• Title/Summary/Keyword: Off-Site-Construction

Search Result 125, Processing Time 0.022 seconds

Development of an Application to Generate 2D Drawings in Automation using Open BIM Technologies (개방형BIM기반 2D도면 자동 생성 프로그램 개발에 관한 연구)

  • Kim, Inhan;Lee, Minjae;Choi, Jungsik;Kim, Gutaek
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.4
    • /
    • pp.417-425
    • /
    • 2016
  • Especially for resolving BIM data compatibility issue, as one of recently raised BIM technology issues, has also been improved by using open BIM, representatively using IFC (Industry Foundation Classes) format. As shown in many case studies, usefulness of BIM technology is increasing day by day, and the IFC-based open BIM technology is essential in recent AEC projects where the productive collaboration is of importance. One of current problems in actual projects is that there is a conflict between conventional ways and newly developed BIM ways. Using both conventional and new technologies leads construction workers to having more work loads, consequently the efficiency and productivity of on-site workers have been decreased. Thus, it is strongly necessary to facilitate 3D BIM models to extract and generate 2D precision drawings in automation, especially using open BIM technologies. Some native BIM authoring tools have limitations in there automatic generation of 2D drawings, and there is no standardized mechanism to generate 2D drawings from heterogeneous applications. For this reason, this paper aims to develop an automated stand-alone program to generate 2D drawings in automation using IFC file, totally independent from various BIM authoring tools. By using the application described in this paper, any type of general drawings such as plan, section and elevation can be extracted without additional efforts. The development approach described in this paper, based on the open BIM technologies, has a strong impact to the current process especially in the perspective of enhancing productivity when we need to find out a trade-off in-between conventional and new approaches.

ZigBee Wireless Sensor Nodes and Network For Wind Turbine Condition Monitoring (풍력발전기 상태 모니터링을 위한 ZigBee 무선 센서노드 및 네트워크)

  • Kim, Hyeon-Ho;Ahn, Sung-Bum;Choi, Sang-Jin;Pan, Jae-Kyung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.9
    • /
    • pp.4186-4192
    • /
    • 2012
  • Because wind turbines are larger and more off-shore construction due to economic and environmental factors, it is more difficult to access the wind turbine as well as the necessary parts and the maintenance costs are increasing. So, we need to minimize fault elements and to prevent a secondary accident at failure through monitoring to reduce maintenance costs and to increase reliability of operation. In this paper we have implemented ZigBee based wireless sensor nodes and network for wind turbine condition monitoring using temperature, humidity, voltage, current, wind direction, and wind speed sensors. ZigBee wireless sensor nodes signals are transmitted to a central monitoring system via routers. Also, the sensor signals are collected and processed using LabVIEW program to monitor the wind turbine conveniently. The administrators and users can monitor the condition of wind turbine at remote site in real time over TCP/IP.

A Decade's Experiences on the Hydrofracturing In-Situ Stress Measurement for Tunnel Construction in Korea (암반터널 설계를 위한 수압파쇄 초기지압 측정의 10여년 간의 경험)

  • Choe, Seong-Ung;Park, Chan;Sin, Jung-Ho;Sin, Hui-Sun
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2008.03a
    • /
    • pp.79-88
    • /
    • 2008
  • Since the hydraulic fracturing field testing method was introduced first to Korean geotechnical engineers in 1994, there have been lots of progresses in a hardware system as well as an interpretation tool. The hydrofracturing system of first generation was the pipe-line type, so it was not easy to handle. It had been modified to a wire-line system at their second generation. It was more compact one but it also needed an additional air-compressor. Our current system is much more compact and operated by all-in-one system, so it doesn't need an additional air-compressor. With a progress in a hardware system, the software for analyzing the in-situ stress regime has also been progressed. For example, the shut-in pressure, which is the most ambiguous parameter to be obtained from hydrofracturing pressure curves, can now be acquired automatically from the various methods. While the hardware and software for hydrofracturing tests are being developed during the last decade, the author could accumulate the field test results which can cover the almost whole area of South Korea. Currently these field data are used widely in a feasibility study or a preliminary design step for tunnel construction in Korea. Regarding the difficulties in a site selection and a test performance for the in-situ stress measurement at an off-shore area, the in-situ stress regime obtained from the field experiences in the land area can be used indirectly for the design of a sub-sea tunnel. From the hydrofracturing stress measurements, the trend of magnitude and direction of in-situ stress field was shown identically with the geological information in Korea.

