• Title/Summary/Keyword: Procurement selection

Search Result 59, Processing Time 0.022 seconds

A Decision Support System for Supplier Selection in B2B E-procurement (전자조달을 위한 공급자 선택 지원 시스템의 개발)

  • 하성호;남미성
    • Korean Management Science Review
    • /
    • v.21 no.1
    • /
    • pp.113-129
    • /
    • 2004
  • Nowadays many enterprises build e-procurement systems. An e-procurement is a Web-based procurement process and its functionalities are considered important in the B2B e-commerce. Buyers should select competent suppliers for a successful e-procurement. Therefore, this study proposes a method using the analytic hierarchy process(AHP) for building a Web-based supplier selection system. In detail, the purpose of this study is (1) to review methods previously used when buyers selecting suppliers and to extract important selection criteria: (2) to explain extended AHP method adopted by this study among supplier selection methods: (3) to describe the supplier selection steps using extended AHP : and (4) to propose a decision support system embedding the methodology described above. The proposed system comprises of three phase: first phase is to evaluate suppliers on enterprise level: second phase to evaluate them on each transaction level: third phase to post-evaluate them.

Donor Selection, Management, and Procurement for Lung Transplantation

  • Yu, Woo Sik;Son, JeongA
    • Journal of Chest Surgery
    • /
    • v.55 no.4
    • /
    • pp.277-282
    • /
    • 2022
  • Lung transplantation is a life-saving procedure in patients with end-stage lung disease. However, it inherently depends on the availability of donor organs. The selection of suitable lungs for transplantation, management of donors to minimize further injury and improve organ function, and safe procurement remain critical for successful transplantation. In this review, we provide an update on the current understanding of donor selection, management, and lung procurement.

The Impact of Design-Bid-Build Procurement Methods on Project Performance in Libya

  • Ghadamsi, Alaeddin;Braimah, Nuhu
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.2
    • /
    • pp.16-23
    • /
    • 2016
  • The use of inappropriate procurement methods to deliver construction projects has long been acknowledged as a major source of poor project performance and is particularly problematic for the Libyan Construction Industry. Poor procurement method selection has been recognised as a major contributory factor to frequent time and cost overruns. This paper offers a way of selecting specific procurement methods to maximize successful project performance. The methodology involves an intensive review of relevant literature, followed by a semi-structured questionnaire survey. The key findings of the study reveal that 11 out of its 12 common selection criteria exhibit a significant contribution to one or more project performance criteria (time, cost and quality). Project clients should therefore prioritise these criteria when selecting a design-bid-build method. Knowledge of the criteria that contribute positively to project performance will also enable clients to work out, prior to and during construction, the best measures and provisions for successful project outcomes.

A Study on Decision-making of Equipment Procurement for Plant Operations & Maintenance (O&M) - Focused on Technology Strategy perspective - (플랜트 O&M을 위한 기자재 조달방식 의사결정에 관한 연구 - 기술전략 관점을 중심으로 -)

  • Hong, Daegeun;Lim, Yongtaek
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.15 no.1
    • /
    • pp.25-33
    • /
    • 2019
  • In the plant industry, the share of equipment accounts for 45 ~ 75%, which is very high. It is a traditional plant centered on processes and reactions like petroleum and chemical plants. Renewable energy generation plants such as wind power generation and solar power generation are equipment-centric plants. Equipment-centric plants are very important not only in the EPC phase but also in the operation and management phase. The procurement of equipment for plant operation and management can be divided into make and buy. Make is a method of producing equipment itself, and buy is a method of procuring equipment from the outside. The procurement method of the equipment directly affects the plant operation and management cost. In this study, the decision making of equipment procurement method for plant operation and management is defined as 4 phase. Each phase is selection of procurement decision-making objects, technology strategy perspective, finance perspective, and production perspective. In detail, we defined selection process of procurement decision-making objects and technology strategy perspective process. We will contribute to the enhancement of the competitiveness of the plant operation and management area by carrying out researches on the process and application examples of financial and production perspectives in the future.

eProcurement System Implementation Cases & G2B Innovation Scheme

  • Choe, Yeong-In
    • Proceedings of the CALSEC Conference
    • /
    • 2001.08a
    • /
    • pp.25-33
    • /
    • 2001
  • eProcurement System io for the improvement of costs and productivity, and consists of eCatalog, eSourcing supporting the supplier selection, and ePurchase system supporting purchase request, approval, and PO.(omitted)

  • PDF

Design of the Procurement Engineering Support System : A Case Study (구매엔지니어링 관리지원시스템 상세 설계 사례 연구)

