1 |
Ding, Z., "A survey of radar resource management algorithms," in Proc. Canadian Conf. Electrical and Computer Engineering 2008, pp. 1559-1564.
|
2 |
Pinedo, M. L., "Scheduling : Theory, Algorithms, and Systems," Springer, 2012.
|
3 |
Park, J. W., Jang, D. S., Choi, H. L., Tahk, M. J., Roh, J. E. and Kim, S. J., "Integrated Simulator of Airborne Multi-function Radar Resource Manager and Environment Model," KSAS Journal, Vol. 41, No.7, 2013, pp. 577-587.
과학기술학회마을
DOI
ScienceOn
|
4 |
Jeong, S. J., Jang, D. S., Choi, H. L. and Roh, J. E., "Statistical Analysis of Task Scheduling Rules for Airborne Radar," KSAS Conference 2012.11, pp. 300-306.
|
5 |
Yalaoui, F., Chu, C., "Parallel machine scheduling to minimize total tardiness," International journal of production economics, 2002, pp. 265-279.
|
6 |
Biskup, D., Herrmann, J., "Scheduling identical parallel machines to minimize total tardiness," International journal of production economics, 2008, pp. 134-142.
|
7 |
Nyirenda, J. C., "Relationship between the modified due date rule and the heuristic of Wilkerson and Irwin," Operation Research Society of South Africa, Vol. 17, No. 1/2, pp. 101-111
|
8 |
Alidaee, B., Rosa, D., "Scheduling parallel machines to minimize total weighted and unweighted tardiness," Computers operations of research, No. 8, 1997, pp. 775-788.
|
9 |
Shun, L., Hideki, H., Run, S., Hitoi, T., and Tadashi, O., "Radar Network System to Observe & Analyze Tokyo Bay Vessel Traffic," IEEE Aerospace and Electronic Systems Magazine, Vol. 19, No. 11, 2004, pp. 3-11.
DOI
|
10 |
Chisham, G., Lester, M., Milan, S. E., et al. "A decade of the Super Dual Auroral Radar Network (SuperDARN): Scientific achievements, new techniques and future directions," Surveys in geophysics, Vol. 28, No. 1, 2007, pp. 33-109.
DOI
|
11 |
Baker, K. R., Kanet, J. J., "Job shop scheduling with modified due dates," Journal of operations management, 1983, pp. 11-22.
|
12 |
Skolnik, M., "Radar handbook," McGraw-Hill, 2008.
|
13 |
Adrian. O., "M3R AESA technology for extended air defence," IEEE Aerospace and Electronic System Magazine, 2010, Vol. 25, No. 8, pp. 11-16.
|
14 |
Izquierdo-Fuente. A. and Casar-Corredera. J. R., "Optimal radar pulse scheduling using a neural network," in Proc. IEEE Int Neural Networks IEEE World Congress Computational Intelligence. Conf., 1994, vol. 7, pp. 4588-4591.
|
15 |
Butler, J. M., "Tracking and control in multi-function radar" Ph.D. dissertation, University College London, 1998.
|
16 |
Jang, D. S. and Choi, H.L., "A task scheduling algorithm for airborne multi-function AESA radars based on time-window chaining," KSAS Spring conference, Apr. 2011.
|
17 |
Severson, T. and Paley, D. A., "Distributed Optimization for Radar Mission Coordination," In Proc. American Control Conf., 2012, pp. 5102-5107.
|
18 |
Scala. B. L. and Moran. B., "Optimal target tracking with restless bandits," Digital Signal Processing, 2006, Vol. 16, No. 5, pp. 479-487.
DOI
ScienceOn
|
19 |
Ghosh. S., Raj RajkumarR., Hansen. J., and Lehoczky. J., "Integrated qos-aware resource management and scheduling with multi-resource constraints," Real-Time Systems, 2006, Vol. 33, No. 1-3, pp. 7-46.
DOI
ScienceOn
|
20 |
Harada. F., Ushio.T., and Nakamoto. Y., "Adaptive resource allocation control for fair QoS management," IEEE Transactions on computers, 2007, Vol. 56, No. 3, pp. 344-357.
DOI
ScienceOn
|
21 |
Shin, H.-J., Hong, S.-M. and Hong, D.-H. "Adaptive-update-rate target tracking for phased-array radar," IEEE Proceedings-Radar, Sonar and Navigation, 1995, Vol. 142, No. 3, pp. 137-143.
DOI
ScienceOn
|
22 |
Lenstra. J. K., Kan. A. H. G. R., Brucker. P., "Complexity of machine scheduling problems," Annals of Discrete Mathematics 1, 1977, pp. 343-362.
DOI
|