  • PDF

A Study on a Calculation Method of Economical Intake Water Depth in the Design of Head Works (취입모의 경제적 계획취입수심 산정방법에 대한 연구)

  • 김철기
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.20 no.1
    • /
    • pp.4592-4598
    • /
    • 1978
  • The purpose of this research is to find out mathemetically an economical intake water depth in the design of head works through the derivation of some formulas. For the performance of the purpose the following formulas were found out for the design intake water depth in each flow type of intake sluice, such as overflow type and orifice type. (1) The conditional equations of !he economical intake water depth in .case that weir body is placed on permeable soil layer ; (a) in the overflow type of intake sluice, {{{{ { zp}_{1 } { Lh}_{1 }+ { 1} over {2 } { Cp}_{3 }L(0.67 SQRT { q} -0.61) { ( { d}_{0 }+ { h}_{1 }+ { h}_{0 } )}^{- { 1} over {2 } }- { { { 3Q}_{1 } { p}_{5 } { h}_{1 } }^{- { 5} over {2 } } } over { { 2m}_{1 }(1-s) SQRT { 2gs} }+[ LEFT { b+ { 4C TIMES { 0.61}^{2 } } over {3(r-1) }+z( { d}_{0 }+ { h}_{0 } ) RIGHT } { p}_{1 }L+(1+ SQRT { 1+ { z}^{2 } } ) { p}_{2 }L+ { dcp}_{3 }L+ { nkp}_{5 }+( { 2z}_{0 }+m )(1-s) { L}_{d } { p}_{7 } ] =0}}}} (b) in the orifice type of intake sluice, {{{{ { zp}_{1 } { Lh}_{1 }+ { 1} over {2 } C { p}_{3 }L(0.67 SQRT { q} -0.61)}}}} {{{{ { ({d }_{0 }+ { h}_{1 }+ { h}_{0 } )}^{ - { 1} over {2 } }- { { 3Q}_{1 } { p}_{ 6} { { h}_{1 } }^{- { 5} over {2 } } } over { { 2m}_{ 2}m' SQRT { 2gs} }+[ LEFT { b+ { 4C TIMES { 0.61}^{2 } } over {3(r-1) }+z( { d}_{0 }+ { h}_{0 } ) RIGHT } { p}_{1 }L }}}} {{{{+(1+ SQRT { 1+ { z}^{2 } } ) { p}_{2 } L+dC { p}_{4 }L+(2 { z}_{0 }+m )(1-s) { L}_{d } { p}_{7 }]=0 }}}} where, z=outer slope of weir body (value of cotangent), h1=intake water depth (m), L=total length of weir (m), C=Bligh's creep ratio, q=flood discharge overflowing weir crest per unit length of weir (m3/sec/m), d0=average height to intake sill elevation in weir (m), h0=freeboard of weir (m), Q1=design irrigation requirements (m3/sec), m1=coefficient of head loss (0.9∼0.95) s=(h1-h2)/h1, h2=flow water depth outside intake sluice gate (m), b=width of weir crest (m), r=specific weight of weir materials, d=depth of cutting along seepage length under the weir (m), n=number of side contraction, k=coefficient of side contraction loss (0.02∼0.04), m2=coefficient of discharge (0.7∼0.9) m'=h0/h1, h0=open height of gate (m), p1 and p4=unit price of weir body and of excavation of weir site, respectively (won/㎥), p2 and p3=unit price of construction form and of revetment for protection of downstream riverbed, respectively (won/㎡), p5 and p6=average cost per unit width of intake sluice including cost of intake canal having the same one as width of the sluice in case of overflow type and orifice type respectively (won/m), zo : inner slope of section area in intake canal from its beginning point to its changing point to ordinary flow section, m: coefficient concerning the mean width of intak canal site,a : freeboard of intake canal. (2) The conditional equations of the economical intake water depth in case that weir body is built on the foundation of rock bed ; (a) in the overflow type of intake sluice, {{{{ { zp}_{1 } { Lh}_{1 }- { { { 3Q}_{1 } { p}_{5 } { h}_{1 } }^{- {5 } over {2 } } } over { { 2m}_{1 }(1-s) SQRT { 2gs} }+[ LEFT { b+z( { d}_{0 }+ { h}_{0 } )RIGHT } { p}_{1 }L+(1+ SQRT { 1+ { z}^{2 } } ) { p}_{2 }L+ { nkp}_{5 }}}}} {{{{+( { 2z}_{0 }+m )(1-s) { L}_{d } { p}_{7 } ]=0 }}}} (b) in the orifice type of intake sluice, {{{{ { zp}_{1 } { Lh}_{1 }- { { { 3Q}_{1 } { p}_{6 } { h}_{1 } }^{- {5 } over {2 } } } over { { 2m}_{2 }m' SQRT { 2gs} }+[ LEFT { b+z( { d}_{0 }+ { h}_{0 } )RIGHT } { p}_{1 }L+(1+ SQRT { 1+ { z}^{2 } } ) { p}_{2 }L}}}} {{{{+( { 2z}_{0 }+m )(1-s) { L}_{d } { p}_{7 } ]=0}}}} The construction cost of weir cut-off and revetment on outside slope of leeve, and the damages suffered from inundation in upstream area were not included in the process of deriving the above conditional equations, but it is true that magnitude of intake water depth influences somewhat on the cost and damages. Therefore, in applying the above equations the fact that should not be over looked is that the design value of intake water depth to be adopted should not be more largely determined than the value of h1 satisfying the above formulas.

