1 |
Su, X. L., Zhang, A.R. and Cai, H. (2012), "GIS-based buffering for construction workspace management, Construction Research Congress, West Lafayette, Indiana, 1252-1261.
|
2 |
Thomas, H.R., Riley, D. and Messner, J.I. (2005), "Fundamental principles of site material management", J. Construct. Eng. Manag., 131(7), 808.
DOI
|
3 |
Tufte, E.R. (1983), The Visual Display of Quantitative Information, Graphics Press, Cheshire, CT, U.S.A.
|
4 |
Winch, G.M. and North, S. (2006), "Critical space analysis", J. Construct. Eng. Manag., 132(5), 473-481.
DOI
|
5 |
Zouein, P.P. and Tommelein, I.D. (2001), "Improvement algorithm for limited space scheduling". J. Construct. Eng. Manag., 127(2), 116-124.
DOI
|
6 |
Su, X. and Cai, H. (2014), "Life cycle approach to construction workspace modeling and planning", J. Construct. Eng. Manag., 140(7), 1-12.
|
7 |
Ala-Risku, T. and Karkkainen, M. (2006), "Material delivery problems in construction projects: A possible solution", J. Production Economics, 104(1), 19-29.
DOI
|
8 |
Bell, L.C. and Stukhart, G. (1987), "Costs and benefits of materials management systems", J. Construct. Eng. Manag., 113(2), 222-234.
DOI
|
9 |
Bertelsen, S. and Nielsen, J. (1997), "Just-in-time logistics in the supply of building materials", Proceedings of the 1st International Conference on Construction Industry Development, Singapore, December.
|
10 |
Bertin, J. (2005), Semiologie graphique, les diagrammes - les reseaux - les cartes (4th Ed.), EHESS, Paris.
|
11 |
Francis, A. (2016), "A Chronographic protocol for modelling construction projects", Proceedings of the Institution of Civil Engineers-Management, Procurement and Law, 169(4), 168-177.
DOI
|
12 |
Chavada, R.D., Kassem, M., Dawood, N.N. and Naji, K.K. (2012), "A framework for construction workspace management: A serious game engine approach", Proceedings of the 2012 ASCE International Conference on Computing in Civil Engineering, June.
|
13 |
Fisk, R.E. and Reynolds, W.D. (2013), Construction Projects Administration (10th Ed.), Pearson Education, London, United Kingdom.
|
14 |
Francis, A. (2013), "The chronographical approach for construction project modelling", Proceedings of the Institution of Civil Engineers-Management, Procurement and Law, 166(4), 188-204.
DOI
|
15 |
Francis, A. (2017), "Simulating uncertainties in construction projects with chronographical scheduling logic", J. Construct. Eng. Manag., 143(1), 1-14.
DOI
|
16 |
Francis, A. and Miresco, E.T. (2000), "Decision support for project management using a chronographic approach", Proceedings of the 2nd International Conference on Decision Making in Urban and Civil Engineering, Lyon, France, November.
|
17 |
Francis, A. and Miresco, E.T. (2002), "Decision support for project management using a chronographic approach", J. Decision Syst., 11(3-4), 383-404.
DOI
|
18 |
Francis, A. and Miresco, E.T. (2006), "A chronographic method for construction project planning", Canadian J. Civil Eng., 33(12), 1547-1557
DOI
|
19 |
Francis, A., Bibai, J. and Miresco, E.T. (2013), "Simulation of scheduling logic using dynamic functions", Proceedings of the Institution of Civil Engineers-Management, Procurement and Law, 166(3), 145-158.
DOI
|
20 |
Francis, A., Le Meur, E. and Miresco, E. (2018), "Space planning of material flow for building projects: The Chronographical modelling concept", Proceedings of the 17th International Conference on Computing in Civil and Building Engineering, ISCCBE, Tampere, Finland, July.
|
21 |
Frandson, A. and Tommelein, I.D. (2014), "Development of a Takt-time plan: A case study", Proceedings of the Construction Research Congress, Atlanta, GA, May.
|
22 |
Horman, M.J. and Thomas, H.R. (2005), "Role of inventory buffers in construction labor performance", J. Construct. Eng. Manag., 131(7), 834.
DOI
|
23 |
Keim, D.A. (2002), "Information visualization and visual data mining", IEEE Transactions on Visualization and Computer Graphics, 7(1), 100-107.
|
24 |
Ng, S.T., Shi, J. and Fang, Y. (2009), "Enhancing the logistics of construction materials through activity-based simulation approach", Eng., Construct. Architect. Manag., 16(3), 224-237.
DOI
|
25 |
Ning, X., Lam, K. and Lam. M.C. (2010), "Dynamic construction site layout planning using max-min ant system", Automat. Construct., 19(1), 55-65.
DOI
|
26 |
Pheng, L.S. and Chuan. C.J. (2001), "Just-in-time management of precast concrete components", J. Construct. Eng. Manag., 127(6), 494-501.
DOI
|
27 |
Riley, D.R. and Sanvido, V.E. (1995), "Patterns of construction-space use in multistory buildings", J. Construct. Eng. Manag., 121(4), 464-473.
DOI
|
28 |
Riley, D.R. and Sanvido, V.E. (1997), "Space planning method for multistory building construction", J. Construct. Eng. Manag., 123(2), 171-180.
DOI
|
29 |
Rischmoller, L., Fisher, M., Fox, R. and Alarcon, L. (2001), "4D planning and scheduling (4D-PS): Grounding construction IT research in industry practice, construction information technology", Proceedings of CIB W78 International Conference-IT in Construction in Africa, Mpumalanga, South Africa, May.
|