• 제목/요약/키워드: Optimal Procurement

검색결과 42건 처리시간 0.026초

회수제품 재가공이 이루어지는 시스템에서 최적 신제품 구매정책과 최적 주문량에 대한 연구 (Joint Decision of Optimal Procurement Policy and Optimal Order ize for a Product Recovery System)

  • 김은갑;정봉주
    • 대한산업공학회지
    • /
    • 제34권4호
    • /
    • pp.398-407
    • /
    • 2008
  • We consider a product recovery system that a single product is stocked in order to meet a demand from customers who may return products after usage. This paper addresses a problem of when to release a procurement process to replenish serviceable inventory and how many new products to procure. The structure of the optimal procurement policy is examined and numerically identified as a monotonic threshold curve. A numerical procedure is presented to jointly find the optimal procurement order size, optimal procurement policy, and optimal discounted profit. Sensitivity analysis also indicates that these optimal performance measurements have monotonic properties with respect to system parameters.

A Theoretical Analysis of Public Procurement for Innovation

  • SUNJOO HWANG
    • KDI Journal of Economic Policy
    • /
    • 제46권2호
    • /
    • pp.21-43
    • /
    • 2024
  • This paper provides a new theoretical rationale for public procurement for innovation (PPI), a unique policy encouraging public procurers to purchase innovative products. In contrast to existing studies that primarily emphasize the advantages of PPI, this paper takes a comprehensive approach, examining both the costs and risks associated with PPI, alongside its benefits. It finds a general condition under which PPI outperforms traditional public procurement. Under this condition, this paper demonstrates that PPI enhances social welfare by facilitating optimal risk-sharing between public procurers and the general economy. Additionally, it draws policy implications from a comparative analysis between the current PPI policy in Korea and an optimal PPI policy.

예산제약하에서 수리부속 최적조달요구량 산정 연구 (A Study of the Optimal Procurement to Determine the Quantities of Spare Parts Under the Budget Constraint)

  • 이상진;김승철;황지현
    • 경영과학
    • /
    • 제27권2호
    • /
    • pp.31-44
    • /
    • 2010
  • It is very important to forecast demand and determine the optimal procurement quantities of spare parts. The Army has been forecasting demand not with actual usage of spare parts but with request quantities. However, the Army could not purchase all of forecasted demand quantities due to budget limit. Thus, the procurement quantities depend on the item managers' intuition and their meetings. The system currently used contains many problems. This study suggests a new determination procedure; 1) forecasting demand method based on actual usage, 2) determining procurement method through LP model with budge and other constraints. The newly determined quantities of spare parts is verified in the simulation model, that represents the real operational and maintenance situation to measure the operational availability. The result shows that the new forecasting method with actual usage improves the operational availability. Also, the procurement determination with LP improves the operational availability as well.

동적 계획법을 이용한 LNG 현물시장에서의 포트폴리오 구성방법 (Optimal LNG Procurement Policy in a Spot Market Using Dynamic Programming)

  • 류종현
    • 대한산업공학회지
    • /
    • 제41권3호
    • /
    • pp.259-266
    • /
    • 2015
  • Among many energy resources, natural gas has recently received a remarkable amount of attention, particularly from the electrical generation industry. This is in part due to increasing shale gas production, providing an environment-friendly fossil fuel, and high risk of nuclear power. Because South Korea, the world's second largest LNG importing nation after Japan, has no international natural gas pipelines and relies on imports in the form of LNG, the natural gas has been traditionally procured by long term LNG contracts at relatively high price. Thus, there is a need of developing an Asian LNG trading hub, where LNG can be traded at more competitive spot prices. In a natural gas spot market, the amount of natural gas to be bought should be carefully determined considering a limited storage capacity and future pricing dynamics. In this work, the problem to find the optimal amount of natural gas in a spot market is formulated as a Markov decision process (MDP) in risk neutral environment and the optimal base stock policy which depends on a stage and price is established. Taking into account price and demand uncertainties, the basestock target levels are simply approximated from dynamic programming. The simulation results show that the basestock policy can be one of effective ways for procurement of LNG in a spot market.

동기화 생산을 위한 조달물류 개선에 관한 연구 (A Study on the improvement of procurement logistics for synchronous manufacturing)

  • 유성희;장정환;장청윤;이창호
    • 대한안전경영과학회지
    • /
    • 제15권4호
    • /
    • pp.261-267
    • /
    • 2013
  • In automobile company it is needed to establish the collaborative relationship between the assembly company and the part manufacturing company. In this paper we established the improvement for the procurement logistics and logistics in assembly company and thus we derived the near optimal procurement cycle through the simple EXCEL simulation and the improved inventory management method for H automobile company in CHINA. At this time we adopted the pull manufacturing process instead of push manufacturing process. We resulted that the manufacturing activity of both companies was stabilized and the usage of storage area in assembly company was reduced by 50%, especially it was reduced by 100% in the case of directly delivering the parts to assembly line through the third party logistics company.

A Mechanism to Derive Optimal Contractor-type & Action Comginations of a Single-source Procurement Contract

  • 정승호
    • 한국경영과학회지
    • /
    • 제24권2호
    • /
    • pp.41-51
    • /
    • 1999
  • In sole-source procurement contraction for government goods and services, the buyer (government) needs to derive the optimal actions from the contractor so the buyer can obtain the maximum utility and the contractor, or single-source supplier, is guaranteed the equivalent of a minimum level of profit. Under the assumption of risk-neutrality for both the buyer and the contractor and the buyer's unobservability of the contractor's action, it is necessary for the buyer to design a (mathematical) model to achieve the above objective. This paper considers the mathematical formulation in which two problems - moral hazard and adverse selection - are present simultaneously; furthermore, from the formulation, a GAMS (General Algebraic Modeling System) program is used for a possible buyer to obtain the optimal actions.