  • PDF

An analysis of problems and countermeasures in the installation of plastic greenhouse on reclaimed lands (간척지에 플라스틱 온실 설치 시의 문제점 분석 및 개선방안)

  • Yu, In-Ho;Ku, Yang-Gyu;Cho, Myeong-Whan;Ryu, Hee-Ryong;Moon, Doo-Gyung
    • Korean Journal of Agricultural Science
    • /
    • v.41 no.4
    • /
    • pp.473-480
    • /
    • 2014
  • Upon setting up a dedicated plastic greenhouse for tomato cultivation developed by the Rural Development Administration on the Gyehwa reclaimed land, this study was aimed at analyzing the problems can be occurred in the installation of plastic greenhouse on reclaimed lands as well as finding out solutions for improvement. A relatively cheaper wooden pile was used in the installation in order to supplement the soft ground conditions. Based on the results of ground investigation of the installation site, both the allowable bearing capacity and pulling resistance of the wooden pile with a diameter of 150 mm and a length of 10 m were computed and came out to be 30.645 kN. It was determined that the values were enough to withstand the maximum compressive force (17.206 kN) and the pullout force (20.435 kN) that are generally applied to the greenhouse footing. There are three problems aroused in the process of greenhouse installation, and the corresponding countermeasures are as follow. First, due to the slightly bent shape of the wooden pile, there were phenomenon such as deviation, torsion, and fracture when driving the pile. This could be prevented by the use of the backhoe (0.2) rotating tongs, which are holding the pile, to drive the pile while pushing to the direction of the driving and fixing it until 5 m below ground and applying a soft vibrating pressure until the first 2 m. Second, there exists a concrete independent footing between the column of the greenhouse and the wooden pile driven to the underground water level. Since it is difficult to accurately drive the pile on this independent footing, the problem of footing baseplate used to fix the column being off the independent footing was occurred. In order to handle with this matter, the diameter of the independent footing was changed from 200 mm to 300 mm. Last, after films were covered in the condition that the reinforcing frame and bracing are not installed, there was a phenomenon of columns being pushed away by the strong wind to the maximum of $11m{\cdot}s^{-1}$. It is encouraged to avoid constructions in winter, and the film covering jobs always to be done after the frame construction is completely over. The height of the independent footing was measured for 9 months after the completion of the greenhouse installation, and it was found to be within the margin of error meaning that there was no subsidence. The extent to the framework distortion and the value of inclinometers as well showed not much alteration. In other words, the wooden pile was designed to have a sufficient bearing capacity.

