• Title/Summary/Keyword: Performance specification

Search Result 1,132, Processing Time 0.03 seconds

Economic Design of a Two-Sided Two-Stage Screening Procedure with a Prescribed Outgoing Quality

  • Kwon, Hyuck-Moo;Bai, Do-Sun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.22 no.1
    • /
    • pp.17-36
    • /
    • 1996
  • An economic two-stage screening procedure is presented when both lower and upper specification limits are given on the performance variable. A screening variable which is highly correlated with the performance variable is used first to decide whether an item should be accepted, rejected, or undecided. The performance variable is then used to classify the undecided items. The two variables are assumed to be jointly normally distributed. A cost model is constructed on the basis of six cost components; inspection costs of screening and performance variables and costs caused by type I and type II misclassification errors related with lower and upper specification limits. Optimal cutoff values on the screening variable are determined so that the average outgoing quality exceeds a prespecified level. Solution methods are provided for both known-parameter and unknown-parameter cases.

  • PDF

Flexible Process Performance Measures by Quadratic Loss Function (이차손실함수를 이용한 유동적인 공정수행척도)

  • 정영배
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.36
    • /
    • pp.275-285
    • /
    • 1995
  • In recent years there has been increasing interest in the issue of process centering in manufacturing process, The traditional process capability indices Cp, Cpk and Cpu are used to provide measure of process performance, but these indices do not represent the issue of process centering. A new measure of the process capability index Cpm is proposed that takes into account the proximity to the target value as well as the process variation when assessing process performance. However, Cpm only considers acceptance cost for deviation from target value within specification limits, do not includes economic consideration for rejected items. This paper proposes flexible process performance measures that considered quadratic loss function caused by quality deviation within specification limits, rejection cost associated with the disposition of rejected items, and inspection cost. In this model disposition of rejected items are considered under perfect corrective procedures and the absence of perfect corrective procedures.

  • PDF

A Study on the Design of the Robust Feedback Active Noise Controller (강인한 궤환 능동 소음 제어기의 설계에 관한 연구)

  • Ahn, Woo-Hyun;Chung, Tae-Jin;Yu, Chi-Hyung;Chung, Chan-Soo
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.1018-1020
    • /
    • 1996
  • In this paper, when a robust active noise controller for a small cavity to control the noise induced in the cavity is designed, the Graphical method based on the robust stability and performance requirements is studied. The problem of designing controller that achieve these robust performance conditions is related to minimizing the $H_{\infty}$ norm of the mixed sensitivity function by using $H_{\infty}$ control theory. Also, For design the controller, the loopshaping method which control the weight functions to satisfy the design specification without loss of a robust performance can be used. Therefore, we determined the acceptable design specification with the system characteristics of the small cavity and obtained its robust controller with the robust performance specifications by stability margin.

  • PDF

The Legal nature of a contract for supply of a special purpose aircraft -The legitimacy of contract cancellation on the grounds that the performance specification is not satisfied in the purchase specification- (특수 항공기 공급계약의 법적 성질 - 구매규격서상 성능요건 미달을 이유로 한 계약해제의 정당성 -)

  • Kwon, Chang-Young
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.31 no.2
    • /
    • pp.37-72
    • /
    • 2016
  • In the aerospace field, besides special purpose airplanes, contracts for supply of various types of products such as prototypes, unmanned aerial vehicles and space launch vehicles are increasing. In the case of the contractor, it was planned to spend a large amount of money to supply the production, but if the purchase specification that presents the quality and performance standard of the product is poor or lacks the capacity to judge the performance, consuming enormous amounts of time and money. Even if the undertaker does not have the ability to supply the products with the required performance and quality to achieve the purpose of the contract, he/she must pay the cost of burial due to the incompleteness of the work and the compensation for the cancellation of the contract. In this case, the defendant ordered the plaintiff to supply the aircraft by the Happy Box method, which is capable of ILS Offset flight as specified in the Purchase Specification, but the plaintiff attempted to supply the aircraft by the RNAV method. Although the ILS ground signal can be inspected by the RNAV method, the aircraft manufactured in the manner claimed by the plaintiff does not have the ILS Offset flight function required by the purchase specification, so the defendant can not achieve the purpose required by the purchase specification. It was a question of whether a defendant's cancellation of contract was legitimate. The aircraft, which is the object of this contract, is a subordinate substitute, so the case contract is of undertaking. Therefore, in order to complete the work in this contract, the major structural parts of the aircraft must be manufactured as agreed and have the performance generally required in the social sense. However, the aircraft delivered by the plaintiff has serious defects because the defendant can not achieve the purpose required by the purchase specification due to the lack of the ILS Offset flight function required by the purchase specification. This deficiency is impossible for the plaintiff to repair, so the defendant 's cancellation of the contract is legitimate.

Design of the Procurement Engineering Support System : A Case Study (구매엔지니어링 관리지원시스템 상세 설계 사례 연구)

  • Kim, Jinil;Yeom, Choongsub;Shin, Joonguk;Salim, Shelly
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.14 no.2
    • /
    • pp.33-40
    • /
    • 2018
  • This paper is based on the interim result of ongoing research and development project to develop a software system which support procurement activities, namely PeMSS (Procurement Engineering Management Support System). PeMSS is a system that enables development requirements for each equipment and help designing equipment meeting the purchase requirements. Procurement at EPC (Engineering Procurement and Construction) and operational stage of a plant is an important area that determines the integrity and profitability of the plant. Procurement of unsuitable equipment due to selection of suppliers that do not meet or omit critical requirements in purchase specification can result in enormous cost increase due to such as delay in EPC project, unsatisfactory performance and reduced plant operation time. In spite of the importance of the procurement engineering, there is a lack of support system for systematic preparation of purchase specification, so development of the procurement specification is basically relying on the experience of the engineers in charge. Accordingly, it is needed to develop the PeMSS to help procurement engineers develop procurement specification based on systems engineering approach. This paper introduces the design of the PeMSS.

