• Title/Summary/Keyword: Multi Project

Search Result 789, Processing Time 0.03 seconds

Performance Analysis of CoMP with Scheduling and Precoding Techniques in the HetNet System (이종 네트워크에서 스케줄링 및 프리코딩을 결합한 다중 포인트 협력 통신 기술의 성능 분석)

  • Kim, Bora;Moon, Sangmi;Malik, Saransh;Kim, Cheolsung;Hwang, Intae
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.50 no.8
    • /
    • pp.45-52
    • /
    • 2013
  • Coordinated Multi-Point (CoMP) is considered as a technology in the 3rd Generation Partnership Project(3GPP) Long Term Evolution-Advanced (LTE-A) system. In this paper, we design and analyze the performance of the Coordinated Beamforming (CB) technique, which is one major category of CoMP. We perform Monte Carlo simulations with a Heterogeneous Network (HetNet) in LTE-A, and confirm the performance through a graph of the Cumulative Distribution Function (CDF). From the simulation results, we show significant performance gain with the CoMP technique, and better performance when we apply various schemes of scheduling and precoding.

The Case Study on Performance Measurement Weighting for Efficient Value Engineering Study of Sewage Treatment Facliity (하수처리시설의 효율적인 VE수행을 위한 다단계성능평가 분석)

  • Kim, Dongjin;Park, Jaeil;Lee, Jaehun;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.40-47
    • /
    • 2016
  • Recently, the demand of sewage treatment facilities have increased by growing the population growth of city and industrialization. However, most of public sewage treatment facilities lack the preparations of design criteria by increasing sewage water amount in the future. In order to respond to this situation, the government has consistently promoted the sewage treatment construction project. This study conducted a survey targeting residents and sewage treatment facilities, civil engineering a VE project professionals for effectively operating the sewage treatment facilities and improving its value to be built in the future. Based on this survey, this study will introduce the list of performance measurements which can not only save cost but also reflect opinion of users and residents. In addition, using Multi-Level Performance Measurement and AHP analyzed the weights of performance measurement which is more objective than existing things for applying efficient VE process

Development of Performance Analysis System for Construction Projects Using Data Warehousing Technology (데이터 웨어하우스 기술을 활용한 건설프로젝트 성과분석 시스템 개발)

  • Yu Jung-Ho;Song Sang-Hoon;You Won-Hee;Lee Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.89-98
    • /
    • 2005
  • Recently the construction industry in Korea is facing problems such as low productivity, contraction of the domestic construction market, growing competition, and so on. To enhance the competitiveness continuously through efficiency in this business environments, construction companies need to make efforts to measure and accumulate performance data based on the strategic factors. When analysing performance of construction projects, the unique characteristics of each project should be considered properly, by which the managers can identify current status of project in various perspectives. This study proposes the performance analysis system using the concepts of balanced scorecard and data warehouse technology. The suggested system provides the management with the flexibility in analyzing performance data by applying the pre-defined key performance indicators and the function of multi-dimensional analysis.

Limits of Fully Anechoic Room for Radiated Disturbance Using Correlation Factor (야외시험장과 전자파 완전 무반사실과의 상관계수를 이용한 완전 무반사실의 허용 기준 제안)

  • Lee, Soon-Yong;Chung, Yeon-Choon;Choi, Jea-Hoon
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.21 no.12
    • /
    • pp.1401-1411
    • /
    • 2010
  • In this paper, we suggested the tolerance limits of FAR(Fully Anechoic Room) using correlation factor between OATS(Open area Test Site) to measure EMI(Electromagnetic Interference) and FAR to measure EMS(Electromagnetic Susceptibility). FAR Project(SMT4-CT96-2133), CISPR/A/665/DTR, and CISPR A/665/DTR documents are analyzed and theoretical correlation factor based on the documents and theoretical equations is drawn. To obtain the experimental correlation factor, EUT(Equipment Under Test) is fabricated as well as measured at the 10 m distance OATS and in the 3 m distance FAR. Also, to suggest the tolerance limits of EUT with multi sources, radiation theory for electric and magnetic dipoles is programmed. We drew the correlation factor for EUT with multi sources through the programs. As the tolerance limits of FAR is newly defined, It can be used alternative test site for OATS to measure EMI, efficiently.