A Study on Planning of Bird Habitat Preparation for Eco-friendly Development - Focusing on Ganseo Area in Busan - (조류 서식지 보전을 위한 친환경적 계획 방안 연구 - 부산 강서지구를 중심으로 -)

  • Park, Yong-Su;Han, Donguk;Kim, Nam-Shin;Cho, Dong-Gil;Shim, Yun-Jin;Cha, Jin-Yeol
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.18 no.6
    • /
    • pp.151-165
    • /
    • 2015
  • This study surveys and analyzes the ecology of Gangseo area to be developed near Nakdonggang River and West Nakdonggang River in Busan - before its development. With the result of the surveys as its basis, the study also finds ways to conserve the area's bird habitats in response to the planned development. According to the site surveys over four seasons, West Nakdonggang River which is near the targeted development area is a wintering ground for migratory birds. Some representative bird types in this area are ducks, geese, and other water birds. There are even six legally protected species. The average altitude of their flight is calculated to be $92.4{\pm}18.8m$ and the main purpose for the migration is determined to be for food. According to evalution of the conservation value of the area, Nakdonggang River and West Nakdonggang River turns out to have the highest conservation value. Other areas are developable as long as it was environmentally friendly. Therefore, this study suggests incorporation of ecological parks and biotopes within the targeted development area along with the proposal for spaces in the surroundings where the wintering birds can rest and feed. Especially for the wintering birds that rest at Nakdonggang River and West Nakdonggang River, their flight direction and pattern was examined to determine that their resting ground should be located 50~100m off of the river bank. Furthermore, this study proposes ways to maximize bird habitat by building ecological corridors between the agricultural channel and other small streams in the targeted development area and the habitats in the surroundings. Lastly, the study suggests the construction of low buildings, at most 20m in height, near Nakdonggang River and West Nakdonggang River considering the birds' flight altitude and direction.

Study on the Performance Evaluation of Colored Asphalt Hot Mixtures through the Usage of Grain-typed Color Additive (알갱이 형태의 유색첨가제를 이용한 칼라 아스팔트 혼합물의 공용성 평가 연구)

  • Lee, Sang-Yum;Ahn, Yong-Ju;Mun, Sung-Ho;Kim, Yeong-Min
    • International Journal of Highway Engineering
    • /
    • v.13 no.4
    • /
    • pp.117-122
    • /
    • 2011
  • Asphalt concrete pavement can be widely seen on urban streets, highways, parking lots, and bike trails. Asphalt concrete pavement is relatively temperature sensitive materials due to the viscoelastic behavior, which can be defined as flexible performance in summer and rigid performance in winter. In terms of maintenance, it can be fixed quite easily if damaged. In addition, asphalt concrete pavement is generally found to be black and grey in color. However, several colors can be adopted to change the appearance of plain old boring, black and grey. Generally, there are two types of color systems in hot mix asphalt concrete materials. One system uses colored cementitious material that is applied to pavement surface through coating the surface of the asphalt pavement. The major disadvantage to this system requires a careful skill set to be used on the construction site in order to prevent taking off the cementitious material. The other coloring system colors the asphalt hot mixtures through using color additives. The main advantage to this system is that the asphalt pavement layer is colored using the same techniques that are already used in paving. The disadvantage is that the colors are limited to mainly reds and browns. In this study, a suggested color additive was evaluated, based on rutting, moisture sensitivity, and fatigue cracking performance.

