A Study on the Improvement of Subsidy Program for CHP Plant Connected with Capital Region District Heating System (수도권 지역난방연계 열병합발전소의 기반기금 지원과 개선방안)

  • 김창수;이창호
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.2
    • /
    • pp.97-103
    • /
    • 2004
  • CHP system supplies electricity and heating together with high efficiency. Current utility's CHP system uses electric power by itself and sells thermal energy to KDHC(Korea District Heating Corporation). CHP's operation cost except sales revenue of heating was covered by the sale revenue of electricity. Thus Electric generation cost in district Heating CHP system has close relationship with the level of heating price. However, after the restructuring of electricity industry, the operation cost could not be covered by sales revenue of heating and electricity. This loss was compensated by energy subsidy program in the electric power industry infrastructure fund. This paper suggests reasonable evaluation and improvement methods of the loss calculation of CHP system utilizing the infrastructure fund efficiency In terms of the direction of support by the fund, it provides the methods to prevent inefficient operation through setting up the upper limit of subsidy and to improve the loss calculation. Moreover, it suggest fixed rate support by heating supply level and reducing subsidy gradually for an efficient operation of CHP system.

Calculation of Pressure Rise in the Puffer Cylinder of EHV GCB Without Arc (무부하시의 초고압 GCB의 파퍼실린더 내부의 상승압력 계산)

  • Park, K.Y.;Song, K.D.;Choi, Y.K.;Shin, Y.J.;Song, W.P.;Kang, J.H.
    • Proceedings of the KIEE Conference
    • /
    • 1994.07b
    • /
    • pp.1559-1561
    • /
    • 1994
  • At present, the principle of puffer action in high current interruption is adopted in almost of the EHV(Extra High Voltage) and UHV(Ultra High Voltage) GCB(Gas Circuit Breakers). The thermal interruption capability of these GCBs critically depends on the pressure rise in the puffer cylinder at current zero. The pressure rise in the puffer cylinder depends on the puffer cylinder volume, flow passage and leakage area in the interrupter, stroke curve etc. Recently commercial CFD(Computational Fluid Dynamics ) packages have been widely adopted to calculate the pressure distribution in the interrupter. However, there are still several problems with it, e.g. very expensive price, moving boundary problem, computation time, difficulty in using the package etc. Thus, the calculation of the puffer cylinder pressure in simple and relatively correct method is essential in early stage of GCB design. In these paper, the model ing technique and computed results for EHV class GCB (HICO, 145kV 40kA and 362kV 40kA GCB) are presented and compared with available measured results.

  • PDF

The Container Pose Measurement Using Computer Vision (컴퓨터 비젼을 이용한 컨테이너 자세 측정)

  • 주기세
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.8 no.3
    • /
    • pp.702-707
    • /
    • 2004
  • This article is concerned with container pose estimation using CCD a camera and a range sensor. In particular, the issues of characteristic point extraction and image noise reduction are described. The Euler-Lagrange equation for gaussian and random noise reduction is introduced. The alternating direction implicit(ADI) method for solving Euler-Lagrange equation based on partial differential equation(PDE) is applied. The vertex points as characteristic points of a container and a spreader are founded using k order curvature calculation algorithm since the golden and the bisection section algorithm can't solve the local minimum and maximum problems. The proposed algorithm in image preprocess is effective in image denoise. Furthermore, this proposed system using a camera and a range sensor is very low price since the previous system can be used without reconstruction.

A methodology for uncertainty quantification and sensitivity analysis for responses subject to Monte Carlo uncertainty with application to fuel plate characteristics in the ATRC

  • Price, Dean;Maile, Andrew;Peterson-Droogh, Joshua;Blight, Derreck
    • Nuclear Engineering and Technology
    • /
    • v.54 no.3
    • /
    • pp.790-802
    • /
    • 2022
  • Large-scale reactor simulation often requires the use of Monte Carlo calculation techniques to estimate important reactor parameters. One drawback of these Monte Carlo calculation techniques is they inevitably result in some uncertainty in calculated quantities. The present study includes parametric uncertainty quantification (UQ) and sensitivity analysis (SA) on the Advanced Test Reactor Critical (ATRC) facility housed at Idaho National Laboratory (INL) and addresses some complications due to Monte Carlo uncertainty when performing these analyses. This approach for UQ/SA includes consideration of Monte Carlo code uncertainty in computed sensitivities, consideration of uncertainty from directly measured parameters and a comparison of results obtained from brute-force Monte Carlo UQ versus UQ obtained from a surrogate model. These methodologies are applied to the uncertainty and sensitivity of keff for two sets of uncertain parameters involving fuel plate geometry and fuel plate composition. Results indicate that the less computationally-expensive method for uncertainty quantification involving a linear surrogate model provides accurate estimations for keff uncertainty and the Monte Carlo uncertainty in calculated keff values can have a large effect on computed linear model parameters for parameters with low influence on keff.