A Low Memory Bandwidth Motion Estimation Core for H.264/AVC Encoder Based on Parallel Current MB Processing (병렬처리 기반의 H.264/AVC 인코더를 위한 저 메모리 대역폭 움직임 예측 코어설계)

  • Kim, Shi-Hye;Choi, Jun-Rim
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.48 no.2
    • /
    • pp.28-34
    • /
    • 2011
  • In this paper, we present integer and fractional motion estimation IP for H.264/AVC encoder by hardware-oriented algorithm. In integer motion engine, the reference block is used to share for consecutive current macro blocks in parallel processing which exploits data reusability and reduces off-chip bandwidth. In fractional motion engine, instead of two-step sequential refinement, half and quarter pel are processed in parallel manner in order to discard unnecessary candidate positions and double throughput. The H.264/AVC motion estimation chip is fabricated on a MPW(Multi-Project Wafer) chip using the chartered $0.18{\mu}m$ standard CMOS 1P5M technology and achieves high throughput supporting HDTV 720p 30 fps.

A Factor Analysis of the Size Decision of Community Facilities in Rural Village - Focused on Community Facilities Developed by the Rural Development Project - (농촌마을 커뮤니티시설 규모설정 요인분석 - 농산어촌지역개발로 조성된 커뮤니티시설을 중심으로 -)

  • Hwang, Sungki;Cho, Seonggeol;Eom, Seong Jun;Qu, Rui;Ha, Deokcheon;Jeong, Kiseok;Kang, Hyunmo;Rhee, Shinho
    • Journal of Korean Society of Rural Planning
    • /
    • v.25 no.1
    • /
    • pp.99-111
    • /
    • 2019
  • To analyze main factors of size planning of community facilities that were created as part of development of a rural area, the present condition of factors deciding size of community facilities was analyzed, factors that influence size planning by the type of community facility were drawn with Delphi anaysis. The results of analyzing the present condition of size planning factors of community facilities show that facilities have been generally planned as multi-purpose and multi-functional facilities. And on the basis of the purpose of facilities, their functions and organization, and their operation programs, facilities are classified into community-centered, agritourism-centered, and combined ones. Using Delphi analysis, major factors that could affect size planning of community facilities were drawn on 26 community-centered, 28 agritourism-centered, and 30 combined. And the factors tended not to be applied well for size planning of community facilities.

Factors Clustering Approach to Parametric Cost Estimates And OLAP Driver

  • JaeHo, Cho;BoSik, Son;JaeYoul, Chun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.707-716
    • /
    • 2009
  • The role of cost modeller is to facilitate the design process by systematic application of cost factors so as to maintain a sensible and economic relationship between cost, quantity, utility and appearance which thus helps in achieving the client's requirements within an agreed budget. There are a number of research on cost estimates in the early design stage based on the improvement of accuracy or impact factors. It is common knowledge that cost estimates are undertaken progressively throughout the design stage and make use of the information that is available at each phase, through the related research up to now. In addition, Cost estimates in the early design stage shall analyze the information under the various kinds of precondition before reaching the more developed design because a design can be modified and changed in all process depending on clients' requirements. Parametric cost estimating models have been adopted to support decision making in a changeable environment, in the early design stage. These models are using a similar instance or a pattern of historical case to be constituted in project information, geographic design features, relevant data to quantity or cost, etc. OLAP technique analyzes a subject data by multi-dimensional points of view; it supports query, analysis, comparison of required information by diverse queries. OLAP's data structure matches well with multiview-analysis framework. Accordingly, this study implements multi-dimensional information system for case based quantity data related to design information that is utilizing OLAP's technology, and then analyzes impact factors of quantity by the design criteria or parameter of the same meaning. On the basis of given factors examined above, this study will generate the rules on quantity measure and produce resemblance class using clustering of data mining. These sorts of knowledge-base consist of a set of classified data as group patterns, of which will be appropriate stand on the parametric cost estimating method.