  • PDF

건설자재의 적정 리드타임 산정에 관한 연구 (A Study on Optimal Lead Time Selection Measures of the Construction Materials)

  • 이상범
    • 한국건축시공학회지
    • /
    • 제4권1호
    • /
    • pp.105-110
    • /
    • 2004
  • Resource procurement is an important management area because cost of resource covers 40% of total construction project cost and resource delivery has direct relationship with project performance. Integration of cost provides various potentials for effective and efficient project control. This study investigates the usefulness of time in resource procurement management focused on materials. These days, construction projects have characterized manufacture because of industrialization and component. Therefore, application of systematic resource planning has been requested in the construction. There are many companies conducting procurement of resource on the web by applying MRP, ERP etc. in the construction. However, in applying them in the construction yet, there is obstruction. MRP has the character doing its function under accurate cost prediction of resource. But prediction of resource is difficult in industry mechanism of the construction. If accurate cost prediction of resource is possible in the construction, it will be expected to reduce cost of procurement of resource substantially by applying successful resource planning model in the manufacture. On the basis of recent current, the purpose of study is to present procurement of resource system that period observance of construction and minimization of stock is possible by reflecting accurate lead-time to apply proactive thought to be able to cope with alteration of construction schedule efficiently in analyzing resource planning of the construction site.

Optimal Production Planning for Remanufacturing with Quality Classification Errors under Uncertainty in Quality of Used Products

  • Iwao, Masatoshi;Kusukawa, Etsuko
    • Industrial Engineering and Management Systems
    • /
    • 제13권2호
    • /
    • pp.231-249
    • /
    • 2014
  • This paper discusses a green supply chain with a manufacturer and a collection trader, and it proposes an optimal production planning for remanufacturing of parts in used products with quality classification errors made by the collection trader. When a manufacturer accepts an order for parts from a retailer and procures used products from a collection trader, the collection trader might have some quality classification errors due to the lack of equipment or expert knowledge regarding quality classification. After procurement of used products, the manufacturer inspects if there are any classification errors. If errors are detected, the manufacturer reclassifies the misclassified (overestimated) used products at a cost. Accordingly, the manufacturer decides to remanufacture from the higher-quality used products based on a remanufacturing ratio or produce parts from new materials. This paper develops a mathematical model to find how quality classification errors affect the optimal decisions for a lower limit of procurement quality of used products and a remanufacturing ratio under the lower limit and the expected profit of the manufacturer. Numerical analysis investigates how quality of used products, the reclassification cost and the remanufacturing cost of used products affect the optimal production planning and the expected profit of a manufacturer.

Spatiotemporal chronographical modeling of procurement and material flow for building projects

  • Francis, Adel;Miresco, Edmond;Le Meur, Erwan
    • Advances in Computational Design
    • /
    • 제4권2호
    • /
    • pp.119-139
    • /
    • 2019
  • Planning and management building projects should tackle the coordination of works and the management of limited spaces, traffic and supplies. Activities cannot be performed without the resources available and resources cannot be used beyond the capacity of workplaces. Otherwise, workspace congestion will negatively affect the flow of works. Better on-site management allows for substantial productivity improvements and cost savings. The procurement system should be able to manage a wider variety of materials and products of the required quality in order to have less stock, in less time, using less space, with less investment and avoiding multiple storage stations. The objective of this paper is to demonstrate the advantages of using the Chronographic modeling, by combining spatiotemporal technical scheduling with the 4D simulations, the Last Planner System and the Takt-time when modeling the construction of building projects. This paper work toward the aforementioned goal by examining the impact that material flow has on site occupancy. The proposed spatiotemporal model promotes efficient site use, defines optimal site-occupancy and workforce-rotation rates, minimizes intermediate stocks, and ensures a suitable procurement process. This paper study the material flow on the site and consider horizontal and vertical paths, traffic flows and appropriate means of transportation to ensure fluidity and safety. This paper contributes to the existing body of knowledge by linking execution and supply to the spatial and temporal aspects. The methodology compare the performance and procurement processes for the proposed Chronographic model with the Gantt-Precedence diagram. Two examples are presented to demonstrate the benefits of the proposed model and to validate the related concepts. This validation is designed to test the model's graphical ability to simulate construction and procurement.

가격할인과 처분이 가능한 동적 수송-재고 모형 (A Dynamic Transportation-Inventory Model with Quantity Discounts and Disposals)

  • 손권익
    • 대한산업공학회지
    • /
    • 제16권1호
    • /
    • pp.27-36
    • /
    • 1990
  • This study deals with the dynamic transportation-inventory model for a single product from which the optimal procurement quantities and the transportation modes are determined simultaneously over a finite planning horizon. Moreover, it covers the situation where quantity discounts are applied to the transportation cost as well as the purchase cost and disposals of the excess are possible at the end of each period. For a relevant mathematical model formulated, the theorems and properties of an optimal solution are discussed to present the efficient algorithm. A numerical example is solved to illustrate the algorithm developed.

  • PDF