  • Kim, Jinil;Yeom, Choongsub;Shin, Joonguk;Salim, Shelly
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.14 no.2
    • /
    • pp.33-40
    • /
    • 2018
  • This paper is based on the interim result of ongoing research and development project to develop a software system which support procurement activities, namely PeMSS (Procurement Engineering Management Support System). PeMSS is a system that enables development requirements for each equipment and help designing equipment meeting the purchase requirements. Procurement at EPC (Engineering Procurement and Construction) and operational stage of a plant is an important area that determines the integrity and profitability of the plant. Procurement of unsuitable equipment due to selection of suppliers that do not meet or omit critical requirements in purchase specification can result in enormous cost increase due to such as delay in EPC project, unsatisfactory performance and reduced plant operation time. In spite of the importance of the procurement engineering, there is a lack of support system for systematic preparation of purchase specification, so development of the procurement specification is basically relying on the experience of the engineers in charge. Accordingly, it is needed to develop the PeMSS to help procurement engineers develop procurement specification based on systems engineering approach. This paper introduces the design of the PeMSS.

Improvement of Architecture-Engineering Service Procurement System for Public Construction Project (건설기술용역 발주 및 입·낙찰 방식의 문제점 및 개선방안)

  • Kim, Sung-Il;Chang, Chul-Ki;Park, Dae-Keun;Bae, Yu-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.61-70
    • /
    • 2014
  • Various procurement systems for Architecture-Engineering service for public construction project are currently established by construction-related law. However, comprehensive framework and criteria for the selection of Architecture-Engineering firm are in absence. Even though various selection methods for Architecture-Engineering service are currently established by law, cost-based selection method is mainly used in selecting Architecture-Engineering firm for the service. This paper examined current use of procurement system for Architecture-Engineering service and drew problems in practice. Through analysis of problems and bench-marking of those systems in advanced countries and international organizations, several strategies to improve performance of Architecture-Engineering service and to maximize the efficiency were suggested. The suggestions include framework and guideline to select a procurement method for the service which is being considered for the project and way of improving current procurement system. These suggestions will be a foundation for utilizing appropriate procurement system for the specific project and can make domestic Architecture-Engineering firm more competitive in the global market by breaking form the cost-based selection method in the selection of Architecture-Engineering firms.

Gradational Risk Management in Procurement Phase for Plant Projects (플랜트 프로젝트의 구매조달 단계별 리스크 분석에 관한 연구)

  • Na, Sung-Yub;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.3
    • /
    • pp.59-65
    • /
    • 2009
  • In the plant EPC project, the procurement work can be considered as the most important part that affects the success or failure of project as it has the closest mutual influence in every execution process of the project. Procurement takes up generally 60% ~ 70% of the entire project budget and the current trend of plant EPC project becoming larger in scale and a variety of process technology being applied. So, it is needed to identify the risks that are expected to occur according to the stages of procurement work, namely, proposal stage, manufacturer selection and purchasing agreement stage, expediting the process management of manufacturer stage, inspection stage and logistics & transportation stage. The management of observation and control of the risks should be performed with the response techniques which are 'avoid',' transfer'and' mitigate'.

  • PDF

A Study on the Technology Evaluation Index for Superior Product Selection in the Public Procurement System : Focusing SME Technological Innovation (중소기업의 기술혁신 촉진을 위한 우수조달물품 지정제도 평가항목 개선방안에 관한 연구)

  • Cho, Daemyeong;Lee, Saehun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.2
    • /
    • pp.19-26
    • /
    • 2014
  • With the radical changes and advancements of industrial economy, it is required to secure product competitiveness through technological innovations to overcome uncertain environments and generate a driving force for sustainable growth. So the Korea government introduced the superior product selection system in 1996 and has granted such incentives as priority purchasing and contracts the products of SME whose technological capabilities have passed the screening criteria. After analyzing the ambiguity of the evaluation procurement used in designation of excellent product, this study proposed seven detailed indexes for evaluation.

A Study on Supplier Relationship Management System for National Public Procurement (국가 공공조달을 위한 조달업체 평가관리 시스템에 대한 연구)

  • Lee, Ig-Hoon
    • The Journal of Society for e-Business Studies
    • /
    • v.16 no.1
    • /
    • pp.101-116
    • /
    • 2011
  • As e-Commerce and national public procurement have been enabled, needs of supplier management and evaluation system for national public procurement has been growing. Enterprises have constructed and operated supplier relationship management system, in order to automate and increase their supply chain processes by managing the strategic assessment of relationships with external partners. Recently, PPS(Public Procurement Service) in Korea is introducing the concept of SRM to ensure the fairness of public procurement and to strengthen the competitiveness of the national public procurement and public procurement. For this purpose, it is necessary to establish supplier evaluation management and decision support process to allow a transparent supplier selection. In this paper, we present an evaluation method for transparent and objective public procurement. We also present a method for purchase decision support.