• Title/Summary/Keyword: Order quantity

Search Result 1,652, Processing Time 0.029 seconds

Effects of San-Yin-Jio(SP-6) pressure on duration of delivery time and quantity of blood loss for primipara (삼음교(三陰交) 자극이 초산부(初産婦)의 분만(分娩) 소요시간과 실혈량(失血量)에 미치는 효과(效果))

  • Kim, Woo-hwan;Kim, Won-ill;Lee, Kyung-hee;Youn, Hyoun-min
    • Journal of Acupuncture Research
    • /
    • v.20 no.5
    • /
    • pp.82-92
    • /
    • 2003
  • Objective: To appreciate the effect of San-Yin-Jiao(SP-6) pressure on duratof delivery time and quantity of blood loss in order to verify the possibility of application to clinic of San-Yin-Jiao pressure. Methods: The design of this study is nonequivalent control group non- synchronized design. The subjects are 39 persons who are made up of SP-6 pressure applied(experimental) group 20 persons and to control group 19 persons. Collected data were analyzed as frequency, percentage, t-test, $x^2-test$ using SPSS 10.0 WIN Program. Conclusions: San-Yin-Jiao(SP-6) pressure not only make short duration of delivery time, but also decline quantity of blood loss in effect. 1. It could be necessary that the study of the effects of San-Yin-Jio(SP-6) pressure on duration of delivery time and quantity of blood loss for primipara be done repeatedly. 2. It could be necessary to increase this sort of study through free random experimental design in order to generalize this experimental result.

  • PDF

Analysis of Multi-branch Inventory Distribution System for an Item with Low Level of Demand : Lost Sale Model (다지점으로 구성된 재고시스템의 최적화 분석 : 저수요, 유실판매 모형)

  • Yoon Seung Chul;Choi Young Sub
    • Proceedings of the Society of Korea Industrial and System Engineering Conference
    • /
    • 2002.05a
    • /
    • pp.349-357
    • /
    • 2002
  • This research is basically deals with an inventory distribution system with several regional sales branches. Under the continuous review policy, each sales branch places an order to its supplier whenever on hand plus on order inventory falls on the order point, and the order quantity is received after elapsing a certain lead time. This research first shows the method how to apply the product with low lever of demand into the continuous review policy. For the application, we use an order level as the maximum level of inventory during an order cycle. Also we analyze the lost sales case as a customer behavior. Further we use variable demands and variable lead times for more realistic situation. Based on the above circumstances, the research mainly discusses those methods to decide the optimal order level, order point, and order quantity for each sales branch which guarantees the system wide goal level of service, while keeping the minimum level of the system wide total inventory.

  • PDF

Analysis of Multi-branch Inventory Distribution System for an Item with Low Level of Demand and Lost Sale Allowed (다지점으로 구성된 재고시스템의 최적화 분석 : 저수요, 유실판매 모형)

  • 윤승철;최영섭
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.25 no.3
    • /
    • pp.78-84
    • /
    • 2002
  • This research is basically deals with an inventory distribution system with several regional sides branches. Under the continuous review policy, each sales branch places an order to its supplier whenever on hand plus on order inventory falls on the order point, and the order quantity is received after elapsing a certain lead time. This research first shows the method how to apply the product with low lever of demand into the continuous review policy. For the application, we use an order level as the maximum level of inventory during an order cycle. Also we analyze the lost sales case as a customer behavior. Further we use variable demands and variable lead times for more realistic situation. Based on the above circumstances, the research mainly discusses those methods to decide the optimal order level, order point, and order quantity for each sales branch which guarantees the system wide goal level of service, while keeping the minimum level of the system wide total inventory.

The Use of Particle Swarm Optimization for Order Allocation Under Multiple Capacitated Sourcing and Quantity Discounts

  • Ting, Ching-Jung;Tsai, Chi-Yang;Yeh, Li-Wen
    • Industrial Engineering and Management Systems
    • /
    • v.6 no.2
    • /
    • pp.136-145
    • /
    • 2007
  • The selection of suppliers and the determination of order quantities to be placed with those suppliers are important decisions in a supply chain. In this research, a non-linear mixed integer programming model is presented to select suppliers and determine the order quantities. The model considers the purchasing cost which takes into account quantity discount, the cost of transportation, the fixed cost for establishing suppliers, the cost for holding inventory, and the cost of receiving poor quality parts. The capacity constraints for suppliers, quality and lead-time requirements for the parts are also taken into account in the model. Since the purchasing cost, which is a decreasing step function of order quantities, introduces discontinuities to the non-linear objective function, it is not easy to employ traditional optimization methods. Thus, a heuristic algorithm, called particle swarm optimization (PSO), is used to find the (near) optimal solution. However, PSO usually generates initial solutions randomly. To improve the PSO solution quality, a heuristic procedure is proposed to find an initial solution based on the average unit cost including transportation, purchasing, inventory, and poor quality part cost. The results show that PSO with the proposed initial solution heuristic provides better solutions than those with PSO algorithm only.

