Better Management (Risk and Change) through NEC Contracts in Hong Kong

  • TUNG, Chu Hoi;MEMON, Shoeb Ahmed;JAVED, Arshad Ali
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.323-330
    • /
    • 2020
  • Project delays, cost overruns, and disputes are becoming a norm for the construction industry in Hong Kong. Researchers argue that the inability of traditional contracts to manage risk and associated changes are perhaps the main points of contention. The Institution of Civil Engineers published a new engineering contract (NEC), NEC4 Suite of Contracts in this to facilitate better risk management through collaborative culture in construction projects. NEC aims to increase the chances of project success thought its flexible nature of contracts, 'simple' and 'clearly written' documents and provision for the incentive by adopting a better management approach. This paper focuses on traditional and NEC contracts to compare risk management and change management aspects. Through literature review and preliminary interviews with three industry professionals, the paper is exploring how a change in traditional contracts can recuperate from disaster. Our interviewees in this work have extensive experience in traditional as well as in NEC contracts. The results suggest a proactive risk management provisions in NEC contracts does make a difference to avoid later escalation of issues. Whereas, management of change helps streamline all identified issues through a structured process without going in mediation or litigation. NEC, with its new approach to collaborative working, allows partners to be vigilant, yet gratifying in the project process.

  • PDF

이더리움 스마트 계약 프로그램의 ERC-20 API 기능 명세의 관례상 표준과 적합성 리뷰 방법 (A De Facto Standard for ERC-20 API Functional Specifications and Its Conformance Review Method for Ethereum Smart Contracts)

  • 문현아;박수용
    • 정보처리학회논문지:소프트웨어 및 데이터공학
    • /
    • 제11권10호
    • /
    • pp.399-408
    • /
    • 2022
  • 이더리움 토큰 스마트 계약의 표준 API인 ERC-20은 지갑이나 분산 거래소같은 응용 프로그램들에서 호환성을 보장하기 위해 도입되었다. 그러나 API의 동작에 대한 엄밀한 기능 명세와 표준 적합성 리뷰 도구는 지원되고 있지 않아 호환성 취약점 문제가 발생할 수 있다. 본 논문에서는 이더리움 블록체인의 ERC-20 토큰 스마트 계약 프로그램들의 관례상 표준에 부합하는지 검사하는 새로운 리뷰 절차와 이를 지원하는 도구를 제안하였다. 기존 이더리움 블록체인 시장 상위 100개의 토큰 스마트 계약 프로그램들을 ERC-20 API 기능 동작면에서 분석한 지식을 바탕으로 관례상 표준을 명시적으로 정의하였고, 이렇게 정의된 관례상 표준으로 새로운 ERC-20 스마트 계약 프로그램을 체계적으로 리뷰할 수 있는 방법을 설계할 수 있었다. 이 리뷰 방법을 지원하는 도구를 개발하고 벤치마크 프로그램에 대해 실험 평가하였다.

Secure SLA Management Using Smart Contracts for SDN-Enabled WSN

  • Emre Karakoc;Celal Ceken
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제17권11호
    • /
    • pp.3003-3029
    • /
    • 2023
  • The rapid evolution of the IoT has paved the way for new opportunities in smart city domains, including e-health, smart homes, and precision agriculture. However, this proliferation of services demands effective SLAs between customers and service providers, especially for critical services. Difficulties arise in maintaining the integrity of such agreements, especially in vulnerable wireless environments. This study proposes a novel SLA management model that uses an SDN-Enabled WSN consisting of wireless nodes to interact with smart contracts in a straightforward manner. The proposed model ensures the persistence of network metrics and SLA provisions through smart contracts, eliminating the need for intermediaries to audit payment and compensation procedures. The reliability and verifiability of the data prevents doubts from the contracting parties. To meet the high-performance requirements of the blockchain in the proposed model, low-cost algorithms have been developed for implementing blockchain technology in wireless sensor networks with low-energy and low-capacity nodes. Furthermore, a cryptographic signature control code is generated by wireless nodes using the in-memory private key and the dynamic random key from the smart contract at runtime to prevent tampering with data transmitted over the network. This control code enables the verification of end-to-end data signatures. The efficient generation of dynamic keys at runtime is ensured by the flexible and high-performance infrastructure of the SDN architecture.

