Browse > Article
http://dx.doi.org/10.6106/JCEPM.2012.2.1.001

Selecting Optimum Management Practicesin Pre-construction Phase Considering Project Characteristics  

Cha, Hee-Sung (Ajou University)
Kim, Ki-Hyun (Ajou University)
Ko, Young-Jin (Ajou University)
Publication Information
Journal of Construction Engineering and Project Management / v.2, no.1, 2012 , pp. 1-4 More about this Journal
Abstract
The importance of project performance management as an alternative for solving problems is rising, which are followed by the hardships of managing construction project in the construction industry. This research classifies and applies the improvements made by the operator's work, in order to apply factors of success on the construction project, as performance management factors. In addition, in order to predict the results reflecting the project characteristic of performance management factor un-improvable by the operator in the initial stage of construction, the effect of project characteristic to the performance was drawn by performance difficulty. Also, in order to improve the predicted performance, researches on setting valid best practices according to the performance territory through a correlation analysis between the best practices improvable through the operator's work, and the performance was made.
Keywords
Project Performance Management; Performance Improvement; Pre-Construction Phase; Construction Management Method; Project characteristics; Project Performance; Performance level of difficulty;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Construction Industry Institute(CII), Bench marking Data Report 2001, CII, Austin, TX, 2001.
2 D.K.H. Chua, Y.C. Kog, P.K. Loh, "Critical Success Factros for Different Project Objectives", Journal of Construction Engineering & Management, ASCE, vol. 125, no. 3, pp.142-150, May/June 1999.   DOI   ScienceOn
3 K. Evangelidis, "Performance measured performance gained", the Treasurer, no. February, pp.45-47, 1992.
4 Gena L. Abraham, "Critical Success Factors for the Construction Industry", Proceedings of Construction Research Congress 2003
5 A.P.C. Chan, D. Scott, A.P.L. Chan, "Factors Affecting the Success of a Construction Project", Journal of Construction Engineering and Management, ASCE, vol. 130, no. 1, pp. 153-155, January 2004.   DOI   ScienceOn
6 A.D. Songer, K.R. Molenaar, "Project Characteristics for successful public-sector design-build", Journal of Construction Engineering and Management, ASCE, vol. 123, no. 1, pp. 34-.40, March 1997.   DOI   ScienceOn
7 M. Armstrong, and A. Baron, "Managing performance: performance management in action", London: Chartered Institute of Personnel and Development, 2004.