1 |
Allahverdi, A. and F.S. Al-Anzi, "A PSO and a Tabu Search Heuristics for the Assembly Scheduling Problem of the Two-stage Distributed Database Application," Computers and Operations Research, Vol.33(2006), pp. 1056-1080.
DOI
ScienceOn
|
2 |
Lee, C.Y., T.C.E. Cheng and B.M.T. Lin, "Minimizing the Makespan in the 3-Machine Assembly-type Flowshop Scheduling Problem," Management Science, Vol.39(1993), pp.616-625.
DOI
ScienceOn
|
3 |
Sen, T., P. Dileepan and J.N.D. Gupta, "The Two-machine Flowshop Scheduling Problem with Total Tardiness," Computers and Operations Research, Vol.16(1989), pp.333-340.
DOI
ScienceOn
|
4 |
Sun, X., K. Morizawa and H. Nagasawa, "Powerful Heuristics to Minimize Makespan in Fixed, 3-Machine, Assembly-type Flowshop Scheduling," European Journal of Operational Research, Vol.146(2003), pp.499-517.
|
5 |
Yoon, S.H., I.S. Lee and C.S. Sung, "A Note on the Reversibility of the Two Stage Assembly Scheduling Problem," International Journal of Management Science, Vol.13(2007), pp.25-34.
과학기술학회마을
|
6 |
Pan, J.C., J. Chen and C. Chao, "Minimizing Tardiness in a Two-machine Flow-shop," Computers and Operations Research, Vol.29 (2002), pp.869-885.
DOI
ScienceOn
|
7 |
Hariri, A.M.A. and C.N. Potts, "A Branchand- Bound Algorithm for the Two-Stage Assembly Scheduling Problem," European Journal of Operational Research, Vol.103 (1997), pp.547-556.
DOI
ScienceOn
|
8 |
Schaller, J., "Note on Minimizing Total Tardiness in a Two-machine Flowshop," Computers and Operations Research, Vol.32(2005), pp.3273-3281.
DOI
ScienceOn
|
9 |
Potts, C.N., S.V. Sevast'janov, V.A. Strusevich, L.N. van Wassenhove and C.M. Zwaneveld, "The Two-stage Assembly Scheduling Problem : Complexity and Approximation," Operations Research, Vol.43(1995), pp.346-355.
DOI
ScienceOn
|
10 |
윤상흠, 이익선, 이종협, "두 단계 조립시스템에 서 총 가중완료시간을 최소화하는 일정계획문 제", 「대한산업공학회지」, 제33권, 제2호(2007), pp.254-264.
|
11 |
Pan, J.C. and E.T. Fan, "Two-machine Flowshop Scheduling to Minimize Total Tardiness," International Journal of Systems Science, Vol.28(1997), pp.405-414.
DOI
ScienceOn
|
12 |
Koulamus, C., "The Total Tardiness Problem : Review and Extensions," Operations Research, Vol.42(1994), pp.1025-1041.
DOI
ScienceOn
|
13 |
Tozkapan, A., O. Kirca and C.S. Chung, "A Branch and Bound Algorithm to Minimize the Total Weighted Flowtime for the Twostage Assembly Scheduling Problem," Computers and Operations Research, Vol.30 (2003), pp.309-320.
DOI
ScienceOn
|
14 |
Kim, Y.D., "A New Branch and Bound Algorithm for Minimizing Mean Tardiness in Two-machine Flowshops," Computers and Operations Research, Vol.20(1993), pp.391-401.
DOI
ScienceOn
|
15 |
이익선, 윤상흠, "가중납기지연시간을 고려한 최적 주문처리순서에 관한 연구", 「한국경영과 학회지」, 제33권, 제2호(2008), pp.87-101.
과학기술학회마을
|