건설경기 침체기의 최저가 낙찰제 건설현장의 운영 실태분석과 개선 방안 도출 (Evaluation on the impact of Lowest Bid Contracts on Site Operations in times of Severe Economic Downturn)

  • 구본상;장현승
    • 한국건설관리학회논문집
    • /
    • 제10권6호
    • /
    • pp.146-153
    • /
    • 2009
  • 2008년에는 국내 부동산 경기 침체로 인해 국내 건설 경기가 급속도로 악화되었으며, 국제 유가인상과 함께 철근, 레미콘 등 건설 주요 자재의 가격이 폭등하였다. 또한 새로 출범한 정부는 '예산 10% 절감' 방안을 내세우며 그 일환으로 최저가 낙찰제 공사를 기존 300억원에서 100억원으로 확대 시행할 것으로 발표하였다. 이처럼 정책적 경제적 악재가 겹치면 가장 큰 타격을 받는 것은 대부분 수익성 없이 저가로 수주한 최저가 낙찰제 현장이다. 평상시에도 적자로 운영되는 현장에서 이런 대외적 타격을 받을 경우, 기존에 안고 있던 문제점들이 극대화되기 때문이다. 이에 본 연구에서는 2008년 국내 최저가 낙찰제 현장의 운영 실태를 파악하고 발견된 문제점들에 대한 원인 분석 및 이에 따른 개선방안을 도출하였다. 조사 결과 발주자-원도급자-하도급자간의 자금 유동성의 문제가 가장 큰 것으로 드러났으며 그 원인에는 설계변경 및 에스컬레이션 제도의 미작동 및 리스크를 중소 및 영세기업에게 전가시키는 생산구조에 있는 것으로 파악되었다. 이에 따라 원도급자들은 경기 사이클에 대비할 수 있는 리스크관리 능력을 향상시키고, 발주자들은 경기 침체 시 현장에 유동성을 확보해 줄 수 있는 장치를 마련해 주는 것이 중요한 것으로 파악되었다.

송전혼잡하에서 한계비용 민감도를 이용한 새로운 계통 분할 기법 (A New Network Partition Technique using Marginal Cost Sensitivity Under Transmission Congestion)

  • 장시진;정해성;박종근
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 추계학술대회 논문집 학회본부 A
    • /
    • pp.223-225
    • /
    • 2000
  • Network congestion is important problem that must be managed for active power contracts in deregulated power industry. Existing network partition technique is based on statistical method don't suggest clear network partition criterion. So in this paper we proposed a new network partition technique using the marginal cost sensitivity to fairly allocate congestion cost to network user.

  • PDF

Steel Plant Construction (EPC) Project Case Study : Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation

  • Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.145-150
    • /
    • 2013
  • As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.

  • PDF

장기계속계약제도 하에서 고속도로공사 최적공사비 산출방안 정립에 관한 연구 (Formal Estimation Method for Optimal Budget Appropriation of Highway Construction Projects under Long-term Continuation Contracts)

  • 구본상;유정호;박종호
    • 대한토목학회논문집
    • /
    • 제35권6호
    • /
    • pp.1405-1412
    • /
    • 2015
  • 한국의 공공인프라 프로젝트는 다년간 전 생애에 걸쳐 매년 재평가하고 예산을 재 할당하는 장기 지속 계약(LTC) 형식으로 진행된다. 그러나 이러한 계약은 기존 프로젝트에 필요한 예산이 새로운 프로젝트에 할당되기 때문에 다년간의 프로젝트에 일관된 예산의 흐름을 제공하지 않는다. 한국도로공사는 실제로 한국도로공사에 할당될 수 있는 금액을 예측하기 힘들기 때문에 여러 고속도로 건설 현장의 건설을 위한 정부 기금을 매년 요구해야 한다. 하지만 그것을 예측하여 원활하고 지속적으로 실행에 필요한 충분한 자금을 제공하는 것은 어렵다. 예산 분배에 대한 논리적인 접근의 부족은 자본의 왜곡된 분포를 갖는 결과를 가져왔다. 정부로부터 최적의 예산을 얻기 위해서 한국도로공사는 개별 공구에 필요한 연간 건설 자본을 합리화 하고 체계화한 접근방식을 필요로 한다. 또한, 충분한 자금이 특정 연도에 구비되는 경우, 소정의 공구에 필요한 최소한의 건설 자본을 평가하는 방법을 개발할 필요가 있다. 본 연구의 목표는 한국도로공사가 매년 개별 건설 현장에 필요한 최소한과 최적의 건설비용을 계산할 수 있는 방법을 고안하는 것이다. 최적의 연차별 공종별 계획공정율과 핵심작업의 유형 모두 많은 도로공사의 프로젝트들을 경험하고 현재 그 프로젝트들을 진행 중인 24명의 전문가(한국도로공사 직원, 시공전문가)들의 워크숍을 통해 산정되었다.

