1 |
Kim, K-H, Kim, K-H, Lee, Y-S, Kim, J-J (2008), "A Study about Influence of Risk Factors in Relation to Construction Cost Increase and Schedule Delay on the Reinforced Concrete Construction", Journal of the Architecture Institute of Korea, Vol. 24 No. 5, pp. 165-172.
|
2 |
Kim, M-C, Son, C-B (2010) "Analyzing the Level and Influence Factors for Work Performance of Field Managers in Specialty Contractors", Journal of the Architecture Institute of Korea, Vol. 26 No. 5, pp. 133-140.
|
3 |
Kim, M-C, Son, C-B (2010) "A Status Analysis on the Organization and Service for Job Site Management of Specialty Contractors in Reinforced Concrete Work", Journal of the Architecture Institute of Korea, Vol. 26 No. 4, pp. 151-158.
|
4 |
Kim, S-Y, Min, C-H, Kim, H-S, Kim, C-H, Kang, I-S (2011) "Development of BIM Operation Model for the Construction Phase by Analyzing BIM Technology", Proceeding of the Korea Institute of Construction Engineering and Management, pp. 333-334.
|
5 |
Kim, Y-H, Lee, J-S, Oh, J-G, Kim, J-J (2013), "A Study for Derivation of Participant's Information Flow At Framework Construction based on BIM", Journal of the Korea Institute of Construction Engineering and Management, Vol. 14 No. 2, pp. 22-34.
|
6 |
Park, K-H, Son, C-B (2010) "Analyzing the Level and Influence Factors for Work Performance of Field Managers in General Construction Companies", Journal of the Korea Institute of Construction Engineering and Management, Vol. 11 No. 3, pp. 115-124.
DOI
ScienceOn
|
7 |
Park, J-H, Jeon, H-B, Cho, K-M, Hong, T-H, Koo, K-J, Hyun, C-T (2008), "Improvement Factors for Reinforced Concrete Firm against Removing the restriction of Construction Market Activation", Journal of the Korea Institute of Construction Engineering and Management, Vol. 8 No. 1, pp. 118-125.
|
8 |
Song, S-M, Seo, J-H, Lee, C-H, Kim, Y-S, Cho, H-H (2011), "A Deduction of Key Work for Service Guide of Construction Manager in Construction Project", Journal of the Korea Institute of Construction Engineering and Management, Vol. 12 No. 4, pp. 11-20.
|
9 |
Ahn, Y-S, Lee, L-H (1993), "Productivity Analysis for Formwork Operation of Concrete Structure", Journal of the Korea Concrete Institute, Vol. 5 No. 1, pp. 175-181.
|
10 |
Ahn, J-B, Song, Y-O, Choi, Y-K (2009), "Quality Risk Management System for Steel Structure Construction", Journal of the Architecture Institute of Korea, Vol. 25 No. 4, pp. 209-217.
|
11 |
Yoon, Y-S, Seo, S-W, Park, M-S, Jang, M-H (2008), "Construction Process based Schedule Risk Management System", Journal of the Korea Institute of Construction Engineering and Management, Vol. 9 No. 4, pp. 101-110.
|
12 |
Lee, J-H, Lee, H-S, Kim, M-H (1996), "A Scheduling Method of Reinforced Concrete Construction in Apartment Housing Projects Focused on Formwork Crews", Journal of the Architecture Institute of Korea, Vol. 12 No. 4, pp. 261-269.
|
13 |
Lee, H-C, Lim, S-Y, Yeo, S-K, Ko, S-S (2009), "A Study on the Work Delay Factors of Reinforced Concrete Work in Apartment House Construction", Journal of the Korea Institute of Building Construction, Vol. 8 No. 2, pp. 55-61.
|