A STUDY ON THE LIFE CYCLE COST ANALYSIS IN LIGHT RAIL TRANSIT BRIDGES: FOCUSED ON SUPERSTRUCTURE

  • Lee Du-heon;Kim Kyoon-tai;Kim Hyun Bae;Jun Jin-taek;Han Choong-hee
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.30-40
    • /
    • 2007
  • The demand for light-rail construction projects has recently been increasing, and they are mostly supervised by private construction companies. Therefore, a private construction company that aim to raise gains from the operation of the facilities during the contract period greater than what they invested should b able to accurately calculate the costs from the aspect of Life Cycle Cost (LCC). In particular, a light-rail transit bridge that has a heavier portion from the aspect of the cost of light-rail transit construction requires a more accurate calculation method than the conventional LCC calculation method. For this, an LCC analysis model was developed and a cost breakdown structure was suggested based on literature review. The construction costs by shape of the upper part of a light-rail transit were calculated based on the cost breakdown system presented in this paper, and the cost generation cycle and cost unit price were collected and analyzed based on records on maintenance costs, rehabilitation and replacement. In addition, after forming some hypotheses in order to perform the LCC analysis, economic evaluation was conducted from the aspect of the LCC by using performance data by item.

  • PDF

GMP Calculation Process in CM at Risk for Public Construction Project (공공 건설사업 CM at Risk 적용시 GMP 산출 프로세스)

  • Kim, Gun-Sung;Jin, Zheng-Xun;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.48-49
    • /
    • 2020
  • Recently the diversification of construction market and the continuous reduction of construction amount are raising the need of alternative delivery method in the construction industry. The foreign advanced companies actively adopted the CM at Risk delivery method where they perform the service of agent CM in the design phase, and agree GMP(Guaranteed Maximum Price) with the client at the time of 50~80% completion of design. Even in Korea they began to apply that method to pilot projects. In CM at Risk, through the early participation of builder, the level of design completion can be improved and the change order and construction period delay can be minimized. On the other hand, GMP is usually calculated when the design is about 80% complete, so there is uncertainty in the construction cost. Therefore, in this research, the increased amounts of construction cost are analyzed in a number of public construction projects, and GMP calculation process is proposed using the analysis results and CBR(Case-Based Reasoning) technique to reduce the construction cost increase in the construction phase.

  • PDF

A Study on Analysis of Construction Monitoring Cost and Improvement Measures of Railway Tunnel Construction in Seoul (서울시 철도터널 건설공사의 공사계측비 분석 및 개선방안 연구)

  • Jong-Tae Woo
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.18-30
    • /
    • 2023
  • Purpose: This study is to contribute to the development of monitoring technology through the increase of confidence in construction monitoring by deriving the analysis of construction monitoring cost and improvement measures of railway tunnel construction in Seoul. Method: It presents the status on design and contract of construction monitoring cost, status on application construction monitoring cost and its analysis, analysis on safety management cost and quality management cost, expansion of application of the price calculation standard for monitoring management services to improve this, and monitoring for direct order of ordering organization. Results: If the monitoring management service that was meanwhile ordered as included in the construction work is performed by the directly selected company of ordering organization through the preliminary screening for bidding qualification, then the improvement of monitoring quality and the accurate monitoring data can be secured. Conclusion: For the price calculation standard for monitoring management service, the application of actual cost addition method under the Engineering Promotion Act and the calculation standard of monitoring management cost for standard estimation for ground survey should be extended through the direct order of ordering organization, not the method to be included in the net construction cost where it is performed by a subcontractor via contractor.

