• Title/Summary/Keyword: Program Management Information System

Search Result 1,083, Processing Time 0.029 seconds

A Sheme of the Database and System Framework for Construction IETM(Interactive Electronic Technical Manual) (건설분야 전자매뉴얼의 프레임워크 및 데이터베이스 구축 방안)

  • Kang, Sung-Hun;Park, Moon-Seo;Lee, Hyun-Su;Ji, Se-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.340-343
    • /
    • 2008
  • Recently, the construction industry is getting more complex and sophisticated having the characteristics of a mega project. Mega project pursues a value that can't be gained with an approach of seeing a project as just a simple sum of different parts but a mutual combination. Hence to reach the goal, program management is needed rather than project management. program management can be seen as a 'total project management' and for an efficient program management prompt support for decision making is required. However, the current supporting method can't fulfill the requirements, therefore, need a tool to support the decision making and a IETM is expected to take this role. Despite the a lot of expected advantages of IETM, it is still difficult to apply because of the frequent changes of information in specifications and laws. In this research, as part of developing a IETM, we aim to propose a system frame which is based on the analysis of processes of a project. Moreover, based on this frame, a database will be built to contribute towards the application of construction IETM in the domestic construction industry.

  • PDF

Developing English Reading Program Model for Strengthening Public Library Brand (공공도서관 브랜드 강화를 위한 영어장서 독서프로그램 모형 개발 연구)

  • Oh, Kyung-Mook
    • Journal of the Korean Society for information Management
    • /
    • v.28 no.4
    • /
    • pp.221-242
    • /
    • 2011
  • The changes of university entrance system which is affecting public library management and services, and current situation of private education market were analyzed for this study. It was revealed that we have several competitive forces that determine library service justification in Korean service environment(market) which has not experienced in the developed countries. The elements of private education may drive competition in the book reading service industry. Such elements effectuate serious problems and discourage library service marketing to the user. For a sustainable competitive advantage, English language collection and reading program model was developed for library marketing strategies(as applying leverage).

Six Sigma and the Cost of(Poor) Quality

  • Aca;U, Jichao-X
    • International Journal of Quality Innovation
    • /
    • v.3 no.2
    • /
    • pp.159-173
    • /
    • 2002
  • Any organization's Six Sigma program may be at high risk without heeding the lessons learned from the past and that tries to operate without a robust business foundation. A foundation that preferably should consist of stepping-stones such as a 5-S house-keeping program, an effective Integrated Management System (IMS), which includes a strong focus on planning for quality to fully capture the Voice of the Customer (VOC), and an organization-wide training scheme, as well as a reliable Cost of Poor Quality (COPQ) system. That's the best advise I can give to any organization that wishes to embark on a Six Sigma improvement program and hope to be successful. The paper will elaborate on the above issues and provide suggested solutions based on the review of published historical information and the experiences encountered over the last four decades by the author, as a quality practitioner and consultant, in industries that produced safety-critical product. This author maintains that few fundamentally new or useful things have been created in the field of Quality during the last couple of decades. Nevertheless, this paper deliberates on a number of relatively “newer” issues including the concept of “three types of customers”, the CTC, “Critical To Customer” term, the eight Quality Management Principles of the new ISO 9000 family, the growth of industry-specific standards, the adoption of Integrated Management Systems, the rebirth of AS2561 COQ standard, the spread of Six Sigma as well as related ASQ certification and the need for a robust business foundation to ensure Six Sigma survival.

A Study on Programmable Logic-based Smart Peak Power Control System (프로그램 로직 기반의 스마트 최대 전력 관리 시스템에 관한 연구)

  • Lee, Woo-Cheol;Kwon, Sung-Hyun
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.2
    • /
    • pp.92-99
    • /
    • 2014
  • The paper is related to smart maximum power system based on program logic. Especially, this system compares the total demand power with the target power by using the signal from the digital kilo watt meter. Based on the power information by the maximum power control equipment the consumed future power is anticipated. In addition, through consumed future power the controllable target power is set, and it applies on the maximum power control equipment. User or manager would control the load efficiently through the simple programming which could control load based on the control sequence and relay. To begin with the conventional maximum power control algorithm is surveyed, and the smart maximum power control system based on program logic is used, and the new algorithm from full load to proportion shut down is proposed by using PLC program. the validity of the proposed control scheme is investigated by both simulation results.

WEB FRONT-END COMPUTING RELATIONAL DATABASE SYSTEM FOR ITEM-LEVEL PRELIMINARY HIGHWAY COST ESTIMATES

  • Jui-Sheng Chou ;James T. O'Connor ;Khali R. Persad ;Wai Kiong Chong
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.509-514
    • /
    • 2005
  • In recent years, use of the web technologies and on-line process has immensely swapped single-user platform practice. This study attempted to develop preliminary cost estimating program by means of Web technologies based on statistical modeling results. A prototype Web-based Preliminary Item-Level Cost Estimating System (WBPILCES) using open source software was developed as an on-line estimating tool in this research. The primary objective is to study the possible flexibility of implementing a centralized information system that will be maintained by the Texas Department of Transportation (TxDOT) IT division. The full-scale deployment of proposed information architecture is expected to seamlessly integrate with legacy database system currently used by TxDOT so as to streamline data storage, cost growth tracking and estimates documentation.

