• 제목/요약/키워드: Plan analysis

검색결과 7,966건 처리시간 0.034초

방폭설비 성능유지 실태분석을 통한 관리방안 연구 (A Study on the Management Plan through Performance Maintenance Analysis of Explosion-proof Facilities)

  • 권용준;변정환
    • 한국안전학회지
    • /
    • 제35권2호
    • /
    • pp.8-16
    • /
    • 2020
  • In Article 311 of the Regulation on Occupational Safety and Health Standards requires the use of Korean Industrial Standards Act in accordance with the Industrial Standardization Act. However, the classification, inspection, maintenance, design, selection, and installation of explosion hazard locations for explosion and explosion prevention and internalization of 'safety' in the performance maintenance phase of electrical machinery and equipment There is no technical and institutional management plan for remodeling and alteration. Analysis of actual conditions and problems related to the installation, use, and maintenance of explosion-proof equipment, comparative analysis of domestic and international technical standards and systems, technical, institutional and administrative systems and systems related to installation, use, and maintenance of explosion-proof equipment, technical personnel and qualifications, etc. It is to propose legislation, system improvement, and technical standard establishment related to the maintenance of explosion-proof facility performance through improvement of the necessity and feasibility study for establishment of the legal status of the management site and management plan. As technical measures, KS standard revision (draft), KOSHA guide (draft) and explosion-proof facility performance maintenance manual were presented. In addition, the institutional management plan proposed the revised rule on occupational safety and health standards, the revised rule on the restriction of employment of hazardous work, and the manpower training program related to the maintenance of explosion-proof facilities and the qualification plan. Enhance safety at the installation, use, and maintenance stage of explosion-proof structured electrical machinery. It is expected to be used to classify explosion hazards, select related equipment, and to update and standardize standards related to installation, use and maintenance.

한복생산 분야의 국가직무능력표준 개발에 관한 연구 (The Study on NCS Development for the Production of Hanbok)

  • 서승희;김정숙
    • 복식
    • /
    • 제65권2호
    • /
    • pp.62-74
    • /
    • 2015
  • The purpose of this research is to analyse the process of development and verification of 'National Competency Standards' of Hanbok production, which was carried out in 2013 for the fashion industry. As the result of this research, the definition of the duty in Hanbok production is 'to conduct a series of step-by-step processes of planning and developing fabric and design, then making pattern, cutting fabric and sewing.' The competency unit for Hanbok production is analyzed in 10 categories: analysis of market trends, design plan, production and manipulation of fabric, production process plan, sample making, pattern making, cutting out, sewing, finishing sewing, inspection of the product quality. Competency unit elements of each competency unit are as follows. 1) analysis of market trends: to research market trend resources, to analyse consumers' buying trend, to analyse industry changes, 2) design plan: to develop design, to plan fabrication, to draw flats, 3) production and manipulation of fabric: to develop fabric planning, to prepare fabric manipulation, to conduct fabric manipulation, 4) production process plan: to grasp design, to plan sewing method, to prepare a specification sheet, 5) sample making: to make a sample pattern, to cut sample fabrics, to sew sample, to finish sample making, 6) pattern making: to measure body, to make production pattern, to adjust production pattern, 7) cutting out: to care fabrics, to lay out patterns, to cut out fabrics, 8) sewing: to sew a garment, to sew a lining, to attach a lining, 9) finishing sewing: to neaten edges, to attach trims, to press to finish, 10) inspection of the product quality: to confirm correspondence with the specification sheet, to inspect appearance.

지역사회복지계획 논리구성의 타당성과 질 강화 -경주시 지역사회복지계획 사례중심- (A Study on the Quality and Logic Construction's Validity Improvement of Community Plan - Focused on the Case of Gyeongju-si Community Plan -)

  • 강대선
    • 한국사회복지학
    • /
    • 제64권3호
    • /
    • pp.155-181
    • /
    • 2012
  • 본 연구는 지역사회복지계획의 논리구성의 타당성과 질 강화를 위하여, 논리구성의 기본 틀과 타당성 점검기준을 설정하고, 이를 경주시지역사회복지계획에 실제로 적용하여 분석하였다. 분석 결과, 첫째, 논리구성의 타당성 점검기준은 계획서 전체적인 계층구조측면에서의 수직적 일관성, 부문계획간 연관성, 서술의 명확한 이해가능성으로 설정되었다. 둘째, 전반적으로 경주시지역사회복지계획은 논리구성의 타당성 기준을 충족하지 못하는 것으로 나타났다. 이 같은 연구결과에 기반하여 계획서 질과 계획 환경 측면에서 계획가이드라인의 개선방안을 구체적으로 제시하였다.