도로 수탁공사의 효과적 수행을 위한 방법론 (A Method for the Effective Implementation of a Consignment Contract in Road Constructions)

  • 박권준;김성근
    • 대한토목학회논문집
    • /
    • 제30권2D호
    • /
    • pp.153-161
    • /
    • 2010
  • 지방정부의 도시계획은 지속적인 프로세스로 계획의 수립과 함께 끝나는 것이 아니고 의사결정, 검토와 평가단계를 거쳐서 지속적으로 바뀌는 것이다. 도시계획이 바뀌고 확정됨에 따라서 대규모의 도로를 기존에 수행되고 있던 도로와 연계하여 공사를 수행하게 되는 경우도 발생하게 된다. 이러한 경우에 기시공된 도로의 폭과 길의 확장, 추가적인 교량 및 터널의 건설, 그리고 인터체인지의 크기와 위치의 변경 등과 같은 요인들에 의하여 도로설계 및 시공에 많은 변화를 가져오게 된다. 과거에는 제한된 수와 제한된 공종에 한하여 도로 수탁공사가 수행되어 왔으나, 현재는 수행되는 수탁공사의 수도 증가하고 있으며, 대규모 복합공종을 위한 수탁공사가 이루어지고 있다. 그러나 수탁공사 수행을 위한 절차나 수탁공사 계약을 위한 가이드라인이 마련되어 있지 않다. 따라서 효과적인 도로 수탁공사를 수행하는데 어려움이 있다. 본 논문에서는 공사관련 서류들과 전문들의 면담을 통하여 수탁공사 수행을 위한 중요 고려요소를 파악하였고, 이 결과에 근거하여 수탁공사의 표준절차(안)과 수탁공사비 협의를 위한 가이드라인을 제시하였다. 또한 위탁기관이 부담해야 하는 비용에 관한 내용을 제시하였다.

모듈러 건축물의 특성을 반영한 공공발주 방식의 개발 (Development of Project Delivery System in Public Sector for Modular Building)

  • 남성훈;김경래
    • 한국건설관리학회논문집
    • /
    • 제17권4호
    • /
    • pp.49-56
    • /
    • 2016
  • 최근 모듈러 건축물 관련 연구가 활발하게 진행되고 있으나, 실제 건설산업에서 모듈러 건축물을 활용한 건축공사의 발주는 아직 활성화되지 못하고 있다. 이에 대한 여러 가지 원인들이 분석되고 있으나 그 중 중요한 것은 모듈러 건축물은 기존 현장중심의 건설생산체계를 공장제작-운송-현장설치 새로운 체계로의 전환을 요구하고 있다는 것이다. 하지만 국내 공공공사의 기존 발주방식은 전기통신공사업 등 개별법에서 분리발주를 의무화하고 있기 때문에 모듈러 건축물 장점을 살릴 수 있는 새로운 건설생산체계를 수용하기 어렵다. 따라서 기존 발주방식은 모듈러 건축물을 현장중심의 공사로 분리발주(건축 토목, 전기, 통신, 소방 등) 계약할 수밖에 없고, 건축 토목공사의 계약 범위 안에서 모듈러 유닛을 물품으로 구매할 수밖에 없기 때문에 이러한 분리발주로 인한 모듈러 건축물의 공장제작 비율을 저하시키고 공사비 상승, 품질저하 등의 문제를 발생시켜서 모듈러 건축물의 장점을 발휘하지 못하도록 하는 장애요인이 된다. 본 논문에서는 모듈러 건축물에서 요구하는 새로운 건설생산체계를 적극적으로 수용할 수 있는 새로운 발주방식을 개발하여 제안하고자 한다.

H-beam 절단용 다관절 로봇의 절단작업영역 설정에 관한 연구 (A Study on the Determination of Cutting Work Envelope of Articular Robot for H-beam Cutting)

  • 박주용;이용구
    • Journal of Welding and Joining
    • /
    • 제27권6호
    • /
    • pp.55-61
    • /
    • 2009
  • This study aims for determination of cutting work envelope of an articular robot for H-beam cutting. The robot has its own work envelope. The cutting of piece with groove requires the specific position of the torch which contracts the work envelope. This study suggested the new method to determine the cutting work envelope for this case. The method simplified the problem by use of the combination of inverse kinematics and forward kinematics. The method was used for cutting the H-beam with groove. The cutting work envelope was determined easily. The result was verified by 3D simulation system which implements the articular robot with 6 axes and the H-beam in the virtual shop.