• Title/Summary/Keyword: Parallel connection

Search Result 358, Processing Time 0.02 seconds

Characteristics of 15 kVA superconducting fault current limiter (15 kVA급 저항형 초전도 한류기의 전류제한특성)

  • Choi, Hyo-Sang;Kim, Hye-Rim;Hwang, Si-Dole;Kim, Sang-Joon;Lim, Hae-Ryong;Kim, In-Seon;Hyun, Ok-Bae
    • 한국초전도학회:학술대회논문집
    • /
    • v.10
    • /
    • pp.272-275
    • /
    • 2000
  • We investigated a resistive superconducting fault current limiter (SFCL) fabricated using YBCO thin films on 2-inch diameter sapphire substrates. Nearly identical SFCL units were prepared and tested. The units were connected in series and parallel to increase the current and voltage ratings. A serial connection of the units showed significantly unbalanced power dissipation between the units. This imbalance was removed by introducing a shunt resistor to the firstly quenched unit. Parallel connection of the units increased the current rating. An SFCL module of 4 units in parallel, each of which has minimum quench current 25 Ap, was produced and successfully tested at a 220 V circuit. From the resistance increase, we estimated that the film temperature increases to 200 K in 5 msec, and 300 K in 120 msec. Successive quenches revealed that this system is stable without degradation in the current limiting capability under such thermal shocks as quenches at 220 V.

  • PDF

Vibration Analysis of Planar Cable-Driven Parallel Robot Configurations (평면형 케이블 구동 병렬로봇의 구조에 따른 진동분석)

  • Piao, Jinlong;Jung, Jinwoo;Jin, Xuejun;Park, Sukho;Park, Jong-Oh;Ko, Seong Young
    • The Journal of Korea Robotics Society
    • /
    • v.11 no.2
    • /
    • pp.73-82
    • /
    • 2016
  • This paper focuses on the vibration analysis of planar cable-driven parallel robots on their configurations. Despite of many advantages of the cable robots, elasticity of the cables may cause the vibration at the existence of external disturbance, resulting in deterioration of positioning accuracy. According to the vibration theory, having high first order natural frequency can prevent resonance with low frequency disturbance from the surrounding environment. A series of simulations showed that choosing frame / end-effector shape and cable connection method affects robots' natural frequency. For the precise simulation, the cables are modeled as linear springs and axial vibration of cables is mainly considered. Aspect ratios of the frame and end-effector are defined as non-dimensional parameters while their areas are fixed. It was shown that vibration analysis guides to design a planar cable robot in terms of high capacity to reduce vibration.

Design of Modular DC / DC Converter with Phase-Shifting Topology (위상천이 방식의 모듈형 DC/DC 컨버터 설계)

  • Chai, Yong-Yoong
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.14 no.1
    • /
    • pp.81-86
    • /
    • 2019
  • This paper is concerned with a system design that enables a the plurality of switching mode power supplies to be supplied with larger power through a parallel connection. For this purpose, a shunt resistor is placed in series at the output of the constant voltage regulator and the output voltage is sensed and controlled using an arduino. In this paper, two constant-voltage regulators were used for the experiment, but it is possible to generalize for more boards. By using the method that controls the system, the sum of the currents delivered by the two systems to the load was found to be 96% of the current drawn from each board. In case of efficiency, 92.4% efficiency is achieved in the unit board and the efficiency in parallel connection is about 90%.

Performance Analysis of Interworking Model for a Broadband Access Network with VB5.2 Interface (광대역 액세스 망의 VB5.2 인터페이스를 위한 연동 모델의 성능분석)

  • Kim, Choon-Hee;Cha, Young-Wook;Han, Ki-Jun
    • Journal of KIISE:Information Networking
    • /
    • v.27 no.2
    • /
    • pp.237-246
    • /
    • 2000
  • A broadband access network in B-ISDN subscriber network, plays a role of concentration or multiplexing of various subscribers into a service node. For call and connection control functions, DSS2 and B-ISUP signalling protocols are standardized for each of a subscriber side and a network node. B-BCC and B-ANCC protocol were proposed for VB5.2 interface. This interface allows dynamic control of ATM connections at the broadband access network. To establish an end-to-end ATM connection, interworking functions between VB5.2 interface's connection control protocol and the signalling protocol, are performed at the service node. A sequential interworking model and a parallel interworking model were proposed for these interworking functions. The sequential interworking model recommended by ITU-T causes an overall connection setup delay by introducing the access network, because this model proceeds the signalling protocol of network node after the response of VB5.2 interface protocol. On the other hand, the parallel interworking model proceeds the signalling protocol and the VB5.2 interface protocol simultaneously. The simultaneity of the parallel interworking model minimizes the overall connection setup delay. In this paper, we analyze and simulate above two interworking models with B-BCC or B-ANCC protocol in terms of a connection setup delay and completion ratio.

