• Title/Summary/Keyword: PERFORMANCE MEASUREMENT

Search Result 6,933, Processing Time 0.033 seconds

Performance Evaluation for Coordinate Measuring Machine using Design of Experiments (실험계획법을 이용한 3차원 좌표 측정기의 성능 평가)

  • Lee, Seung-Pyo;Ha, Sung-Kyu
    • Transactions of the Korean Society of Machine Tool Engineers
    • /
    • v.17 no.4
    • /
    • pp.133-139
    • /
    • 2008
  • With the increasing demand for higher production quality and growing competition in the global market, coordinate measuring machine(CMM) has been widely used in industry to improve the efficiency and effectiveness of measurement. In this paper the performance evaluation of coordinate measuring machine is proposed using design of experiments. A factorial design is applied to carry out the performance test proposed by ISO 10360 with a length bar and to investigate CMM measurement errors associated to orientation and length in the work volume. The determination of the significance of effects in an experiment is made through the analysis of variance(ANOVA). The results show that the proposed method is suitable to analyze the factors which affect the CMM measurement performance.

A Study on the TPM for Performance Management of Weapon System R&D Program (무기체계 연구개발 사업의 성능관리를 위한 기술성과측정에 관한 연구)

  • Hur, Jang-Wook;Noh, Hyun-Il
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.13 no.4
    • /
    • pp.612-618
    • /
    • 2010
  • In order to successfully manage of the state-of-the-art weapon system R&D program which are under the limited budget and schedule but also has a high level of technical risks, it is gaining weights to use such a scientific program management tool as TPM. Therefore, the purpose of this research is to review the concept of the TPM and its relation among MOE, MOP and TPM, and introduce an application method of TPM mainly focusing on helicopter development program. It has the organized structure, detailed procedure and 282 parameters for performance management through the TPM.

Uncertainty Analysis for Speed and Power Performance in Sea Trial using Monte Carlo Simulation (몬테카를로 시뮬레이션을 이용한 시운전 선속-동력 성능에 대한 불확실성 해석)

  • Seo, Dae-Won;Kim, Min-Su;Kim, Sang-Yeob
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.56 no.3
    • /
    • pp.242-250
    • /
    • 2019
  • The speed and power performance of a ship is not only a guarantee issue between the ship owner and the ship-yard, but also is related with the Energy Efficiency Design Index (EEDI) regulation. Recently, International Organization for Standardization (ISO) published the procedure of the measurement and assessment for ship speed and power at sea trial. The results of speed and power performance measured in actual sea condition must inevitably include various uncertainty factors. In this study, the influence for systematic error of shaft power measurement system was examined using the Monte Carlo simulation. It is found that the expanded uncertainty of speed and power performance is approximately ${\pm}1.2%$ at the 95% confidence level(k=2) and most of the uncertainty factor is attributed to shaft torque measurement system.

Development of Business and Performance Record Standard Template for Rail Infrastructure BIM Performance Management (철도인프라 BIM 성과관리를 위한 업무 및 성과기록 표준 템플릿 개발)

  • Shin, Min-Ho;Kim, Hwan-Yong;Choi, Young-Woo;Han, Sang-Cheon
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.50-59
    • /
    • 2020
  • Recently, the government has actively promoted the introduction of BIM at the national level to improve the efficiency and productivity of the construction industry, and private interest in the application of BIM has also increased. However, despite the large amount of references and information, not much research has been done in quantitative ways to accurately measure the performance of BIM projects. The purpose of this study is to review performance measurement cases using ROI, investment effect analysis, and queue model analysis using domestic and overseas BIM guideline research and to present standard templates that can quantitatively measure BIM performance records according to domestic conditions based on this. Performance measurement trends and cases according to the application of BIM were analyzed, and nine quantification elements were derived from this, and based on this, a performance measurement data collection template at the BIM life cycle stage was prepared. Detailed items and contents were prepared for the nine quantification elements, and the final template consisted of a total of 43 questions, divided into the entire stage (15), the beginning (8), the middle (8), and the latter (12) areas. It is expected that by using the standard template of railway BIM performance records developed in this study, the BIM design stage will be diagnosed and the deficiencies will be supplemented, which will be the basic data for measuring actual quantitative performance in all life cycle performance of future BIM projects.

A Standard Method for Progress Measurement in a Petrochemical Plant EPC Project (석유화학 플랜트 EPC 사업의 진도율 산정표준의 제안)

  • Cho, Hong-Yeon;Yoo, Hoseon
    • Plant Journal
    • /
    • v.7 no.4
    • /
    • pp.77-87
    • /
    • 2011
  • In proportion to continuing growth of overseas plant market and the trend of its mega scale of the project, the importance of management is significantly emphasized for the successful execution of the project. And it is recognized that progress control is the most important management item amongst the others in the management. Progress control is importance of progress measurement for performance measurement and process control of project, but it is hardly obtainable securing the objectivity in the progress measurement since the progress measurement are being applied differently in accordance with the project conditions and the experience level of the person in charge for the progress control. This study has conducted as following to propose a standard method for progress measurement in a petrochemical plant protect. Domestic and overseas plant projects are investigated variously with the applied method of progress measurement, and the deduced problem of progress measurement. And then standard method for progress measurement of engineering, procurement, construction and commissioning has been proposed according to comparison and analysis of practices in domestic & overseas plant project, procedures for progress control in the globally reputed petrochemical client, company rules and recommendation of the expert in progress control.

