More about this Journal
Abstract
Management of today's dynamic projects requires a shift of focus from product to process. The purpose of traditional project controls is to conform performance to plan. The purpose of lean project controls is to make the best possible choices at each point in time during the course of the project, as well as contributing knowledge to the parent organizations so they can learn from project experience. The Lean Construction Institute(LCI) proposed the Last Planner System(LPS) capable of accomplishing that purpose, principally through controlling the quality of planning and of management processes themselves, as distinct from concentrating exclusively on project performance. The case project was a pilot project for the implementation of the Last Planner. Consequently, the coordination of the work on this project was extremely successful. The project had its share of challenges. The coordination did not prevent design problems, or supplier errors, but helped the team deal with the problems effectively while maintaining the work flow. The last planner helped the contractors know: a) who will be doing what and where, b) what each one needs from the others, and c) what are the project priorities. The system itself created a more collaborative environment, because it 'demands' that the subcontractors address these issues.
Keywords
Citations & Related Records
연도 인용수 순위
  • Reference
1 Ballard, G.,and Howell, G. 1996. 'Can Project Controls Do Its Job?' Proceedings of the 4th Annual Conference of the International Group for Lean Construction, Birmingham, England
2 D.Y Kim 2002. 'Exploratory Study of Lean Construction: Assessment of Lean Implementation.' PhD. Dissertation, University of Texas, Austin
3 Howell, G. 2000. 'A Guide to the Last Planner for Construction Foremen and Supervisors.' Restricted White Paper, Lean Construction Institute, California
4 Ballard, G. 1999. 'Improving Work How Reliability.' Proceeding, 7th Conference of the International Group for Lean Construction, University of California at Berkeley, California
5 Ballard, G., and Howell, G. 1997. 'Improving the Reliability of Planning: Understanding the Last Planner Technique.' White Paper, Lean Construction Institute, California
6 Ballard, G., and Howell, G. 1994. 'Implementing Lean Construction: Stabilizing Work Flow.' Proceeding, 2nd Annual Conference on Lean Construction, Pontificia University Catolica de Chile, Santiego, Chile
7 Junior, A, Scola, A and Conte, A. 1998. 'Last Planner as a Site Operations Tool.' Proceeding, 6th Conference of the International Group of Lean Construction, Guaruja, Sao Paulo, Brazil
8 Boldt Company 2001. 'Separate Strategic Planning from Production Planning.' Proceeding, 3rd Annual Lean Congress, Berkeley, California
9 Ballard, G. 1994. ''Work Structuring.' White Paper No.4, Lean Coostruction Institute, Las Vegas, Nevada