• Title/Summary/Keyword: Project Duration

Search Result 373, Processing Time 0.024 seconds

The Origin of the Spin-Orbit Alignment of Galaxy Pairs

  • Moon, Jun-Sung;An, Sung-Ho;Yoon, Suk-Jin
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.46 no.1
    • /
    • pp.28.3-29
    • /
    • 2021
  • Galaxies are not just randomly distributed in space; instead, a variety of galaxy alignments have been found over a wide range of scales. Such alignments are the outcome of the combined effect of interacting neighbors and the surrounding large-scale structure. Here, we focus on the spin-orbit alignment (SOA) of galaxy pairs, the dynamical coherence between the spin of a target galaxy and the orbital angular momentum of its neighbor. Based on a recent cosmological hydrodynamic simulation, the IllustrisTNG project, we identify paired galaxies with mass ratios from 1/10 to 10 at z = 0 and statistically analyze their spin-orbit angle distribution. We find a clear preference for prograde orientations (i.e., SOA), which is more prominent for closer pairs. The SOA is stronger for less massive targets in lower-density regions. The SOA witnessed at z = 0 has been developed progressively since z = 2. There is a clear positive correlation between the alignment strength and the interaction duration with its current neighbor. Our results suggest the scenario in which the SOA is developed mainly by interactions with a neighbor for an extended period of time, rather than by the primordial torque exerted by the large-scale structure.

  • PDF

An Analysis of the Relationship Between Resettlement and Housing Redevelopment Characteristics (주택재개발사업 특성이 재입주에 미치는 영향)

  • Ko Duk Kyun;Kim Hong-Kyu
    • Journal of the Korean housing association
    • /
    • v.16 no.3
    • /
    • pp.101-107
    • /
    • 2005
  • The reason that compulsory removals of a low-quality housing redevelopment such as involuntary or unintentional migration present a problem for urban communities is that whether involuntary movers adapt themselves to their new home has an influence on the urban communities that surround them. Moreover, involuntary emigrants have higher probability of choosing faulty residential areas than voluntary emigrants do. This gives rise to a problem of another residential migration for involuntary movers. In order to solve these problems, there is a need for a new housing policy that enables original residents to come back to their old community. However studies for resettlement had not conducted subjects about housing redevelopment characteristics which influences the involuntary movers directly. Instead personal microscopic characteristics such as statistics of resettlement, the moving distance, the reason of moving, improvement of living environment, had been main subjects of farmer studies. So the purpose of this study is to analyze an analysis of the relationship between resettlement and housing redevelopment characteristics. The data used in this study was obtained at 47 areas designated by Seoul (metropolis) since 1990 for redevelopment. Cluster Analysis Is used for dividing high rate of resettlement with low rate of resettlement and Regression Analysis is used for the analysis of the relationship between resettlement and housing redevelopment characteristics. The results of examining the effects of a redeveloped housing complex on returning residents at 47 areas designated by Seoul (metropolis) since 1990 fur redevelopment are as follows: First, A housing complex with a high returning rate (remove-in rate?) has no state/public land, unauthorized building owners who are in the low-income brackets, and few interested parties such as union members. This is the characteristic of a redeveloped housing complex with a short-period project span. On the contrary, a housing complex that has a low returning rate is crowded by state/public land, and numerous unauthorized building owners, and interested parties. Second, According to the linear regression analysis, among the factors that affect returning residents, 'physical properties(characteristics) of a region', 'population properties within a region', and 'properties of a project span' indicate a negative(-)influence whereas 'properties of a complex density' shows a positive(+) influence. In a nutshell, the more the physical properties, population properties, projectspan properties, the lower the returning rate and the more the complex density properties, the higher the returning rate. In detail, an area with many small land and new/large buildings, a high population, and a long project duration has a low returning rate of original residents while an area holding large capacity and buildings with many number of floors (multiple-storied building) has a high returning rate.

Preliminary Scheduling Based on Historical and Experience Data for Airport Project (초기 기획단계의 실적 및 경험자료 기반 공항사업 기준공기 산정체계)

  • Kang, Seunghee;Jung, Youngsoo;Kim, Sungrae;Lee, Ikhaeng;Lee, Changweon;Jeong, Jinhak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.26-37
    • /
    • 2017
  • Preliminary scheduling at the initial stage of planning phase is usually performed with limited information and details. Therefore, the reliability and accuracy of preliminary scheduling is affected by personal experiences and skills of the schedule planners, and it requires enormous managerial effort (or workload). Reusing of historical data of the similar projects is important for efficient preliminary scheduling. However, understanding the structure of historical data and applying them to a new project requires a great deal of experience and knowledge. In this context, this paper propose a framework and methodology for automated preliminary schedule generation based on historical database. The proposed methodology and framework enables to automatically generate CPM schedules for airport projects in the early planning stage in order to enhance the reliability and to reduce the workload by using structured knowledge and experience.

