Relationship Analysis of Field Work in Beam-Column System Frame Work of the Precast Concrete Public Apartment Building

보-기둥구조 PC공동주택 골조공사 작업관계 분석

  • Published : 2022.11.10

Abstract

This study analyzed the process related to the linkage between on-site work targeting the middle size Precast Concrete(PC) public apartment building with beam-column system and prepared on-site works flow relationship diagram in which the wet process consists of core Critical Path(CP) to prepare a network diagram of the Precedence Diagram Method(PDM). Through this study, it is expected that it will be possible to maximize the project management capability by suggesting a method to minimize risk factors and the optimized process management of the beam-column system PC public apartment building.

Keywords

Acknowledgement

본 연구는 국토교통부/국토교통과학기술진흥원의 지원으로 수행되었음(과제번호 22ORPS-B158109-03).