Robust control system design for a flexible arm by a two-degree-of-freedom compensator

  • Shimomoto, Y.;Kobayashi, T.;Miyaura, S.;Ishimatsu, T.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1993.10b
    • /
    • pp.105-108
    • /
    • 1993
  • This paper is concerned with a two-degree-offreedom control system design for a flexible arm, a two-degree-of-frecdom control system can achieve a robust stability specification and a control performance specification independently. By this property we improve the control performance with maintaining the same robust stability level as that of the onc-dcgree-of-freedom control system. At First we design a two-degree-of-fteedom control system which includes a feedforward controller and a feedback controller. The feedforward controller can be given by specifying a transfer function of a dcsired closed-loop model. We obtain a feedback controller by solving a mixed sensitivity problem. Several numerical results show that two-degree-of-freedom control systems acheive a better control performance than that of one-degree-of-freedom control systems.

  • PDF

The Effects of Base Oil Quality on the Performance of GF-3 Engine Oil

  • Moon, Woo-Sik;Ryoo, Jae-Kon
    • KSTLE International Journal
    • /
    • v.3 no.1
    • /
    • pp.26-29
    • /
    • 2002
  • The International Lubricant Standardization and Approval Committee (ILSAC) GF-3 passenger car engine oil specification has been introduced commercially in July 2001. The new specification oil provides superior performance in terms of fuel economy, control of high temperature deposits, and oil consumption. These enhanced performances of GF-3 engine oil need high quality base oil as well as a better additive system. In this paper, the effect of base oil on various performances of ILSAC GF-3 engine oil was investigated. From the GF-3 sequence engine tests, Group III base oil shows better performance in fuel economy retention, oxidation and varnish control than combination of group III and group II or group III and group 1.

Performance Evaluation of an Automotive Fuel Filter by Multi-Pass Filtration Test (다순환 여과시험에 의한 자동차용 연료필터의 성능 평가)

  • 이재천;장지현
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.10 no.6
    • /
    • pp.219-226
    • /
    • 2002
  • Filtration performance of an automotive fuel filter was evaluated based on the theory of Beta ratio. This study also introduced the fuel components' contamination performance test stand incorporating the multi-pass filtration test circuit. The theoretical basis of multi-pass test and test procedure were described in detail. The specification of commercial fuel filter currently available was just the maximum pressure drop across the filter assembly and the holding capacity of contaminants. However, test results revealed that the fuel filter tested could not maintain consistent Beta ratio, that is filtration efficiency, although it had the holding capacity close to the specification. Hence the Beta ratio should be specified in service life. The results also showed that filtration system model should be refined including desorption ratio to estimate the variable Beta ratio in the test.

Output LC Filter Design for UPS Inverter Considering the Response of System (시스템 응답을 고려한 UPS 인버터의 출력 LC필터 설계)

  • Kim, Jae-Sig;Lee, Sang-Hoon;Choi, Jae-Ho
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.50 no.7
    • /
    • pp.347-355
    • /
    • 2001
  • The conventional output filter design methods of a voltage source inverter includes two main problems: the performance is not sure to satisfy the specification under the nonlinear load; the designed filter must be occasionally modified when the controller is designed. In this paper, we analyze the relation between both linear and nonlinear loads, the output voltage magnitude, LC lowpass filter parameters, and the control response time. Upon the basis, both filter and controller are simultaneously designed for the performance to satisfy the specification under the nonlinear load as well as linear load. The proposed method sharply enhances the reliability of the performance. P.U is used for the method to be applied to all the quantities of the system. The simulation and the experiment of the proposed method carried out respectively to verify the validity.

  • PDF

Calculation of Fire-resisting Time and Extraction of Simple Transplants in the Event of a Building Fire (건축물 화재시 필요내화 시간 산정 및 간이식 도출)

  • Kim, Yun-Seong;Han, Ji-Woo;kim, Hye-Won;Jin, Seung-Hyeon;Lee, Byeong-Heun;Kwon, Yeong-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.59-60
    • /
    • 2020
  • Large fires continue to spread throughout the building, including the fire in Uijeongbu in 2015, the fire in Jecheon in 2017, and the fire in Miryang in 2018. According to the above fire case investigation, major problems were the fire resistance performance of compartment members such as fire doors, the fire spread due to damage to exterior wall openings, and smoke spread through vertical openings. However, in South Korea, only specification design is implemented for buildings that are not subject to performance design. In addition, the analysis of the fire resistance performance standards of building members in the specification design showed that fire doors were not specified in detail for 60 minutes of insulation performance and 60 minutes of fire resistance performance of E/V doors, limiting the prevention of fire spread. Therefore, the purpose of this research is to prepare measures to prevent the spread of fire by presenting simple transplants for calculating the required fire time according to the architectural design conditions for the performance design of the components of the fire room according to the purpose of use of the front of the building.

  • PDF