In construction sites, policies are changing considering the convergence of 3D scanning and BIM. In order to respond to this, it is urgent to develop guidelines for systematic collaboration methods that take into account the perspectives of practitioners. By participating in the delivery process using 3D scanning technology, tasks such as ordering, field scanning are defined in terms of mutual communications. Also, the collaboration process is about communications between off-site and on-site, such as feed-back using data and documents. In the future, we will propose guidelines based on such collaborative process models.
The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.23-30
/
2011
The people in the AEC industry have acknowledged and long struggled to solve the critical low productivity issue of the entire construction industry. Integrated Project Delivery has been suggested as a solution to this problem and to take this into practice many countries have come up with BIM guidelines. In order to make this a success, BIM design process and LOD must be dealt in advance. The following research has selected 3 out of 16 guidelines that specifically describes BIM process and LOD, and intends to fully acknowledge its concept by comparing the approach and definition of LOD in the BIM Design Process.
Recently, there have been various attempts for the adoption and spread of Building Information Modeling (BIM) in the construction industry. However, the spread of BIM has been less satisfied than expected, because of the insufficient, expensive hardware and software for the authoring, analysis and so forth. As a solution to resolve the obstacles, the applications of cloud computing technology to BIM have been introduced. Due to the vendor-dependent functions and lack of verification on the work process, the spread of cloud-based BIM has been limited in Korea. Therefore, this study proposes the functions of cloud computing services which can support BIM-based design processes through the review of practitioners, questionnaire survey and analysis of design process.
For decades, the productivity issue has been a primary concern for the all stake-holders who participate in domestic construction industry. Especially, between a whole life cycle of building, the construction phase's productivity problem makes or break the entire project. In this respect, the general construction company, who accept the order and construct the building(so called General Contractor), should consider various strategies, such as schedule management, cost management, quality management, inner-crew management, etc., for the productivity improvement., and almost of these management methods have been studied for a long time. But, the researches and studies about the specialty contractor, who construct the building directly in construction site were not sufficiently complete yet. This research begins as an idea which tries to apply the BIM(Building Information Modeling) into the tasks of Specialty contractors for their productivity improvement. And for the effective application of construction BIM to specialty contractors, establish of the BIM project execution plan for them, not the fragmentary adoption of BIM. Therefore, in this paper, we develop the BIM project execution plan for the reinforced concrete companies who conduct the framework construction which located on CP(Critical Path) Especially, we model the "Construction BIM Use List for the RC Work", "BIM Application Master Process" and "BIM Application Detailed Process", and general contractor who use these BIM uses list and process models can manage various specialty contractors about schedule, cost, earned value, quality, safety and environment management systematically.
본 연구의 목적은 BIM/GIS 기반 에너지 분석을 지원할 수 있는 에너지 정보 모델링 프로세스 참조 모델(BG-EIM PRM)을 제안하는 것이다. 이러한 연구를 통해 분야별 에너지/환경 분석 목적에 맞는 BIM/GIS 기반 에너지 정보 모델링을 위한 상세 프로세스와 고려사항을 도출하였으며, 향후 BIM/GIS 기반의 건축물 에너지 및 환경성능 시스템 구축을 위한 방법론 개발에 기여할 수 있다. 이를 위해, 관련 연구를 조사하고, 신축과 기존 건물에 대한 에너지 모델링 프로세스를 분석한다. 그리고, 분석 결과를 기반으로 프로세스의 각 단계를 정의한 후, BIM/GIS기반 에너지 분석 시 고려사항을 도출하여, BG-EIM PRM을 제안한다.
Building Information Modeling (BIM) provides many advantages when it is adopted in virtual design construction, to analyze constructability, etc. For this reason, advanced countries have made it mandatory to adopt BIM in public construction projects. The Korea Public Procurement Service announced that from 2016, BIM adoption will be mandatory in every construction project in Korea. Currently, however, it is not possible to fully adopt BIM in the building design process domestically because BIM-based systems have not been used broadly in Korea's building approval system (Seumter). In this research, four challenges were drawn from a focus group interview. Focusing on tackling one challenge, this paper reviewed previous research into building approval systems and the building approval systems of Singapore, the U.K. and the U.S., and identified elements of the building approval application process and presents a system to create and manage the information. The system supports the creation and management of information and 2D drawings from an IFC-based BIM model. We expect that the system will encourage designers to use BIM from the beginning of the design process and ultimately increase the efficiency of design in a BIM-based project.
