Browse > Article

A Study of the Optimal Procurement to Determine the Quantities of Spare Parts Under the Budget Constraint  

Lee, Sang-Jin (국방대학교 국방관리학과)
Kim, Seung-Chul (육군대학)
Hwang, Ji-Hyun (육군대학)
Publication Information
Korean Management Science Review / v.27, no.2, 2010 , pp. 31-44 More about this Journal
Abstract
It is very important to forecast demand and determine the optimal procurement quantities of spare parts. The Army has been forecasting demand not with actual usage of spare parts but with request quantities. However, the Army could not purchase all of forecasted demand quantities due to budget limit. Thus, the procurement quantities depend on the item managers' intuition and their meetings. The system currently used contains many problems. This study suggests a new determination procedure; 1) forecasting demand method based on actual usage, 2) determining procurement method through LP model with budge and other constraints. The newly determined quantities of spare parts is verified in the simulation model, that represents the real operational and maintenance situation to measure the operational availability. The result shows that the new forecasting method with actual usage improves the operational availability. Also, the procurement determination with LP improves the operational availability as well.
Keywords
Forecasting; Optimal Procurement; LP; Simulation; Operational Availability;
Citations & Related Records
Times Cited By KSCI : 4  (Citation Analysis)
연도 인용수 순위
1 류연욱, 박명섭, "CSP 품목 특성을 고려한 다단계 재고모형의 적용", 한국국방경영분석학회지, 제32권, 제1호(2006), pp.113-132.   과학기술학회마을
2 박영진, 전건욱, "ARIMA를 이용한 항공기 수리부속의 예측", 한국국방경영분석학회지, 제34권, 제2호(2008), pp.79-101.   과학기술학회마을
3 오근태, 차상원, "자금제약하에서 소모성 동시 조달품의 최적구매량 결정", 산업경영시스템학회지, 제69집(2001), pp.1-12.
4 최수동, 군수회전기금 도입방안, 서울:한국국방연구원, 2008.
5 하형호, 강성진, "군용 기동장비의 가용도 분석을 통한 교체시기 결정에 관한 연구", 한국국방경영분석학회지, 제29권, 제2호(2003), pp.81-99.   과학기술학회마을
6 Kelton, W.D., R.P. Sadowski, and D.T. Sturrock, SIMULATION WITH ARENA, Mc- Graw-Hill, 2007.
7 O'Malley, T.J., The Aircraft Availability Model: Conceptual Framework and Mathematics, Technical Report AF201, Logistics Management Institute, Washington, D.C., 1983.
8 Sherbrooke, C.C., "METRIC:A Multi-echelon Technique for Recoverable Item Control," Operations Research, Vol.16, No.1(1968), pp.122-141.   DOI   ScienceOn
9 Slay, F.M., VARI-METRIC, An Approach to Modeling Multi-Echelon Resupply when the Demand Process is Poisson with Gamma Prior, Technical Report AF301-3, Logistics Management Institute, Washington, D. C., 1984.
10 Slay, F.M. et al. Optimizing Spares Support: The Aircraft Sustainability Model, Technical Report AF501MR1, Logistics Management Institute, Washington, D.C., 1996.
11 길계호, 김충영, "목표계획법을 이용한 사단급 ASL 선정모형에 관한 연구", 한국경영과학회지, 제2권(1998), pp.75-78.
12 김영호, 정일교, 전치혁, "예산제약하에서 동시조달수리부속의 적정소요 산출", 대한산업공학회지, 제14권, 제3호(2001), pp.286-295.
13 육군본부, 소요관리, 대전:육군본부, 2002.
14 김희철, 최석철, "K-1전차 수리부속 최적소요 산정에 관한 연구", 한국국방경영분석학회지, 제26권, 제2호(2000), pp.39-54.
15 김선하, 강성진, "목표계획법을 이용한 방어 제공 임무의 항공기 최적할당에 관한 연구", 한국국방경영분석학회지, 제28권, 제2호(2002), pp.20-33.   과학기술학회마을