References
- Ministry of Land, Transport and Maritime (2010), "BIM Implementation Guideline in Architectural Part".
- Public Procurement Service (2013), "Facility BIM Implementation Basic Guideline v1.2".
- Kwon, O-C, Cho, C-W (2011), "Proposal of BIM Quality Management Standard by Analyzing Domestic and International BIM Guides", Journal of the Korea Institute of Building Construction, Vol. 11, No. 3, pp. 265-275. https://doi.org/10.5345/JKIC.2011.06.3.265
- Shin, T-H (2011), "Proposal for a contractor BIM Implementation Strategy", Journal of the Korea Institute of Building Construction, Vol. 11, No. 2, pp. 26-32.
- Jung, J-K, Kim, Y-S (2012), "Analysis of Core Ability of BIM Manager - From the Standpoint of General Contractor", Journal of Architectural Institute of Korea, Vol. 28. No. 1, pp. 175-182.
- Lu, N. and Korman, T. (2010) Implementation of Building Information Modeling (BIM) in Modular Construction: Benefits and Challenges. Construction Research Congress 2010, pp. 1136-1145.
- Lee, C-J, Lee, G, Won, J-S, Yoon, S-C (2011) "Derivation of High-Priority Items for BIM Adoption in CM Service-CM Service for High Rise Building", Journal of Architectural Institute of Korea, Vol. 27. No. 6, pp. 115-122.
- Kang, T-W, Won, J-S, Lee, G (2013), "A Study on the Development Direction of a BIM Performance Assessment Tool", Journal of Korea Spatial Information Society, Vol. 21. No. 1, pp. 53-62.
- Song, M-R, Yoon, S-W, Chin, S-Y (2011), "BSC Based Measurement of Satisfaction Degree For Based BIM Construction Projects", Journal of Korea Institute of Construction Engineering and Management, Vol. 12. No. 4, pp. 117-129.
- Lee, J-H, Yi J-S (2011), "A Study on BIM Capability Evaluation for Design Organization", Journal of Architectural Institute of Korea, Vol. 27. No. 6. pp. 257-266.
- Seo, H-C, Oh, J-K, Kim, J-J (2012), "The Development of an Evaluation Model for the Work Environment of the BIM-based Architectural Design Firms", Journal of Architectural Institute of Korea, Vol. 28. No. 5. pp. 95-105.
- Lee, J-H (2009), "Development of BIM capability evaluation model for design organization", Iwha University.
- Neelamkavil, J., S. Ahamed (2012), "The Return on Investment from BIM-driven Projects in Construction." IRC-RR-324, National Research Council Canada.
- Park, C-S, Park, H-T (2010), "Improving Constructability Analysis Tasks by Applying BIM Technology", Journal of the Korea Institute of Construction Engineering and Management, Vol. 11. No. 2, pp. 137-146. https://doi.org/10.6106/KJCEM.2010.11.2.137
- Lee, H-W (2006), "Queuing Theory", Sigma Press.
- D. Darshi De Saram, Syed M. Ahmed, Michael Anson (2004), "Suitability of the Critical Incident Technique to Measure Quality of Construction Coordination", Journal of Management in Engineering, Vol. 20 No. 3, pp. 97-109. https://doi.org/10.1061/(ASCE)0742-597X(2004)20:3(97)
- Fang-Ying Shen, Andrew S. Chang (2011), "Exploring Coordination Goals of Construction Projects", Journal of Management in Engineering, Vol. 27 No. 2, pp. 90-96. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000046
- Rafael Sacks, Lauri Koskela, Bhargav A. Dave, Robert Owen (2010), "Interaction of Lean and Building Information Modeling in Construction", Journal of Construction Engineering and Management, Vol. 136 No. 9, pp. 968-980. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000203
- Eckblad, S (2007), "Integrated project delivery-A working definition", AIA California Council, Sacramento, Calif.
- Frederick S. Hiller, Mark S. Hiller (2010), "Introduction to Management Science, A Modeling and Case Studies Approach with Spreadsheets, 4th Edition", McGrawHill, Chapter 11.
- Charles M. Eastman (1999), "Building Product Model : computer environments supporting design and construction", CRC Press LLC.
Cited by
- BIM-Based Digital Fabrication Process for a Free-Form Building Project in South Korea vol.2019, pp.None, 2015, https://doi.org/10.1155/2019/4163625
- BIM을 이용한 건설프로젝트의 이점에 관한 사례 연구 - 국내 건축공사 사례를 중심으로 - vol.9, pp.4, 2015, https://doi.org/10.13161/kibim.2019.9.4.010