The purpose of this paper is to find the preconditions of BIM based new design process. As BIM technology improves, investigating new design process will become a greater priority. Our traditional, linear and fragmented design process is not freed from a long-pending questions of poorly coordinated drawings and low production efficiencies. Rather the traditional process is one of the major causes of such issues of low productivity. AIA and NIST proposed new design process to fulfill clients' need for fast and precise delivery recently. The common goal of these two should be better, faster and more precise project delivery created by integration. And we need to create collaborative concurrent design process to optimize the design efforts, But our local AE industry's circumstances are quite different with foreign countries. Therefore, integrated project system cannot be adopted as it stands in foreign countries. This paper will investigate preconditions to expedite the progress of BIM based design process in Korea.
최근 국내에서도 토목분야에 BIM을 활용하는 범위나 빈도가 점점 증가하고 있다. 하지만 전면설계로써 BIM을 적용하는 것이 아닌 2D 설계 이후 BIM 모델링을 수행하는 전환설계로써 BIM을 활용하고 있다. 본래 목적에 맞게 BIM을 활용하기 위해서는 전면설계로써 BIM을 활용해야 하지만, 갑작스러운 변화는 오히려 시장의 혼란과 BIM에 대한 거부감을 높일 수 있기때문에 전환설계로써 BIM 활용을 통해 단계적 BIM 정착을 진행하고 있다. 하지만, 현재 기본 설계단계에서 수행하고 있는 전환설계 방법은 낮은 업무 효율성으로 인해 실제 업무 적용에 많은 어려움이 따르고 있다. 따라서 본 연구에서는 현재 전환설계로써 BIM을 활용하는 기존의 프로세스를 분석하고 기존 프로세스에서 문제점을 보완할 수 있는 기본설계단계에서의 BIM 적용 프로세스를 제안하고자 한다.
건설산업 분야에서 빌딩정보모델링(BIM)은 단지 설계를 보다 쉽게 지원하고, 3차원 모델을 구현하기 위한 도구만은 아니다. 왜냐하면, 설계, 시공, 유지관리 및 철거에 이르는 건설 생애주기 동안의 다양한 데이터를 입력하고 관리가 가능하도록 구조화 되어 있기 때문이다. 이렇게 구조화된 모델을 가지고 다양한 분석 및 해석이 가능해지기 때문에 BIM의 역할은 점점 더 증대되어 가고 있다. 노르웨이 베스트바넨의 국립예술박물관 현상설계 경기를 시작으로 국내외적으로 BIM을 설계 경기 및 평가에 적용하려는 노력이 다각적으로 발생하고 있다. 이때, 기존 방식의 설계경기와는 다르게 BIM기반으로 전사적인 시뮬레이션을 통한 자동적이며, 신뢰성이 높고 효율적인 평가가 가능하게 된다. 이를 위하여 각 BIM 도구를 대상으로 하는 모델링 가이드가 필요하며 이를 검증할 수 있는 평가시스템의 요구가 생기게 되었다. 본 논문은 건설산업 분야에 새로운 패러다임을 이끌고 있는 BIM 기술을 이용한 새로운 방식의 설계평가 및 절차의 방향에 대해, 전력거래소 본사사옥 등의 이전 설계경기 사례를 비교분석하고 이에 대한 개선방안을 설명함으로써 향후 발주될 BIM기반 건축설계경기 평가의 방향을 제시하고자 한다.
국내 토목분야의 건설 산업은 비효율적인 의사소통으로 인하여 업무전환단계에서의 정보 누락 및 그로 인한 비용손실 등의 문제점이 발생한다. 이러한 문제점에 대한 해결책으로 BIM의 도입이 대두되고 있다. BIM은 구조물의 생애주기 전 단계에서 발생되는 모든 정보들을 3차원 파라메트릭 CAD와 연계된 3차원 정보모델을 통하여 관리하여 정보 활용의 효율성을 극대화 시킨다. 본 논문에서는 BIM기반의 교량 건설 프로젝트의 구조설계업무에서 사용할 목적으로 3차원 정보모델을 활용한 교량의 구조설계 프로세스를 제안하였다. 제안된 프로세스는 구조설계업무를 통하여 결정되는 정보들을 활용하여 3차원 정보 모델링작업이 이루어질 수 있도록 구성하였다. 또한 제시된 프로세스를 활용하여 현재 건설이 진행 중인 스틸박스 교량의 상부구조를 대상으로 구조설계의 최종 산출물인 구조계산서를 구축된 BIM기반의 구조설계 프로세스를 활용하여 도출할 수 있도록 구성하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.