A Study on the Index Estimation of Missing Real Estate Transaction Cases Using Machine Learning (머신러닝을 활용한 결측 부동산 매매 지수의 추정에 대한 연구)

  • Kim, Kyung-Min;Kim, Kyuseok;Nam, Daisik
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.25 no.1
    • /
    • pp.171-181
    • /
    • 2022
  • The real estate price index plays key roles as quantitative data in real estate market analysis. International organizations including OECD publish the real estate price indexes by country, and the Korea Real Estate Board announces metropolitan-level and municipal-level indexes. However, when the index is set on the smaller spatial unit level than metropolitan and municipal-level, problems occur: missing values. As the spatial scope is narrowed down, there are cases where there are few or no transactions depending on the unit period, which lead index calculation difficult or even impossible. This study suggests a supervised learning-based machine learning model to compensate for missing values that may occur due to no transaction in a specific range and period. The models proposed in our research verify the accuracy of predicting the existing values and missing values.

Analysis of the Spillover Effects on the Management Profits of Offshore Fishery by the Fluctuations in the Crude Oil Prices (원유가상승이 근해어업의 경영수지에 미치는 파급효과 분석)

  • 김현용;강연실
    • The Journal of Fisheries Business Administration
    • /
    • v.32 no.1
    • /
    • pp.15-39
    • /
    • 2001
  • The study, using the input-output analysis of 402 industrial sectors by Bank of Korea(BOK) and the resulting outcomes of price model, aims to evaluate the spillover effects the international fluctuations in crude oil prices have on the commodities prices and consequently, analyse the management and profitability of the offshore fisheries in Korea. At present, the fisher men are provided with tax-free oils for their fishing operations as specified under the Special Tax Treatment Control Law. However, the exhaustion of marine resources and new international fisheries agreements, which resulted in the loss of fishing grounds, made the stable catch even more unpredictable and the hike in the price of the international crude oil would have adverse effects on the fishing industry. The study revealed that the increasing rise in the price of crude oil would exert sweeping spillover effects on other industry sectors in general and accordingly, lead to a poorer performance by fisheries. The price spillover coefficients for the diesel oil was 0.6026, which would translate into the 42.6% increase in the prices of oil when the increase ratio of 73.3% for the base crude oil was applied based on the calculation methods employed in the study. This in turn increased the ratio of diesel oil required in the offshore fisheries from 23.3% to 16.6%, diminishing the ratio of current net profits to minus 2.0% from 4.2% otherwise. By fishing type, the Pair Trawl suffered current net profits loss most by ratio of minus 9.4% and other fisheries such as Coastal Stow Nets, Coastal Angling, Danish Sein also suffered ratio of 7% and more in the loss of current net profits. With the deteriorating fishing performance, coupled with the increasing international crude oil prices, it is urgently required that the authorities concerned deliberate in depth on such schemes as follows in efforts to secure stable fishing production. First, provision of large-scale storage facilities for oil is needed to timely adapt to the fluctuations in international crude oil prices. Secondly, in line with the stabilization of tax-free oil prices, duty levied on oils for fishing and tax collected from the refineries need to be tax-exempt. Thirdly, the beneficiaries from the provision of tax-free oil should be broadened, not limited to special fishing operation only. Fourth, investment in stabilization of the oil prices should be encouraged, possibly through funding from the formation of fisheries development funds underway.

  • PDF

An Analysis on the Propriety of Labor Input at Design Stage in Construction Management (건설사업 관리에 있어서 설계이전단계의 인력투입 적정성 분석)

  • An, Yang-Hoan;Kim, Young-Ai;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.32-41
    • /
    • 2009
  • In the execution of construction management, such pre-design steps as a planning stage, a basic design stage, and a work design stage are regarded as more important than an actual construction stage. However, the manpower input criterion from the aspect of construction management price standard in the Construction Engineering Management Law does not attach weight to the pre-design stage. In this regard, the aim of this study was to examine the propriety of manpower input in the pre-design stage of construction management and then present an improvement strategy of it. For this, the investigator examined the criterion of service price prescribed in the Construction Engineering Management Law and then comparatively analyzed four sites of construction management services. Study findings are as follows: 1) the actual state of manpower input based on the stepwise average price criterion of construction management service is presented with such steps as the newly established planning step (6.6%), the basic design stage (3.9%$\rightarrow$5.6%), the practical design stage(7.6%$\rightarrow$13.5%), the construction stage (88.5%$\rightarrow$64.0%), and the newly established maintenance stage (10.3%). The average price criterion is classified by total construction expenses and calculated by improved rates and stage; and 2) the three-step criterion of the Construction Engineering Management Law is classified into five stages including the planning stage and the maintenance stage by dividing it with the stepwise construction businesses. Study findings show that the calculation of price criterion in the actual site of construction management services must be operated in a practical and flexible manner and the systematic improvement of stepwise manpower input must be carried out actually.