  • PDF

An Exploratory Study on the Balanced Scorecard Model of Social Enterprise

  • Lee, Yoeng-Taak;Moon, Jae-Young
    • International Journal of Quality Innovation
    • /
    • v.9 no.2
    • /
    • pp.11-30
    • /
    • 2008
  • The purpose of this study is to develop BSC model of social enterprise. Performance analysis tool of BSC have been brought over from the business world, designed and created from the perspectives of profit-based businesses. The BSC is a strategic performance measurement and management tool designed for the private sector acting as a communication/information and learning system, to measure 'where we are now' and 'where to aim for next'. It prescribes a plan for translating 'vision' and 'strategy' into concrete action across four perspectives at different stages, depending on the business. These perspectives are 'financial', 'customer', 'internal processes' and 'learning and growth', each of which is connected by cause-and-effect relationships that reflect the firm's strategy. Social aims of social enterprise are to accomplish desired outcomes which are to employ vulnerable people and to provide social services. The measurement factors of financial perspective are stable funding, efficiency of budgeting, stakeholders' financial supports, and trade profit. The measurement factors of customer perspective are government, social service users, employees, local communities, sup plier, social activity company, and partnership with external organizations. The measurement factors of internal process perspective are organizational culture, organizational structure/management, internal/external communication, quality of products and services, information sharing. The measurement factors of learning and growth perspective are training and development, management participation, knowledge sharing, leadership of CEO and manager, and learning culture.

Measurement and Arrival Direction Estimation of Supersonic Flight Sonic Boom (초음속 비행체의 소닉붐 측정과 도래각 추정)

  • Ha, Jae-hyoun;Jung, Suk Young;Lee, Younghwan;Jin, Hyeon
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.49 no.3
    • /
    • pp.175-183
    • /
    • 2021
  • This paper studies measurement of sonic boom created by supersonic flight and its arrival angle estimation techniques. Since sonic boom propagates as an impulsive noise and includes infrasound frequency, we propose measurement instrumentation acquiring sonic boom signature without distortion. And we suggest the methodology for an arrival angle estimation with its performance analysis in accordance with sensor array configurations. The performance of our estimator is verified by comparing theoretical performance bound with statistics of its Monte-Carlo simulation results. Furthermore, we presents the analysis of the sonic boom measurement from real flight tests. This work provides an intuitive concept for sensor array configurations and measurement instrumentation.

A Case Study on BIM Operating and Performance Measurement in Construction Phase (시공현장 BIM 운영 및 성과측정을 위한 사례분석)

  • Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.5 no.2
    • /
    • pp.1-11
    • /
    • 2015
  • Despite a lot of research on BIM, there is no quantitative study to measure accurately the performance of BIM coordination service. Thus, this study suggested method to measure the performace of BIM coordination services, applying queueing models in the field of management science. To analyze queuing system of BIM coordination services, a group of BIM coordinator were selected. Through focus group interviews with experts were used in the analysis to derive mean arrival rate(${\lambda}$), mean service rate(${\mu}$) of BIM coordination services. Single-server queuing model(M/M/1), multiple server queuing model(M/M/s) is utilized for the BIM coordination services performance measurement in construction phase. This study has significant quantitative performance measurement approaches that can be utilized in the decision-making for the improvement of the BIM coordination services and to support the review of the alternatives accordingly. But There is a limit but it is difficult to take into account the increase or decrease of the cost of alternatives according to the review.

Suppliers Measurement of Channel Member Performance in Korea (우리 나라 공급업체의 유통경로구성원 성과 특정)

  • 김종훈;한장희
    • Journal of Distribution Research
    • /
    • v.4 no.2
    • /
    • pp.21-39
    • /
    • 1999
  • This study investigates the general applicability of the measurement scale for assessing channel-member performance for the supplier's view that was proposed by Kumar, and Achrol (1992). First, we attempted to examine whether the measurement-scale could be used without any change; the results from the initial data-analysis proposed that the scale needed a certain amount of a revision for further utilization. It seemed that the scale needed some adjustment for being applied to this study; their scale was developed with the data collected from the network of independent dealers handling multiple product items or multiple brands in the U.S. and Canada, while the data of this study were provided by a Korean car manufacturer having a dealer network selling and servicing only its own brand without ownership. Accordingly, we determined that it was necessary to develop a newly finalized performance-measurement scale revising Kumar et al.'s. During the data-analysis of the data resulted in a scale of fifteen items measuring three facets-financial performance, behavioral performance, and competence, each of which consisted of five items respectively. This empirically developed scale looked more valid for the situation of this study than the Kumar, Stern, and Achrol's which was composed of twenty-one items measuring seven facets--three items each.

  • PDF

A Determinant Factors on Supply Chain Performance of Shipping and Logistics Firm in International Logistics (국제물류에서 해운물류기업의 공급사슬성과 결정요인)

  • Yun, Kwang-Woon;Bae, Hee-Sung
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.30
    • /
    • pp.3-26
    • /
    • 2006
  • Supply chain is viewed as a number of organizations(at least three) working cooperatively with at least some shared objectives. The concept of supply chain management represents the most advanced state in the evolutionary development of purchasing, procurement and other supply chain activities. This study aims to analyze and develop a measurement instrument for supply chain performance in international logistics. A measurement instrument for supply chain performance in international logistics are developed by Lai et al(2002). Supply chain reliability, customer service and cost are constructed reflecting service effectiveness and operations efficiency between shipper, forwarder and liner. The results of this study are as follow. We firstly tested the measurement properties of the sub-dimension of the supply chain performance construct using reliability test and confirmatory factor analysis follow by exploratory factor analysis. For each of the factor, reliability and validity are achieved because of the significant loading of the measurement items on their latent factors. Further research perform the analysis of variance by multi respondents within each firm and across partner firms in the supply chain. The result of analysis present the difference with shipper, forwarder and liner in statistics.

  • PDF