Impacts of Delivery Vehicle Routing on Different Inventory Strategies and Network Configurations (재고전략 및 네트워크 구성에 따른 배송차량의 운영특성 연구)

  • Won, Min-Su;Gang, Gyeong-U
    • Journal of Korean Society of Transportation
    • /
    • v.28 no.5
    • /
    • pp.91-106
    • /
    • 2010
  • Recently, interest in supply chain management is rising along with the increasing oil prices and traffic congestion. In particular, people started studying the issue, but realized that advantageous strategies for suppliers and retailers are not always advantageous to a carrier. Therefore, in this study the atuhors set up a simulation scenario to understand delivery vehicle routing problems under various inventory policies, namely Economic Order Quantity (EOQ) and Periodic Order Quantity (POQ) and network configurations. First, the authors made a virtual supply chain. Then they analyzed characteristics of delivery vehicle routing under various inventory policies (EOQ and POQ) and network configurations. As a result, the POQ inventory policy decreases the number of vehicles, the number of drivers, and the service time of vehicles. Also, the centralized network increases the load factor of vehicles and decreases the service time of vehicles. In other words, the centralized network and the POQ inventory policy are better for the carrier. These results show a savings of 15,556,806 won ($13,389.10) in a month: a reduction of 17%.

Economic Order Quantity(EOQ) Determination Process for Construction Material considering Demand Variation and Stockyard Availability (일일 수요량 변동성과 가용야적면적을 고려한 건설 자재의 경제적주문량(EOQ) 산정 프로세스)

  • Yun, Jung-Sook;Yu, Jung-Ho;Kim, Chang-Duck
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.33-42
    • /
    • 2011
  • Part of material and inventory management is one of important factor for business interests. But importance of material and inventory management in domestic construction project has been relatively devalued. The existing study of inventory has been studied with limited individual factor about inventory management. Therefore construction material management needs improvement via an accurate prediction with whole and systematic process viewpoint. and existing theory of material and inventory introduction to construction from manufacturing needs reflecting characteristics about construction project. This paper suggests material management process for economic material management. This paper to make a unit curtain wall of case construction project comparison between total cost of existing material management process and total cost of economic order quantity of proposal material management process To verify usefulness of order point and order quantity determination process.

An Economic Order Quantity Model under Random Life Cycle (불확실한 수명주기의 제품에서의 경제적 주문량 모형)

  • Yun, Won-Young;Moon, Il-Kyeong
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.19 no.1
    • /
    • pp.73-77
    • /
    • 1993
  • This paper considers an Economic Order Quantity Model under random life cycle. It is assumed that the life cycle of the product is unknown; a random variable. Three cost parameters are considered; ordering cost, inventory carrying cost and salvage cost. Expected total cost is the optimization criterion. We show that the optimal cycle length is unique and finite, and present a simple line search method to find an optimal cycle length.

  • PDF

Two-echelon inventory model for a manufacturer with multiple customers through nonlinear pricing (비선형 가격정책에 의한 생산자와 다수 구매자간의 양 계층 재고관리모형)

  • ;Lee, Kyung Keun
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.17 no.2
    • /
    • pp.3-14
    • /
    • 1992
  • The efficiency of marketing channel of distribution between a manufacturer with several customers can be increase by influencing the order quantity of customer. Manufacturer reduces average inventory holding cost by penalizing the large order quantity from the customer. Such a penalty is significant only if the manufacturer's unit inventory holding cost is relatively large. Conditions under which such penalizing can be beneficial to both parties are derived.

  • PDF

An Inventory Policy for Partial Backorders Case with Interest Rate (이자율(利子率)을 고려한 부분(部分) 부재고(負在庫) 재고(在庫) 모형(模型)에 관한 연구)

  • Kim, Jae-Wan;O, Se-Ho
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.13 no.2
    • /
    • pp.1-8
    • /
    • 1987
  • In this paper, a deterministic EOQ model with interest rate in which a proportion (${\beta}$) of the demand is backlogged and the rest (1-${\beta}$) is lost. The optimal order quantity is derived and the corresponding average cost is obtained, Sensitivity analysis is performed to sec the influence of interest rate on the optimal order quantity and the average cost. Finally a numerical example is given in which optimum quantities of the model developed in this study and those of the conventional EOQ model are compared.

  • PDF

Basic study of algorithm for steel quantity analysis of composite precast concrete members (합성 PC 부재의 철골 물량산출 알고리즘 기초연구)

  • Kim, Gyeongju;Lim, Chaeyeon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.96-97
    • /
    • 2014
  • Green Frame is a column-beam structure built by steel frame joints embedded in the columns and beams. Here, the steel frame embedded in the columns and beams is not a standardized product, instead it needs to be order-produced. The quantity for each steel frame size should be calculated to estimate the quantity of steel frames to be manufactured. However, it is highly time-consuming and requires a lot of effort in calculating the quantity of steel frames, for there are a wide range of steel frame types that are embedded in the columns and beams. To solve this problem, the study proposes an algorithm for calculation of the amount of steel frames with ease and promptness. When a program is developed using the algorithm proposed in the study in connection to the information on precast concrete members prepared in the design phase, it is anticipated that the manpower required as well as the manufacturing time will be decreased.

  • PDF