  • PDF

SEXTIC MOMENT PROBLEMS ON 3 PARALLEL LINES

  • Yoo, Seonguk
    • Bulletin of the Korean Mathematical Society
    • /
    • v.54 no.1
    • /
    • pp.299-318
    • /
    • 2017
  • Sextic moment problems with an infinite algebraic variety are still widely open. We study the problem with a single cubic column relation associated to 3 parallel lines in which the variety is infinite. It turns out that this specific column relation has a strong connection with moment problems that have a symmetric algebraic variety. We present more concrete solutions to some sextic moment problems with a symmetric variety.

Input Series-Output Parallel Connected Converter System for High Voltage Power Conversion Applications (고 입력전압 전력변환 응용에 적합한 입력직렬-출력병렬 컨버터 시스템)

  • 김정원;조보형
    • Proceedings of the KIPE Conference
    • /
    • 1998.07a
    • /
    • pp.455-459
    • /
    • 1998
  • In this paper input Series-Output Parallel connected converter configuration for high voltage power conversion applications is proposed and a control method to solve the problems of Input Series-Output Paralles connected converter configuration is introduced. In this configuration snubber circuit or voltage balancing controller that is necessary for the series connection of switching devices is not needed. The effectiveness of this proposed configuration is verified by simulation.

  • PDF

An Empirical Study on Jitter between Two Servers Port Connections

  • Lee, Sang-Bock;Kim, Hyun-Soo
    • Journal of the Korean Data and Information Science Society
    • /
    • v.17 no.1
    • /
    • pp.87-94
    • /
    • 2006
  • The purpose of this paper is to measure jitter between two server systems. Given 3 empirical models as user and port parallel server types under some conditions of 100 Mbps and optimal CPU temperature suggested by Lee and Kim(2005), our results are shown; jitter was usually measured above 3000 ms in most empirical cases, jumping points were observed around 250 processing traffics, and port parallel model was optimal in our cases.

  • PDF

A study on DTCNN hardware implementation for image processing (영상처리를 위한 DTCNN 하드웨어 구현에 관한 연구)

  • 문성용
    • Journal of the Korean Institute of Telematics and Electronics S
    • /
    • v.35S no.4
    • /
    • pp.96-104
    • /
    • 1998
  • In this paper, the circuit of DTCNN designed using dilation and erosion operation, a basic operation of gray-scale morphology, also each cell designed PE in order to having extension using the local connectivity. In this PE design, connection of between cell and cell become simple. And it is realized to easily VLSI realization as well as to circuit to be parallel processing. As the resutls of simulations, the proposed method was verified to improved more operation speed than the sequential data processing, parallel processing DTCNN was implemented in a 0.8.mu.m CMOS technology using COMPASS Tool.

  • PDF

Comparison of V-I/I-V droop control method in parallel buck converters (벅 컨버터의 병렬운전을 위한 전류/전압 기반 드룹제어기의 비교)

  • Cho, Wontae;Cho, Younghoon
    • Proceedings of the KIPE Conference
    • /
    • 2018.11a
    • /
    • pp.217-218
    • /
    • 2018
  • Droop control method is the conventional controller to solve the problem of current sharing error and voltage deviation that can occur in parallel connection of DC-DC converter. This paper compared V-I droop control with I-V droop control, which based on communication and confirmed the results through experiments.

  • PDF

Analysis of Parallel Characteristics for Virtual Implement of 50[W]Solar Cell modules (태양전지 가상구현 시스템[50W]의 병렬연결 출력특성에 대한 분석)

  • Lee, B.I.;Jung, B.H.;Jeon, Y.S.;Choe, G.H.
    • Proceedings of the KIEE Conference
    • /
    • 2003.04a
    • /
    • pp.362-364
    • /
    • 2003
  • Generally, photovoltaic system is composed a number of solar cells array. so, virtual implementation module for solar cell array is needed Parallel connection each module for extract the power. A desirable characteristic of a parallel supply system is that individual converters share the load current equally and stably. The current sharing(CS) can be implemented using two approaches. The first one, known as a droop method, relies on the high output impedance of each converter. and The second approach, known as active current-sharing techniques. In this paper, analyze for better control logic of parallel connecting virtual implements of solar cell at using droop method.

  • PDF