  • PDF

시스템 운용 개념서 활용을 통한 예방적 전기안전 계획서 개발에 관한 연구 (On the Development of Preventive Electrical Safety Plan Using Operation Concept Document)

  • 이병길;이재천;신흥식
    • 대한안전경영과학회지
    • /
    • 제10권4호
    • /
    • pp.73-81
    • /
    • 2008
  • The current electrical safety plan developed for the national electricity system has been playing an important role in handling a variety of electrical accidents. However, it can be more effective to prevent or reduce those accidents if a preventive electrical safety plan is available. In this paper, an approach to developing the safety plan is described. We first discuss the contents that should be included in the plan. Noting that an effective plan requires the system level consideration of all the factors affecting the safety issues, an operation concept document (OCD) is considered. The OCD can allow us to understand the behavior of the safety system based on the operation environment, the system functions, the performance requirements, all at the system level of the safety system. Thus, the OCD can be useful in developing the safety plan. A detailed description then follows on how the OCD is developed for the electrical safety system under study. Finally, we discuss how the developed OCD can be used in deriving the preventive electrical safety plan.

근린단위 도시계획의 실행방안에 관한 연구 - 시애틀시와 요코하마시를 대상으로 - (Strategies for Implementation of Neighborhood unit Plan - Focused on the City of Seattle and Yokohama -)

  • 이보람
    • 대한건축학회논문집:계획계
    • /
    • 제35권1호
    • /
    • pp.3-9
    • /
    • 2019
  • The purpose of the city planning is to share the future image of the area where all citizens sympathize and to function as tools to implement a policy. Recently, the city of Seoul has established the community plan to manage the city as neighborhood units, but there are several issues that need to be addressed, such as lack of practical strategies. Therefore, this study studied the neighborhood unit plan in terms of feasibility. The comparative analysis is the masterplan of the City of Seattle in the U.S and the city of Yokohama in Japan, which are known to accomplish advanced urban planning. As a result, three factors were needed; there are 1) a masterplan that acts as an action plan, 2) administrative support tools such as financial and human resources that encourage people to participate in urban planning with enthusiasm, and 3) a management system that continuously manages the plan itself. This result is expected to be a reference for the establishment of method for the implementation of neighborhood unit plan in Seoul.

PC부재의 생산계획 수립에 영향을 미치는 요인 고찰에 관한 연구 (A Study on the Consideration for Factors Affecting Production Plan Establishment of Precast Concrete Members)

  • 전영훈;신은영;윤원건;김경훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.253-254
    • /
    • 2023
  • The production plan of Precast Concrete members is closely related to the assembly plan of Precast Concrete members, and is an important management factor for the process planning of Precast Concrete construction. This may cause a delay in the construction period due to manufacturing errors occurring in the production process of members and transportation errors according to the production sequence. Therefore, it is necessary to have an efficient production plan for Precast Concrete members that can produce the necessary quantity from the point of assembly of the members and supply them in a timely manner. This study is a basic study for establishing a production plan for Precast Concrete members, and the purpose of the study is to examine the factors that affect the establishment of a production plan for Precast Concrete members. In this study, the influencing factors according to the production method and conditions when establishing a production plan for Precast Concrete members were considered. In the future, correlation analysis among influencing factors will be carried out, and it is expected that it will be used as basic data for schedule management of Precast Concrete construction and derivation of construction period calculation standards.

