• 제목/요약/키워드: Multiple Objective Scheduling

검색결과 68건 처리시간 0.024초

다수의 경쟁이 존재하는 환경에서 적시 스케줄링에 관한 연구 (Just-in-time Scheduling with Multiple Competing Agents)

  • 정대영;최병천
    • 한국경영과학회지
    • /
    • 제37권1호
    • /
    • pp.19-28
    • /
    • 2012
  • We consider a multi-agent scheduling problem such that each agent tries to maximize the weighted number of just-in-time jobs. Two objectives are considered : the first is to find the optimal solution for one agent with constraints on the other agents' weight functions, and the second is to find the largest set of efficient schedules of which corresponding objective vectors are different for the case with identical weights. We show that when the number of agents is fixed, the single machine case with the first objective is NP-hard in the ordinary sense, and present the polynomial- time algorithm for the two-machine flow shop case with the second objective and identical weights.

A Multi-Objective Differential Evolution for Just-In-Time Door Assignment and Truck Scheduling in Multi-door Cross Docking Problems

  • Wisittipanich, Warisa;Hengmeechai, Piya
    • Industrial Engineering and Management Systems
    • /
    • 제14권3호
    • /
    • pp.299-311
    • /
    • 2015
  • Nowadays, the distribution centres aim to reduce costs by reducing inventory and timely shipment. Cross docking is a logistics strategy in which products delivered to a distribution centre by inbound trucks are directly unloaded and transferred to outbound trucks with minimum warehouse storage. Moreover, on-time delivery in a distribution network becomes very crucial especially when several distribution centres and customers are involved. Therefore, an efficient truck scheduling is needed to synchronize the delivery throughout the network in order to satisfy all stake-holders. This paper presents a mathematical model of a mixed integer programming for door assignment and truck scheduling in a multiple inbound and outbound doors cross docking problem according to Just-In-Time concept. The objective is to find the schedule of transhipment operations to simultaneously minimize the total earliness and total tardiness of trucks. Then, a multi-objective differential evolution (MODE) is proposed with an encoding scheme and four decoding strategies, called ITSH, ITDD, OTSH and OTDD, to find a Pareto frontier for the multi-door cross docking problems. The performances of MODE are evaluated using 15 generated instances. The numerical experiments demonstrate that the proposed algorithm is capable of finding a set of diverse and high quality non-dominated solutions.

다기능 레이더의 임무 스케줄링 및 복수 운용 개념 분석 (Task Scheduling and Multiple Operation Analysis of Multi-Function Radars)

  • 정순조;장대성;최한림;양재훈
    • 한국항공우주학회지
    • /
    • 제42권3호
    • /
    • pp.254-262
    • /
    • 2014
  • 레이더 임무 스케줄링은 제한된 자원 환경에서 레이더의 성능을 향상시키기 위해 효과적으로 임무 배치를 하는 것이다. 본 논문에서는 다기능 레이더의 복수 운용 시의 스케줄링 성능 평가를 위해 총 지연 시간의 합을 목적함수로 정의하고, 실시간성을 고려한 휴리스틱 접근법을 제시한다. 제안된 스케줄링 기법들을 일반적인 임무 시뮬레이션 환경에서 비교 분석하였으며, 특히, 다기능 레이더의 복수 운용에서의 스케줄링 성능을 분석한다.

총 납기지연시간 최소화를 위한 두 단계 조립시스템에서의 일정계획에 관한 연구 (A Scheduling Problem to Minimize Total Tardiness in the Two-stage Assembly-type Flowshop)

  • 하귀룡;이익선;윤상흠
    • 한국경영과학회지
    • /
    • 제33권3호
    • /
    • pp.1-16
    • /
    • 2008
  • This paper considers a scheduling problem to minimize the total tardiness in the two-stage assembly-type flowshop. The system is composed of multiple fabrication machines in the first stage and a final-assembly machine in the second stage. Each job consists of multiple tasks, each task is performed on the fabrication machine specified in advance. After all the tasks of a job are finished, the assembly task can be started on the final-assembly machine. The completion time of a job is the time that the assembly task for the job is completed. The objective of this paper is to find the optimal schedule minimizing the total tardiness of a group of jobs. In the problem analysis, we first derive three solution properties to determine the sequence between two consecutive jobs. Moreover, two lower objective bounds are derived and tested along with the derived properties within a branch-and-bound scheme. Two efficient heuristic algorithms are also developed. The overall performances of the proposed properties, branch-and-bound and heuristic algorithms are evaluated through numerical experiments.

Customer Order Scheduling in a Two Machine Flowshop

  • Yang, Jae-Hwan
    • Management Science and Financial Engineering
    • /
    • 제17권1호
    • /
    • pp.95-116
    • /
    • 2011
  • This paper considers a flowshop scheduling problem where a customer orders multiple products (jobs) from a production facility. The objectives are to minimize makespan and to minimize the sum of order (batch) completion times. The order cannot be shipped unless all the products in the order are manufactured. This problem was motivated by numerous real world problems encountered by a variety of manufacturers. For the makespan objective, we develop an optimal solution procedure which runs in polynomial time. For the sum of order completion time objective, we establish the complexity of the problem including several special cases. Then, we introduce a simple heuristic and find an asymptotically tight worst case bound on relative error. Finally, we conclude the paper with some implications.