  • PDF

Implementation of Real-Time Monitoring System for Livestock Growth Environment Information using Wireless Sensor Network (무선센서 네트워크를 이용한 가축생육환경정보 실시간 모니터링 시스템 구현)

  • Kim, Young-Wung;Paik, Seung-Hyun;Jon, Yong-Jun;Lee, Dae-Ki;Park, Hong Bae
    • IEMEK Journal of Embedded Systems and Applications
    • /
    • v.7 no.6
    • /
    • pp.301-309
    • /
    • 2012
  • In this paper, a real-time monitoring system based on WSN is designed and implemented to monitor livestock growth environment information which includes the temperature, humidity and harmful gases such as $CO_{2},\;CO,\;NH_{3},\;H_{2}S$ and so on. The proposed system consists of the wireless sensor nodes, the monitoring management device, the management server and the user interface program based on PC/Smart phone. To verify the performance of the implemented system, gas measurement experiments are performed in laboratory environment by using the designed wireless sensor nodes. And it is able to estimate the concentration of gases. The implemented system is able to monitor the proposed environmental element information through the developed GUI.

Decision Support System for Project Duration Estimation Model (프로젝트기간 예측모델을 위한 의사결정 지원시스템)

  • 조성빈
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 2000.11a
    • /
    • pp.369-374
    • /
    • 2000
  • Despite their tilde application of some traditional project management techniques like the Program Evaluation and Review Technique, they lack of learning, one of important factors in many disciplines today due to a static view far prefect progression. This study proposes a framework for estimation by learning based on a Linear Bayesian approach. As a project progresses, we sequentially observe the durations of completed activities. By reflecting this newly available information to update the distribution of remaining activity durations and thus project duration, we can implement a decision support system that updates e.g. the expected project completion time as well as the probabilities of completing the project within talc due date and by a certain date. By Implementing such customized systems, project manager can be aware of changing project status more effectively and better revise resource allocation plans.

  • PDF

Decision Support System for Project Duration Estimation Model (프로젝트기간예측모델을 위한 의사결정지원시스템)

  • 조성빈
    • Journal of Intelligence and Information Systems
    • /
    • v.6 no.2
    • /
    • pp.91-98
    • /
    • 2000
  • Despite their wide application of some traditional project management techniques like the Program Evaluation and Review Technique, they lack of learning, one of important factors in many disciplines today, due to a static view for project progression. This study proposes a framework for estimation by loaming based on a Linear Bayesian approach. As a project Progresses, we sequentially observe the durations of completed activities. By reflecting this newly available information to update the distribution of remaining activity durations and thus project duration, we can implement a decision support system that updates e.g., the expected project completion time as well as the probabilities of completing the project within the due bate and by a certain date. By implementing such customized system, project manager can be aware of changing project status more effectively and better revise resource allocation plans.

  • PDF

A Study on the Construction of Help-Desk Knowledge Management System Model in the Web Environment (Help-Desk 지식관리시스템 모형구축에 관한 연구)

  • Chang, Woo-Kwon
    • Journal of Korean Library and Information Science Society
    • /
    • v.35 no.4
    • /
    • pp.423-449
    • /
    • 2004
  • In the knowledge society the main resource is knowledge, and the role of library to manage knowledge and information is very important. Therefore it is necessary to knowledge and information management that provides on demand service to user. The purpose of this research is to design model for web-based help-desk knowledge management system. This study used Qualitative methods as interviews and surveys through BBS and e-mail on information service in the university libraries. Here the investigated component factors are followings Q/A service user's education service to use the library, user's online reference service, e-mail service, FAQ service electronic service(BBS), lecture and research service for faculty, my library, SDI service, and open data service. This study was financially supported by Chonnam National University in the program, Post-Doc. 2002.

  • PDF

A Survey for Computerized Information System of Occupational Health Management at Worksite (사업장 산업보건 정보관리 전산화 실태조사)

  • Jo, Heui-Sug;Ha, Eun-Hee;Hong, Yun-Chul;Kim, Chul-Hwan;June, Kyung-Ja;Park, Hye-Sook
    • Journal of Preventive Medicine and Public Health
    • /
    • v.31 no.2 s.61
    • /
    • pp.215-227
    • /
    • 1998
  • In order to develop the computerized information system of occupational health management at worksite, we surveyed actual states of computer use at worksites. We used a self-administrative questionnaire to the members of Korean Association of Occupational Health Nursing(KAOHN) from July 4 to August 21 in 1997. Among the members of KAOHN, 147 members answered. The worksites where they were employed were very diverse in aspect of jobs, locations, and size. Occupational health computerized system was used at 30(20.4%) worksites among 147 respondants. When they first introduced the computerized system the most difficult problem was the lack of support of manager. The programs that they have used mainly consist of drug management, health examination management, disease management, but the program of worksite environment management have been rarely used. Most users felt that the computerized system was effective, but there were problems in connection within programs. Many worksites have plans to take or expand the computerized information system within several years. It is necessary to develop the effective and integrated occupational health computerized system.

  • PDF