Browse > Article
http://dx.doi.org/10.13161/kibim.2015.5.2.001

A Case Study on BIM Operating and Performance Measurement in Construction Phase  

Ham, Nam-Hyuk (한양대학교 건축환경공학과)
Kim, Jae-Jun (한양대학교 건축공학과)
Publication Information
Journal of KIBIM / v.5, no.2, 2015 , pp. 1-11 More about this Journal
Abstract
Despite a lot of research on BIM, there is no quantitative study to measure accurately the performance of BIM coordination service. Thus, this study suggested method to measure the performace of BIM coordination services, applying queueing models in the field of management science. To analyze queuing system of BIM coordination services, a group of BIM coordinator were selected. Through focus group interviews with experts were used in the analysis to derive mean arrival rate(${\lambda}$), mean service rate(${\mu}$) of BIM coordination services. Single-server queuing model(M/M/1), multiple server queuing model(M/M/s) is utilized for the BIM coordination services performance measurement in construction phase. This study has significant quantitative performance measurement approaches that can be utilized in the decision-making for the improvement of the BIM coordination services and to support the review of the alternatives accordingly. But There is a limit but it is difficult to take into account the increase or decrease of the cost of alternatives according to the review.
Keywords
BIM Coordination Service; Performance Measurement; Queueing Model;
Citations & Related Records
Times Cited By KSCI : 4  (Citation Analysis)
연도 인용수 순위
1 Lee, J-H, Yi J-S (2011), "A Study on BIM Capability Evaluation for Design Organization", Journal of Architectural Institute of Korea, Vol. 27. No. 6. pp. 257-266.
2 Seo, H-C, Oh, J-K, Kim, J-J (2012), "The Development of an Evaluation Model for the Work Environment of the BIM-based Architectural Design Firms", Journal of Architectural Institute of Korea, Vol. 28. No. 5. pp. 95-105.
3 Lee, J-H (2009), "Development of BIM capability evaluation model for design organization", Iwha University.
4 Neelamkavil, J., S. Ahamed (2012), "The Return on Investment from BIM-driven Projects in Construction." IRC-RR-324, National Research Council Canada.
5 Park, C-S, Park, H-T (2010), "Improving Constructability Analysis Tasks by Applying BIM Technology", Journal of the Korea Institute of Construction Engineering and Management, Vol. 11. No. 2, pp. 137-146.   DOI
6 Lee, H-W (2006), "Queuing Theory", Sigma Press.
7 D. Darshi De Saram, Syed M. Ahmed, Michael Anson (2004), "Suitability of the Critical Incident Technique to Measure Quality of Construction Coordination", Journal of Management in Engineering, Vol. 20 No. 3, pp. 97-109.   DOI
8 Fang-Ying Shen, Andrew S. Chang (2011), "Exploring Coordination Goals of Construction Projects", Journal of Management in Engineering, Vol. 27 No. 2, pp. 90-96.   DOI
9 Rafael Sacks, Lauri Koskela, Bhargav A. Dave, Robert Owen (2010), "Interaction of Lean and Building Information Modeling in Construction", Journal of Construction Engineering and Management, Vol. 136 No. 9, pp. 968-980.   DOI
10 Eckblad, S (2007), "Integrated project delivery-A working definition", AIA California Council, Sacramento, Calif.
11 Frederick S. Hiller, Mark S. Hiller (2010), "Introduction to Management Science, A Modeling and Case Studies Approach with Spreadsheets, 4th Edition", McGrawHill, Chapter 11.
12 Charles M. Eastman (1999), "Building Product Model : computer environments supporting design and construction", CRC Press LLC.
13 Ministry of Land, Transport and Maritime (2010), "BIM Implementation Guideline in Architectural Part".
14 Public Procurement Service (2013), "Facility BIM Implementation Basic Guideline v1.2".
15 Kwon, O-C, Cho, C-W (2011), "Proposal of BIM Quality Management Standard by Analyzing Domestic and International BIM Guides", Journal of the Korea Institute of Building Construction, Vol. 11, No. 3, pp. 265-275.   DOI   ScienceOn
16 Shin, T-H (2011), "Proposal for a contractor BIM Implementation Strategy", Journal of the Korea Institute of Building Construction, Vol. 11, No. 2, pp. 26-32.
17 Jung, J-K, Kim, Y-S (2012), "Analysis of Core Ability of BIM Manager - From the Standpoint of General Contractor", Journal of Architectural Institute of Korea, Vol. 28. No. 1, pp. 175-182.
18 Lu, N. and Korman, T. (2010) Implementation of Building Information Modeling (BIM) in Modular Construction: Benefits and Challenges. Construction Research Congress 2010, pp. 1136-1145.
19 Lee, C-J, Lee, G, Won, J-S, Yoon, S-C (2011) "Derivation of High-Priority Items for BIM Adoption in CM Service-CM Service for High Rise Building", Journal of Architectural Institute of Korea, Vol. 27. No. 6, pp. 115-122.
20 Kang, T-W, Won, J-S, Lee, G (2013), "A Study on the Development Direction of a BIM Performance Assessment Tool", Journal of Korea Spatial Information Society, Vol. 21. No. 1, pp. 53-62.
21 Song, M-R, Yoon, S-W, Chin, S-Y (2011), "BSC Based Measurement of Satisfaction Degree For Based BIM Construction Projects", Journal of Korea Institute of Construction Engineering and Management, Vol. 12. No. 4, pp. 117-129.