• Title/Summary/Keyword: Overhead contact line

Search Result 64, Processing Time 0.026 seconds

Analysis of Percentage of Arcing between Pantograph and Overhead Contact Line as a Function of Duration of Arc (팬터그래프와 전차선간 최소 이선아크 지속시간에 따른 이선율 변화량 분석)

  • Park, Young;Lee, Kiwon;Kwon, Sam-Young;Park, Chulmin;Kim, Jae-Kwang;Choi, Won Seok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.6
    • /
    • pp.855-859
    • /
    • 2014
  • Quality criteria for interaction between a pantograph and overhead contact wire is a most important requirement to assess of the performance for the current collection system. Interaction performance between pantograph and catenary system is subject to approval by the infrastructure manager when a new design and contraction of overhead contact line and pantograph are installed. Among the various performance, percentage of arcing at maximum line speed is a simple test method compared with contact force of pantograph due to direct sensing of pantagraph, calibrations, installations of train, and etc. On the other hand, percentage of arcing is need to reliable arcing detector and general requirements with accordance with EN 50317. In this paper, percentage of arcing are investigated on the function of duration of arc and proposed which is satiable of percentage of arcing. As a results, we proposed which duration of arcs are unsuitable from infrastructures point of view as performance testing for quality of current collection.

Design of Active Pantograph Controller (능동 판토그래프 제어기 설계에 관한 연구)

  • Ko Tae-Hwan;Um Ju-Hwan;Eum Ki-Young;Shin Seung-Kwon
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.4
    • /
    • pp.361-366
    • /
    • 2005
  • The high investment is necessary for the new high speed lines. So the KRRI has been interested in the possibility of upgrading the existing line in order to speed up the train in the conventional lines. The pantograph in train is indispensable in order to supply the electrification equipments with power in safe. The pantograph and the overhead wire form a dynamic coupled system and they affect each other through the contact force. Unfortunately, as the operational speed of a train increases, the vibration of the pantograph and the overhead wire also increases. This may lead to a zero contact force between the pantograph head and the overhead wire, which can results in the loss of contact, arching and abrasion. If the arching and spark happen between the pantograph and the overhead catenary system, the EMI(electro magnetic interface) and noises may occur. After all, the quality of current collection is deteriorated. This paper describes the dynamic response between the pantograph and catenary system by the numerical simulations and presents the LQ-servo controller to reduce the contact force variation

Development of Catenary Stagger and Height Measurement System using Laser (레이저를 이용한 전차선 편위 및 높이 측정 시스템 개발)

  • Song, Sung-Gun;Lee, Teak-Hee;Song, Jae-Yeol;Park, Seong-Mo
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.6
    • /
    • pp.569-574
    • /
    • 2008
  • Catenary and Pantograph are used to transmit electrical energy to electric railways. Catenary (Overhead Contact Lines) should be installed precisely and managed for stable train operations. But external factors such as weather, temperature, etc., or aging affect catenary geometry. Changed catenary stagger and height cause high voltage spark or instant electric contact loss. Big spark derived from contact loss can damage the pantograph carbon strip and overhead contact lines that might interrupt the train operations. Therefore, to prevent a big scale spark or electric contact loss, catenary maintenance are required catenary geometry measurement systems with catenary maintenance capability. In this paper, we describe the development of catenary height and stagger measurement system. The catenary height and stagger measurement system uses Acuity company's AR4000 Laser Range Finder for distance measurement and AccuRange Line Scanner for degree measurement. This system detects suspicious overhead line sections with excessive stagger and height stagger variance.

The review of the safety for the development of insulated hanger in overhead contact line (전차선로 절연 행거 개발에 대한 안전성 검토)

  • Lee, Jae-Bong;Park, Weon-Chan
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1431-1440
    • /
    • 2009
  • A subway in Seoul has had a major role of public transportation after the opening of Seoul Subway Line 1 on August 15, 1974 and it has reached 34.7% of the transportation of Seoul citizens. The extended length of the subway system suppled with DC power in Korea is about 500km. In this system, the devices which are proper for regenerative power system are being required because of changeover from old braking and ATS signal system to regenerative braking and ATO signal system. In this paper, we reviewed the safety standards for the insulated hangers in overhead contact line. These hangers which have depended on foreign imports are being developed in Korea considering ease of demand and supply and economic effects.

  • PDF

Implementation of Optimization of the Uplift Amount Measurement System of Overhead Contact Line (전차선 압상량 검출을 위한 최적 시스템 구현)

  • Park, Young;Lee, Kiwon;Park, Chulmin;Kwon, Sam-Young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.6
    • /
    • pp.886-890
    • /
    • 2013
  • Uplift of contact wire and dynamic characteristics between pantograph and contact wire are key interaction performance of OCS (Overhead Catenary System). These two evaluation items are the approval criteria for the performance between OCS and pantograph. A telemetry system or DAQ (Data Acquisition) System based on wireless communication make it monitor a dynamic behavior which is measured directly in a 25 kv like parts. While permissible working time is too short time to install is too long. In this paper, it is described that optimization the telemetry measurement system for OCS and increasing accuracy, easy adaptation, and faster handling can be also achieved through the study.