A Study on the Multiple Real Option Model for Evaluating Values based on Real Estate Development Scenario (다중 실물옵션을 활용한 시나리오기반 부동산 개발사업 가치평가 연구)

  • Jang, Mikyoung;Ku, Yohwan;Choi, Hyemi;Kwon, Tae-Hwan;Kim, Juhyung;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.114-122
    • /
    • 2015
  • Real estate development requires significant amount of capital investment. The project duration has been increased according to its enlarged size. For this reason, cost overrun and time delay are important risk factors that should be managed properly. As a method to hedge the risk, varoius real option methods have been presented. However, conventional project value assesment methods such as NPV(Net Present Value) have weakness to support decision making by reflecting dynamic situations in terms of variation of cost and time. Furthermore, the decision making process is serious of actions rather than discrete event. The purpose of this paper is to present a multiple real option valuation method to overcome the deterministic aspect of real option presented in previous research and practice. The method is developed as following: firstly, to select the model that can be applied in the real estate development project through a survey from previous literature on real options analysis; secondly, to apply data from office development case in order to verify the model by applying conventional real option and multiple real option valuation. According to analysis result, multiple real option provides enhanced values comparing to NPV and single real option.

Systematic Improvement for Effective Operation of Long-Term Continuous Construction Contracts (장기계속공사계약의 효율적 운영을 위한 제도 개선)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.3-10
    • /
    • 2019
  • The entire duration of the long-term continuous construction contract project cannot be expected when calculating the initial budget as the construction of the contract is carried out annually according to the budget composition. In addition, the statutes related to the defect liability and execution of contracts have not been established systematically in relation to the contract. Therefore, there are many problems at the actual construction site with regard to the defect liability or the performance of the contract in relation to the contract. In this study, the following improvement directions were presented for the efficient operation of the contracts: First, the defect liability is legal and should be specified in an Act rather than an enforcement decree. Second, if the parties to the contract vary in the following order in the contract, the special agreement should be specified in the enforcement decree. Third, in the event of an indirect cost due to the extension of the period of the long-term continuous work, the contingency items of the total project cost management policy should be utilized. Fourth, in the case of general construction contract conditions, clauses related to the purchase of the premium of the CAR, inspection, taking over, defect repair, and defect inspection shall be supplemented.

An analysis of operation status depending on the characteristics of R&D projects in Sciences and Engineering universities (이공계 대학 연구과제 특성 별 운영 형태 현황)

  • Lee, Sang-Soog;Yoo, Inhyeok;Kim, Jinhee
    • Journal of Digital Convergence
    • /
    • v.20 no.4
    • /
    • pp.93-100
    • /
    • 2022
  • This study aimed to understand the current status of science and engineering university(SEU) R&D operations depending on the research project characteristics(e.g., stages and characteristics), then provide implications for future university R&D support systems and related policies. Hence, an online survey targeting SEU R&D recipients was conducted between October 4th to November 5th, 2021. Analyzing 445 valid data using the Apriori algorithm, 16 association rules for R&D operation according to the research project characteristics show that regardless of research characteristics, SEU's R&D projects, particularly in applied research, were funded or operated under the leadership of government or public institutions. For basic research, individual researchers had a higher level of autonomy in determining research topics; yet, they had a short duration (3 years) and a unit of evaluation period of more than 3 years. These findings can be empirical evidence for revealing the relationship among various variables in operating SEUs' R&D.

A Study on a Basic Model for GIS Audit, Based on Various Types of GIS Projects (GIS 사업유형을 고려한 GIS 감리의 기반 모델 연구)

  • Koh, Kwang-Chul;Kim, Eun-Hyung
    • Journal of Korea Spatial Information System Society
    • /
    • v.2 no.2 s.4
    • /
    • pp.5-23
    • /
    • 2000
  • Since 1995, national and local governments have competitively initiated many and large GIS projects and audit for the projects becomes an important issue. So far, the audit in the Information Technology(IT) area has tried to deal with the issue but ineffectiveness has been found for the successful GIS project management. Effective auditing is a critical element for the project management. In order to establish a proper audit model for the GIS projects and to promote auditing activities in the projects, this study constructs two hypotheses and tries to prove them. The hypotheses are as follows : 1) For a good audits model for GIS, unique characteristics of a GIS project audit items and the scope of the audit need to be identified. 2) The scope of audit needs to be classified according to the requests from tasks in the projects. To prove the hypotheses, this study analyzes positive aspects of audit in IT and construction projects, clarifies the audit items in GIS projects by comparing with them, and classifies the scope of the GIS audit based on various types of GIS projects. As a results, 5 types of the GIS audit are identified : (1) audit for project management, (2) audit focused on IT, (3) audit characterized by GIS technologies, (4) GIS database audit and (5) consulting services for critical problems in the projects. In addition, 4 criteria in classifying the GIS projects are suggested for the GIS audit. The 4 criteria are domain, scope, duration, and GIS applications technologies. Especially, GIS technology considered in this study includes GIS software, methodologies for GIS development, GIS database and quality control of GIS data, which are not usually reflected in the existing studies about in GIS audit. Because the GIS audit depends on a type of GIS projects, scopes of the audit can be flexibly reconstructed in accordance with the types of GIS projects. This is a key to effective and realistic audit for the future GIS projects. Strategies for effective GIS audit are also proposed in terms of the following: GIS project management, goal establishment in each audit stage, documentation from GIS audit, timing strategies for intensive GIS audit, and designing team structure.

