• 제목/요약/키워드: PC apartment building

검색결과 28건 처리시간 0.022초

PC부재의 접합부 거푸집의 개선방안 연구 -공동주택을 중심으로- (Improvement Plan for Connecting Form of PC Member -Focused on Apartment Buildings-)

  • 김선형;최재휘;김선국;이동훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.9-12
    • /
    • 2010
  • Conventional apartment building projects have favored wall slab structure for the ease of construction and economic viability. However, wall slab structure, consisting of bearing walls, makes remodeling a difficult challenge. In addition, as the amendment to the Building Act in November, 2005 incentivized easy-to-remodel Rahmen structure design for apartment building in terms of floor area ratio and the number of stories, were are seeing more use of PC construct method in apartment building projects gradually. However, PC construction method requires complex connections between beams and columns, making it difficult to install and remove formwork. Furthermore, it is not possible to reuse forms after removal, generating lots of construction wastes, and it is necessary to install new forms again when the size of connection changes in line with modification of column cross-section. Researchers in Korea and elsewhere in the world have focused on structural performance of connection in PC construction method, with little attention to alternative approaches to improving connection forms for PC construction method. Accordingly, this research aims to study an approach to improving connection forms for PC construction method.

  • PDF

보-기둥구조 PC공동주택 시공관리를 위한 골조공사 ADM공정표 작성 (Writing ADM Network Diagram of Frame Work for the Precast Concrete Public Apartment Building Construction Management)

  • 김기호;김민준;김진원;이동건;손정락;이범식
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.221-222
    • /
    • 2022
  • In this study, the work flow of the construction process was analyzed based on construction monitoring for a building of the middle size beam-column system Precast Concrete(PC) apartment building supplied by LH, and the Arrow Daigram Method(ADM) network diagram of its construction was written. The results of this study are judged to be able to improve productivity by using the PC structure apartment building construction plan to calculate a reasonable construction period and prepare a process management method for the PC structure frame construction.

  • PDF

보-기둥구조 PC공동주택의 부재 조립기간에 대한 수학적 알고리즘 (Mathematical Algorithm for Members Erection Period of Beam-Column System PC Apartment Building )

  • 김기호;이범식;김진원;이동건;김민준;손정락
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.117-118
    • /
    • 2023
  • Estimating the construction period at the initial stage of the project and determining whether it is appropriate is very important for the developer's decision-making and the success of the construction company's business. Existing researchers have conducted various studies to calculate the appropriate construction period, but there is no study on the influencing factors and methodology for the construction period of beam-column PC apartment building frame construction. The purpose of this study is to calculate the PC member assembly time using the mathematical algorithm of PC member assembly. The results of this study can be used as basic data to calculate the construction date of the standard floor of PC construction.

  • PDF

보-기둥구조 PC공동주택 골조공사 작업관계 분석 (Relationship Analysis of Field Work in Beam-Column System Frame Work of the Precast Concrete Public Apartment Building)

  • 김기호;김진원;김민준;이동건;손정락;이범식
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.41-42
    • /
    • 2022
  • This study analyzed the process related to the linkage between on-site work targeting the middle size Precast Concrete(PC) public apartment building with beam-column system and prepared on-site works flow relationship diagram in which the wet process consists of core Critical Path(CP) to prepare a network diagram of the Precedence Diagram Method(PDM). Through this study, it is expected that it will be possible to maximize the project management capability by suggesting a method to minimize risk factors and the optimized process management of the beam-column system PC public apartment building.

  • PDF

PC 및 RC공동주택 골조공사에 대한 공사기간 절대비교 (Absolute Comparison of Construction Periods between Precast Concrete and Reinforced Concrete Apartment Buildings )

  • 김기호;이범식;김진원;김연호;이동건;손정락
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.293-294
    • /
    • 2023
  • In accordance with recent changes in construction trends, interest in introducing the OSC, such as the Precast Concrete, is increasing in apartment buildings. In domestic studies, studies on the prediction of the construction period of PC apartment buildings through simulation have been conducted, but there is no study on the comparison of the construction period according to the actual construction of Precast Concrete(PC) and Reinforced Concrete(RC). Therefore, this study seeks to grasp the technology of the current PC construction method and to secure the original technology of project management through comparison of the absolute time of frame construction for PC and RC buildings composed of the same plane.