A study on vibrational characteristics of the overhead-line (가선시스템의 진동특성 연구)

  • Lee Eung-Shin;Cho Yong-Hyeon;Park Sung-Yong;Jeon Byung-Uk;Lee Jang Mu
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.152-157
    • /
    • 2005
  • Recently, higher speeds have been promoted in old overhead-lines. For high-speed operation in electric railways, increasing contact loss of the pantograph is one of the most important subjects. The contact loss causes power interruption and increases wear of contact strips and contact wires. In order to investigate the causes of contact loss and to work out effective improvement methods, theoretical analyses, experiments have been carried out. First of all, the wave propagating velocity (phase velocity) and characteristics of contact wire are one of the important indices for the current collecting performance. In this paper, mathematical formula arc derived for the prediction of the traveling wave velocity. The measured values in the experiment agree well with the theoretical predictions.

  • PDF

Technique for the Speed Up of Neutral Section on the Convention Line Catenary System (기존선 교류전기철도 절연구분장치에서의 속도향상 기술)

  • Chang, Sang-Hoon;Lee, Ki-Won
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.294-301
    • /
    • 2008
  • At the neutral sections, There are neutral sections inserted in overhead contact line between the substations to divide different phase current sections of AC electrified lines. Except convention line, a large stress occurs in the contact wire near the fittings under passing pantographs. So, in order to raise the train speed over 150km/h, a new type section has been adopted.

  • PDF

Temperature Analysis of Overhead Contact line Using De-icing System (해빙 시스템을 이용한 전차선 온도 특성에 관한 연구)

  • Park, Young;Kwon, Sam-Young;Jung, Ho-Sung;Park, Hyun-Jun;Cho, Young-Hyeon;Kim, Joo-Rak;Ahn, Byeong-Lib;Won, Woo-Sik;Lee, Ju
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2005.07a
    • /
    • pp.601-602
    • /
    • 2005
  • In the cold and temperate regions of Korea the icing and ice coats on 25 kV overhead contact wire during winter is a very serious problem. This generates shocks at the mechanical interface of the collecting strips of the pantograph and the contact wire and extra electrical resistance, which may affect quality of current collection at the contact wire / collecting strips of pantograph interface. De-icing operations should be performed just before train operation to avoid the formation of another ice layer. This paper presents temperature analysis of the de-icing system which could be applied to the overhead contact wire of railways.

  • PDF

Study on Power Line Coupler for Auxiliary Power to Overhead Line (철도 전차선의 보조전원을 위한 전력선 커플러 연구)

  • Lee, Gunbok;Yi, Kyung-Pyo;Kim, Myung Yong;Lee, Su Gil;Chang, Sang Hoon
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.29 no.7
    • /
    • pp.566-569
    • /
    • 2018
  • A power line coupler that can apply high-frequency power to a railway overhead line structure was analyzed. It is difficult to supply auxiliary power to an overhead line in a high-voltage environment, and doing so requires a long-distance transfer. A method is proposed that utilizes the resonance on the Rogowski coil, which does not use a magnetic core. A simple overhead line structure was fabricated that consisted of a contact wire, messenger wire, and dropper. Couplers of various sizes were fabricated and deployed on the messenger wire, and the transfer characteristics of the two couplers were compared at a distance. As a result of applying the matching circuit to the coupler, the transmission efficiency was 53% at a distance of 2.5 m. The proposed method shows that it is possible to apply the auxiliary power by using the existing conductor in a special structure, such as the overhead line.

Development of Numerical Analysis Model to Estimate the Contact Force between the Pantograph and Catenary of a High-speed Train (고속 철도 차량용 판토그래프와 가선계의 접촉력 예측을 위한 수치 해석 모델 개발)

  • Jung, Sung-Pil;Park, Tae-Won;Kim, Young-Guk;Paik, Jin-Sung
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.21 no.5
    • /
    • pp.461-467
    • /
    • 2011
  • This study aims to create a numerical analysis model which can investigate the dynamic interaction between pantograph and overhead contact wire used for a high-speed railway vehicle, and validate the simulation results according to EN 50318 standard. Finite element analysis models of pantograph and overhead contact line are created using SAMCEF, a commercial FE analysis program. The mean, standard deviation, maximum and minimum values of contact forces are obtained. The simulation results are validated according to EN 50318, and the possibility of simulating the collecting characteristic of an actual pantograph system by using the developed model is discussed.