  • PDF

A Study on the Analysis of Planning and Management Factors of Finishing Works Using an Analytic Hierarchy Process (계층분석법(AHP)을 이용한 마감공정의 계획 및 관리요인 분석에 관한 연구 - 초고층 주거건축물 공사 건식벽체공법을 대상으로)

  • Lee, Chi-Joo;Kim, Jae-Joon;Lee, Yoon-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.132-140
    • /
    • 2007
  • There is an increase in interest and investment in high-rise housing as it is perceived to be a new value-added market in the construction industry. In constructing a high-rise housing, the finishing works are executed in accompaniment with many other activities that are progressed repeatedly and spontaneously on each floor. It was reported that the duration of finishing works differs according to the management ability of the executing company and has a significant effect on the entire project duration. We suggest a need to concentrate on important management factors by analyzing the factors affecting the productivity of finishing works based on the site characteristics in high-rise housing. There are various complex productivity-affecting factors including the technical factors involved in planning and managing the processes of finishing works. From the viewpoint of planning and management factors, the importance of productivity-affecting factors was analyzed using the Analytic Hierarchy Process (AHP). A continuous examination of the management of high-importance factors will make it possible to improve productivity by enhancing the understanding of productivity-affecting factors of finishing works and suggesting a practical management direction.

A Study on Duration Calculation Method for Eco-Friendly Remodeling Demolition Work Using Productivity Analysis (생산성 분석에 기초한 친환경 리모델링 철거공사 기간 산출 방안)

  • Woo, Joong-Pyung;Cha, Hee-Sung;Kim, Kyung-Rai;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.124-132
    • /
    • 2013
  • An influx of the population to the city has soared due to industrialization. As times go by, cities become densely populated so Korean government started to construct a number of buildings including apartment housings. Because they have become functionally, structurally, esthetically deteriorated over the past two decades. some improvements are needed. There are mainly two ways to improve old buildings: remodeling and reconstruction. Between the two, the first one is more popular as it is less time-consuming and more eco-friendly. Demolition work comes first for both of them and it should not give negative effects since it is regarded as a CP(Critical path) in the overall process. For this reason, a thorough construction management must be done. The reality, however, demolition is managed by the construction manager's experiences and decisions. If the key factor of demolition which is the planning of manpower and machine equipment, is determined by unscientific and subjective judgments, its period and risk also will increase. In particular, eco-friendly demolition can be more risky because it's been rarely conducted. Therefore, scientific and objective ways of demolition management are needed. In this context, this paper aims at analyzing productivity in each process of demolition focusing on manpower and machinery equipment which are the main parts of demolition assuming that the demands of eco-friendly remodeling demolition projects will be increasing. At the same time, by estimating working period through the output, this paper would be helpful to set up the plans for overall project in earlier stage.

Environmental Windows Setting Method for Environmental-Friendly River Dredging in Nakdong River Basin (낙동강 유역의 친환경 하천 준설을 위한 환경창 수립 방안)

  • Jeong, Anchul;Kim, Seongwon;Kim, Minseok;Jung, Kwansue
    • Journal of Environmental Policy
    • /
    • v.14 no.4
    • /
    • pp.45-61
    • /
    • 2015
  • The river environment in Korea has changed significantly after the completion of the Four Major Rivers Project due to the outdated river management methods and thus, it is necessary to modify the current river management process. A typical example of this management is dredging but it is a method that usually results in socio-environmental side effects. Therefore, in order to minimize the socio-environmental impacts of dredging, Korea is currently applying the Environmental Windows, a management practice currently being used in the United States that eliminates the risk of potentially harmful impacts of dredging. The use of statistical methods was suggested to address the issue of data insufficiency and this methodology was applied in the downstream part of the Gangjeong-Goryeong weir located within the Nakdong river basin. The results show that when performing a month of dredging, the optimal period is March whereas the optimal month to start dredging is August in case of an eight-month dredging project. If Korea's flood season is also considered for an eight-month dredging process, then October is the optimal month to start dredging. Non-structural methods such as the Environmental Windows reduce maintenance costs and also bring only short-term side effects to the environment, as opposed to structural methods such as the development of environmentally-friendly dredging machine. Given that few studies have explored this topic in Korea, the findings and suggestions could serve as basic data in studying river dredging in the future.

  • PDF