  • PDF

조선 도장 공장 운영 방안 수립에 관한 연구

  • 최동희;박주철
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2001년도 추계학술대회 논문집
    • /
    • pp.286-289
    • /
    • 2001
  • This paper deals with the procedures of effective mid-term Operation Planning establishment for painting shop in shipbuilding. and develop prototype system. In general, the block painting process consists of two stages such as blasting operation for surface preparation and painting operation for paint application for blocks. Weather condition is a potent Influence on those operations. The procedures consists of four steps, Load analysis, Generate alternative simulation plan. Implementation of Allocation automation module and Compare result of each simulation plan. Explain of each step. as follows, 1.step, Load analysis measure amount of assigned workload and manhour. 2.step, simulation scheme include alterable control variable such as overtime, weather. Auto allocating module carry out feasibility of simulation plan. 3.step, Allocation automation module are composed of three algorithms, as followings: - the block allocation algorithm that determines the number of blocks to be processed each day, - the team allocation algorithm that allocates blocks to worker groups. - the block arrangement algorithm that arrange blocks in blasting and painting cells. Since the block arrangement algorithm is conducted simultaneously with the team allocation algorithm, the total structure of the operating algorithms is considered to have two phases: first, daily load balancing with capacity limit and second, team allocation considering arrangement each day 4 step, Comparing result of each simulation plan. and select best simulation plan.

  • PDF

원전 및 신재생에너지 정책에 따른 전력공급비용 분석 (Analysis of Power Supply Cost According to Nuclear and Renewable Energy Policies)

  • 우필성;김강원;황순현;김발호
    • 전기학회논문지
    • /
    • 제67권1호
    • /
    • pp.16-21
    • /
    • 2018
  • As a result of the Fukushima disaster and climate change due to excessive greenhouse gases, international energy affairs are currently focused on establishing safe and environment-friendly policies. To achieve this, Republic of Korea has established a plan for environment-friendly energy supplies. It is expected that policy enforcement will be accompanied by an increase in energy supply costs. An analysis of energy supply costs is necessary before the establishment of any national energy policy. This paper analyzes and compares the energy supply costs accompanying environmental and nuclear energy policies, based on the Korean National Energy Master Plan and the Basic Plan for Long-Term Electricity Supply and Demand, in order to understand the implications of these national energy policies.

산업용 수용가에서 에너지절감을 위한 ESS 운영 방안에 관한 연구 (Study on ESS Operation Plan for Energy Reduction in Industrial Customer)

  • 유순정;이안기;백정선;차대중;김재철
    • 전기학회논문지
    • /
    • 제67권9호
    • /
    • pp.1152-1158
    • /
    • 2018
  • In this paper, Optimal operation plan through load analysis of industrial end-user is suggested. It calculated economic feasibility of ESS with detailed power lad analysis and conditions. Generally, if the latest maximum power is less than 30% of contracted power, it can not be peak shaving operation plan. and if the peak load level stays stead for 24 hours, it is difficult peak shaving for ESS. In addition to, When the peak load is occurred in summer or winter, a hybrid operation method combining the peak shaving plan and the time shift method is proposed. Therefore, When ESS is installed in industrial electrical customer, it is achieved best effect through the optimal operation plan.

농촌마을종합개발사업 내용분석과 시사점 -'04-'07년 사업대상지 사업을 중심으로 - (Contents Analysis on the Rural Village Development Projects: With Focus on Project Regions during 2004-2007)

  • 박한식;황길식;김영택
    • 농촌계획
    • /
    • 제14권4호
    • /
    • pp.121-128
    • /
    • 2008
  • The purpose of this study is to identify the trend of the contents of the plan that was implemented through contents analysis on the master plan project of rural village development projects that began in 2004. Contents analysis is based on the classification of business in the detailed enforcement regulations of rural village development project. Analysis on the project contents was conducted for 30 days from June 20 to July 20 for the 132 regions established in the master plan during the period from 2004 to 2007. The results of the analysis showed the following. First, scenery facilities, rural tourism, cultural welfare and income basis projects accounted for 76.5% of the total projects. Second, with regard to investment costs depending on the contents of the projects, cultural welfare, rural tourism and income basis projects accounted for 66.3% of the total investment costs. Third, it was found out that, with regard to the trend of change in the project contents by year, income basis projects were sharply reduced whereas cultural welfare and scenery facilities projects were increased. Finally, with regard to the analysis on the projects by region, it was found that Gangwon, Gyeonggi and Chungnam gave high weight on rural tourism, whereas Gyeongbuk, Jeonnam and Jeonbuk gave low weight on rural tourism. Particularly, Gyeongnam was found to have given low weight on income basis project.