다중기계로 구성되는 조립전단계에서의 부품생산 일정계획 (Scheduling on the Pre-assembly Stage of Multiple Fabrication Machines)

  • 윤상흠
    • 산업경영시스템학회지
    • /
    • 제26권4호
    • /
    • pp.63-71
    • /
    • 2003
  • This paper analyses a deterministic scheduling problem concerned with manufacturing multiple types of components at a pre-assembly stage composed of parallel fabrication machines. Each component part is machined on a fabrication machine specified in advance. The manufactured components are subsequently assembled into products. The completion time of a job(product) is measured by the latest completion time of its all components at the pre-assembly stage. The problem has the objective measure of minimizing the total weighted completion time of a finite number of jobs. Two lower bounds are derived and tested in a branch-and-bound scheme. Also, three constructive heuristic algorithms are developed based on the machine aggregation and greedy strategies. Some empirical evaluation of the performance of the proposed branch-and-bound and heuristic algorithms are also performed.

Single-Machine Total Completion Time Scheduling with Position-Based Deterioration and Multiple Rate-Modifying Activities

  • Kim, Byung-Soo;Joo, Cheol-Min
    • Industrial Engineering and Management Systems
    • /
    • 제10권4호
    • /
    • pp.247-254
    • /
    • 2011
  • In this paper, we study a single-machine scheduling problem with deteriorating processing time of jobs and multiple rate-modifying activities which reset deteriorated processing time to the original processing time. In this situation, the objective function is to minimize total completion time. First, we formulate an integer programming model. Since the model is difficult to solve as the size of real problem being very large, we design an improved genetic algorithm called adaptive genetic algorithm (AGA) with spontaneously adjusting crossover and mutation rate depending upon the status of current population. Finally, we conduct some computational experiments to evaluate the performance of AGA with the conventional GAs with various combinations of crossover and mutation rates.

Multiobjective Genetic Algorithm for Scheduling Problems in Manufacturing Systems

  • Gen, Mitsuo;Lin, Lin
    • Industrial Engineering and Management Systems
    • /
    • 제11권4호
    • /
    • pp.310-330
    • /
    • 2012
  • Scheduling is an important tool for a manufacturing system, where it can have a major impact on the productivity of a production process. In manufacturing systems, the purpose of scheduling is to minimize the production time and costs, by assigning a production facility when to make, with which staff, and on which equipment. Production scheduling aims to maximize the efficiency of the operation and reduce the costs. In order to find an optimal solution to manufacturing scheduling problems, it attempts to solve complex combinatorial optimization problems. Unfortunately, most of them fall into the class of NP-hard combinatorial problems. Genetic algorithm (GA) is one of the generic population-based metaheuristic optimization algorithms and the best one for finding a satisfactory solution in an acceptable time for the NP-hard scheduling problems. GA is the most popular type of evolutionary algorithm. In this survey paper, we address firstly multiobjective hybrid GA combined with adaptive fuzzy logic controller which gives fitness assignment mechanism and performance measures for solving multiple objective optimization problems, and four crucial issues in the manufacturing scheduling including a mathematical model, GA-based solution method and case study in flexible job-shop scheduling problem (fJSP), automatic guided vehicle (AGV) dispatching models in flexible manufacturing system (FMS) combined with priority-based GA, recent advanced planning and scheduling (APS) models and integrated systems for manufacturing.

Vertex Coloring based Slot Reuse Scheduling for Power Line Communications

  • Yoon, Sung-Guk
    • Journal of Electrical Engineering and Technology
    • /
    • 제10권5호
    • /
    • pp.2135-2141
    • /
    • 2015
  • Power line communication (PLC) is one of the major communication technologies in smart grid since it combines good communication capability with easy and simple deployment. As a power network can be modeled as a graph, we propose a vertex coloring based slot reuse scheduling in the time division multiple access (TDMA) period for PLCs. Our objective is to minimize the number of assigned time slots, while satisfying the quality of service (QoS) requirement of each station. Since the scheduling problem is NP-hard, we propose an efficient heuristic scheduling, which consists of repeated vertex coloring and slot reuse improvement algorithms. The simulation results confirm that the proposed algorithm significantly reduces the total number of time slots.

유전자 알고리즘을 이용한 매트릭스조직의 객체지향개발 프로젝트 스케줄링 (Project Scheduling for Object-Oriented Development in Matrix Organization)

  • 이건호;김은진
    • 대한안전경영과학회지
    • /
    • 제9권5호
    • /
    • pp.67-78
    • /
    • 2007
  • This paper discusses a scheduling problem on object-oriented developments over multiple teams with limited resources in matrix organization. The objective of the problem is to minimize the makespan of overall projects. There are tangible and intangible advantages such as efficient resource share, improvement of productivity, development efforts and cost reduction, etc. by dispatching resources properly to the development teams. Traditionally, the project scheduling has been done with a manager's intuition or heuristic. We present a scheduling model with illustrative examples, stochastic search approach, and apply a variety of problems generated randomly to the approach. The results are analysed.