  • PDF

A Multi-Level Digital Twin for Optimising Demand Response at the Local Level without Compromising the Well-being of Consumers

  • Byrne, Niall;Chassiakos, Athanassios;Karatzas, Stylianos;Sweeney, David;Lazari, Vassiliki;Karameros, Anastasios;Tardioli, Giovanni;Cabrera, Adalberto Guerra
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.408-417
    • /
    • 2022
  • Although traditionally perceived as being a visualization and asset management resource, the relatively rapid rate of improvement of computing power, coupled with the proliferation of cloud and edge computing and the IoT has seen the expanded functionality of modern Digital Twins (DTs). These technologies, when applied to buildings, are now providing users with the ability to analyse and predict their energy consumption, implement building controls and identify faults quickly and efficiently, while preserving acceptable comfort and well-being levels. Furthermore, when these building DTs are linked together to form a community DT, entirely new and novel energy management techniques, such as demand side management, demand response, flexibility and local energy markets can be unlocked and analysed in detail, creating circularity in the economy and making ordinary building occupants active participants in the energy market. Through the EU Horizon 2020 funded TwinERGY project, three different levels of DT (consumer - building - community) are being created to support the creation of local energy markets while optimising building performance for real-time occupant preferences and requirements for their building and community. The aim of this research work is to demonstrate the development of this new, interrelated, multi-level DT that can be used as a decision-making tool, helping to determine optimal scenarios simultaneously at consumer, building and community level, while enhancing and successfully supporting the community's management plan implementation.

  • PDF

A Study on Multilayer Sub-contracting in Construction Industry of Hong Kong

  • Cheng, T.F.;Lam, H.C.;Leung, K.L.;Liu, W.T.;Zayed, Tarek;Sun, Yi
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.23-29
    • /
    • 2020
  • Multilayer sub-contracting is a significant practice among the world, including Hong Kong. When a principal contractor secured a project from a developer, the specific jobs will usually be breaking down and sub-contractors with the lowest bid [1]. The adoption of multilayer sub-contracting has been a controversy issue which is considered as a two-side blade. While certain studies have been carried out to examine both the contributions, damages and improvements for multi-layer subcontracting, the construction industry and researchers are still waiting for a solid measure to enhance the system. Hence, this research attempts to study the advantages, disadvantages, conducts a comparison between single and multilayer sub-contracting and measures of current Hong Kong construction industry based on literature review, questionnaire and in-depth interviews. To achieve the objectives, Analytic Hierarchy Process (AHP) and total weighted score methods are adopted to examine and rank the criterion. The findings of this study provide a good basis for understanding the major reasons and problems caused by the adoption of multilayer sub-contracting. Besides, the identified safety perspective explores a new perspective regarding to issues of multi-layer subcontracting, which will serve as a solid foundation for further research to enhance safety performance. Finally, the findings of measurements towards improvement of multilayer sub-contracting will also provide a solidsolution for construction industry.

  • PDF

Cost Prediction Models in the Early Stage of the Roadway Planning and Designbased on Limited Available Information (가용정보를 활용한 기획 및 설계초기 단계의 도로 공사비 예측모델)

  • Kwak, Soo-Nam;Kim, Du-Yon;Kim, Byoung-Il;Choi, Seok-Jin;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.87-100
    • /
    • 2009
  • The quality of early cost estimates is critical to the feasibility analysis and budget allocation decisions for public capital projects. Various researches have been attempted to develop cost prediction models in the early stage of a construction project. However, existing studies are limited on its applicability to actual projects because they focus primarily on a specific phase as well as utilize restricted information while the amount of information collectable differs from one another along with the project stages. This research aims to develop two-staged cost estimation model for the schematic planning and preliminary design process of a construction projects, considering the available information of each phase. In the schematic planning stage where outlined information of a project is only available, the Case-Based Reasoning model is used for easy and rapid elicitation of a project cost based on the extensive database of more than 90 actual highway construction projects. Then, the representing quantity-based model is proposed for the preliminary design stage where more information on the quantities and unit costs are collectable based on the alternative routes and cross-sections of a highway project. Real case studies are used to demonstrate and validate the benefits of the proposed approach. Through the two-stage cost estimation system, users are able to hold a timely prospect to presume the final cost within the budge such that feasibility study as well as budget allocation decisions are made on effectively and competitively.