  • PDF

PC 공동주택 외벽용 방수 실란트 자재의 성능 평가 연구 (A Study on the Performance Evaluation of Waterproof Sealant Materials for the Exterior Wall of PC Apartment House)

  • 고효진;김용로
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.221-222
    • /
    • 2023
  • In this study, the performance evaluation of waterproof sealant materials applied to the outer wall of PC apartment houses was conducted. The sealant for PC members must have resistance to movement, and since it is exposed to outside air, weather resistance and water resistance are required.

  • PDF

15년 경과한 PC아파트의 누수경로 조사결과 (Path of Water Leakage of PC Apartment House 15 Years Have Elapsed)

  • 이정훈;배기선;김상연;최성민;오상근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.156-157
    • /
    • 2014
  • PC apartment house 15 years have elapsed have various deteriorations by water leakage in roof and wall. The prior investigation such as investigating of leakage repair history of PC apartment and the field investigation were carried out to solve the water leak problem in its structure. The path of water was analyzed on the parts of greatest water leak such as roof parapet, roof floor, side wall, corridor and balcony. As a result, the specific path of the water leakage was identified in various structure units.

  • PDF

국내 PC 아파트 접합부 누수 방지를 위한 마감상세 분석 (Analysis of finishing details to Prevent leakage of PC Apartment Joints in Korea)

  • 김태호;고효진
    • 한국공간구조학회논문집
    • /
    • 제21권4호
    • /
    • pp.81-89
    • /
    • 2021
  • Recently, interest in OSC(Off Site Construction) is increasing due to the trend of a decrease in skilled workers and an increase in labor costs. In this regard, PC(Precast Concrete) is being reviewed for apartments, the most common type of housing in Korea. As the biggest concern for PC apartment houses, civil complaints such as inter-floor noise and leakage were presented. In this study, the details of the joints were reviewed based on the past cases of PC apartments, and the details of the recently constructed or planned PC apartments were investigated. Through this, the leakage path in the past was analyzed through the existing research literature and data. And wall type RC and PC apartment joint leakage test was performed and we found the needs for a detail of waterproof steps, sealant. Also, joint details were investigated for a rahmen type apartment housing under construction. At last, A discussion was conducted on the direction for a detailed proposal of an improved joint in the future.

공동주택의 PC계단실 조립 프로세스 분석 (Erection Process Analysis of the PC Staircase in the Apartment Building )

  • 김기호;이범식;이동건;김민준;손정락
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.103-104
    • /
    • 2023
  • The purpose of this study is to specify an erection process for each member of the PC staircase. For this purpose, field work was investigated at the LH PC apartment building site and classified in detail through unit work analysis inspection. The results of this study are intended to be used as basic data for creating work sequences and related guidelines for LH's PC staircase.

  • PDF

PC 아파트 누수 억제를 위한 접합부 상세 분석 (Research of Joint Details to Reduce Leakage in PC Apartments)

  • 김태호;구정모;김용로
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 가을 학술논문 발표대회
    • /
    • pp.131-132
    • /
    • 2020
  • Recently, interest in OSC(Off Site Construction) is increasing due to the trend of a decrease in skilled workers and an increase in labor costs. In this regard, PC(Precast Concrete) is being reviewed for apartments, the most common type of housing in Korea. As the biggest concern for PC apartment houses, civil complaints such as inter-floor noise and leakage were presented. In this study, the details of the joints were reviewed based on the past cases of PC apartments, and the details of the recently constructed or planned PC apartments were investigated. Through this, the leakage path in the past was analyzed through the existing research literature and data, and a discussion was conducted on the direction for a detailed proposal of an improved joint in the future.

  • PDF