Establishment of Rebar Quantity Estimation in BIM-based Initial Design Phase (BIM기반 초기 설계 단계 철근 물량 산출 프로세스 구축)

  • Song, Chi-Ho;Kim, Chee-Kyeong;Lee, Si Eun;Choi, Hyunchul
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.29 no.5
    • /
    • pp.447-454
    • /
    • 2016
  • In the meantime, looking at the present status of how to estimationte the quantity of rebar based on 3D BIM getting the limelight in these days, commercial BIM tools provide rebar modeling functions however it takes a vast amount of modeling time for modeling of rebar in use of that function hence there is no BIM software at present for practical use. Therefore, in this study, we organized and presented a practical rebar quantity estimationtion process in BIM-based design work-site and intended to develop a program named Rebar Automatic Arrangement Program - hereinafter called RAAP - which enables automatic rebar arrangement based on much more precise cross-sectional information of bars in column, beam, slab and wall than the one from existing 2D method under the conditions without any cross-sectional information in the initial design phase. In addition, we intended to establish rebar quantity estimationtion process in the initial design phase through interworking of modeling & quantity estimationtion functions in consideration of joint, anchoring length of BuilderHUB as a BIM software with RAAP. The results from this study are practical in developing a technology that is able to estimationte quantity with more improved reliability than the one from existing 2D-based methods with less effort when the quantity of framework is estimationted in the uncompleted state of cross-sectional design for structural members in the initial design phase of a construction project. And it is expected that it could be utilized as a basic study from which a reasonable quantity estimationtion program can be established in the initial design phase.

Numerical Simulation on Control of Tsunami by Resonator (I) (for Imwon and Mukho ports) (공진장치에 의한 지진해일파의 제어에 관한 수치시뮬레이션(I) (임원항과 묵호항에 대해))

  • Lee, Kwang-Ho;Jeon, Jong-Hyeok;Kim, Do-Sam;Lee, Yun-Du
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.32 no.6
    • /
    • pp.481-495
    • /
    • 2020
  • After the resonator on the basis of the wave-filter theory was designed to control the waves with a specific frequency range surging into the harbor, the several case with the use of resonator have been reported in some part of sea, including the port of Long Beach, USA, and yacht harbor at Rome, Italy in order to control the long-period wave motion from the vessels. Recently, the utility and applicability of the resonator has been sufficiently verified in respect of the control of tsunami approximated as the solitary wave and/or the super long-period waves. However, the case with the application of tsunami in the real sea have not been reported yet. In this research, the respective case with the use of existing resonator at the port of Mukho and Imwon located in the eastern coast of South Korea were studied by using the numerical analysis through the COMCOT model adapting the reduction rate of 1983 Central East Sea tsunami and 1993 Hokkaido Southwest off tsunami. Consequently, the effectiveness of resonator against tsunami in the real sea was confirmed through the reduction rate of maximum 40~50% at the port of Mukho, and maximum 21% at the port of Imwom, respectively. In addition, it was concluded that it is necessary to study about the various case with application of different shape, arrangement, and size of resonator in order to design the optimal resonator considering the site condition.

Numerical Simulation on Control of Tsunami by Resonator (II) (for Samcheok port) (공진장치에 의한 지진해일파의 제어에 관한 수치시뮬레이션(II) (삼척항에 대해))

  • Lee, Kwang-Ho;Jeon, Jong-Hyeok;Kim, Do-Sam;Lee, Yun-Du
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.32 no.6
    • /
    • pp.496-505
    • /
    • 2020
  • In the previous research, the effectiveness of resonator was confirmed through the numerical analysis on two cases with the use of existing resonator at the Mukho and Imwon ports located in the eastern coast of South Korea by discussing the reduction rates of 1983 Central East Sea tsunami, and 1993 Hokkaido Southwest off tsunami, respectively. In this study, the reduction rates of tsunami height with three different resonators, Type I, II-1, and II-2, at the Samcheok port were examined respectively through the numerical analysis using COMCOT model under the same condition as the previous study. It was discussed the spatial distribution of maximum height of tsunami, change of water level, and effectiveness of resonator with the presence of new types of resonator, and change of their sizes. As a result, the effectiveness of resonator was verified through the application of new types of resonator reducing about maximum 40% of tsunami height. In order to design the optimal resonator for the variety of site condition, it is necessary to research about the various cases applying different shape, arrangement, and size of resonator as further study.