• Title/Summary/Keyword: Measured slope and slope length

Search Result 94, Processing Time 0.026 seconds

A Study on the Integrated Computer Program for the Multi Analysis of In-Situ Aquifer and Geothermal Response Test (현장 열응답시험과 현장 대수성시험결과를 동시 분석 가능한 통합전산 Program에 관한 연구)

  • Hahn, Jeong-Sang;Han, Hyuk-Sang;Yonn, Yun-Sang
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.4 no.1
    • /
    • pp.11-19
    • /
    • 2008
  • Groundwater flow in confined aquifer and heat transport in underground geologic media are using same governing equation(line source) like well fuction. Therefore the conventional slope method using only later data obtained from in-situ thermal response test to determine the thermal conductivity of vertical geothermal heat exchanger(GHEX) is basically identical with one of Theis straight line method of aquifer test under artesian condition. In case that the pumping rate(Q, $m^3$/d) and drawdown(s,m) which are used for input data of existing hydrogeologic computer programs for aquifer test are replaced and converted to supplying heat energy per unit length of bore hole(Q/L,w/m or Kcal/h.m) and temperatures (T,$^{\circ}C$)measured at in and out-let of GHEX as in put data respectively, thermal conductivity around geothermal heat exchanger can be easily estimated without any special modification of the existing hydrogeologic computer program. Two numbers of time series temperature variation data obtained from in situ geothermal response test are analized using Theismethods(standard curve and straight line method) by using existing aquifer test program and conventional Slope method proposed by ASHRAE. The results show that thermal conductivity values estimated by two straight methods are identical and the difference of estimated values between standard curve methods and Slope method are also within acceptable ranges. In general,the thermal conductivity estimated from Theis straight linemethod gives more accurate value than the one of Slope method due to that Slope method uses only visual matching otherwise Theis method uses automatic curve matching estimation with reducing RSS.

  • PDF

Verification on the Design Formulas of Apron Length by Scour Analysis at Weir Downstream (보 하류부 세굴 분석을 통한 물받이공 길이 설계 공식 검토)

  • Ko, Dongwoo;Lee, Changhun;Kang, Joongu
    • Ecology and Resilient Infrastructure
    • /
    • v.7 no.2
    • /
    • pp.83-89
    • /
    • 2020
  • This hydraulic study analyzed the scour effect at fixed downstream weirs based on the changes in the upstream bed slope. The study was performed using six different bed slopes, that is, 0%, 2%, 3%, 4%, 7%, and 10% at 0.117 ㎥/s in all cases. The scour depth, scour length, and scour volume were measured using a broadband laser scanner to quantitatively analyze the scour at the downstream weir. This study also examined the adequacy of the designed apron length by comparatively analyzing the results of the scour experiments and the apron length calculated using conventional design standard formulas. The analysis of the local scour effect at the downstream weir showed that scour length and scour depth increased as the bed slope became steeper. A comparison between the results of the scour experiment and that of the conventional design formulas showed that both formulas of the National Construction Research Institute and the Bligh were distributed within the allowable values when there was no upstream bed slope. However, as the bed slope upstream of the weir gradually increased, the scour lengths of the apron deviated slightly from the values obtained from the conventional design formulas.

Application of Slope-area Discharge Estimation Method using Continuously Observed Water Level Data in a Gravel Bed River -Case Study of the Dal Cheon River- (자갈하천에서 연속적인 수위 자료를 이용한 경사면적법 유량 산정 -달천 사례연구-)

  • Lee, Chan-Joo;Kim, Ji-Sung;Kim, Chi-Young;Kim, Dong-Gu
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.5
    • /
    • pp.503-515
    • /
    • 2008
  • In this study we calculate discharge by slope-area method using continuously observed water level data and analyse the results. This study is performed in the Dalcheon river reach of 960 m length including riffles and a pool, which is located downstream of the Goesan Dam. Three values of roughness coefficient are applied to discharge calculation, which are established using bed material size analysis. Another roughness coefficient value obtained from the river improvement plan is also used. Calculated discharges by slope-area method are compared with dam discharges. Relative difference from dam discharges appears to be largely affected by roughness values and a value of 0.042 or more seems most suitable for the entire study reach. Smaller roughness value is suitable to the reach which has gentler water surface slope than mean channel slope of the entire study reach, while a larger value to steeper reach. In case roughness value is set considering overall slope of the channel, it is desirable to select the entire calculation reach including both gentler and steeper sub-reaches. Since relative difference becomes nearly constant at over 500 cms, in case that verification of applied roughness is conducted with other directly measured discharge, accuracy of measurement by slope-area method for larger discharge may be improved.

Classifications of Arm and Correspondence with Partial Somatotype of Upper Body (팔의 유형화와 상반신 부분체형과의 대응에 관한 연구)

  • 이정란
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.23 no.6
    • /
    • pp.864-875
    • /
    • 1999
  • This study was done to classify type os arms and to correspond these types with partial somatotype of upper body such as lateral views of upper body shapes of shoulder. The subjects of this study were female college students of twenties 58 anthropometric and photographic data were measured. The results were as follows : 1. Form the factor analysis arm girth/armscye size factor arm length factor the slope of lower arm, arm factor the curves of armscye the roundness of arm/shapes of shoulder the slope of upper arm factor were obtained. 2. By using factor scores 4 clusters of arm types were extracted. The characteristics of these clusters were projections of armscy slant of lower arm thick-set canelike. 3. Four types of arm were corresponded with the specified lateral views of upper body directions of shoulder slopes of shoulder.

  • PDF

Development of Computer Vision System for Individual Recognition and Feature Information of Cow (II) - Analysis of body parameters using stereo image - (젖소의 개체인식 및 형상 정보화를 위한 컴퓨터 시각 시스템 개발(II) - 스테레오 영상을 이용한 체위 분석 -)

  • 이종환
    • Journal of Biosystems Engineering
    • /
    • v.28 no.1
    • /
    • pp.65-76
    • /
    • 2003
  • The analysis of cow body parameters is important to provide some useful information fur cow management and cow evaluation. Present methods give many stresses to cows because they are invasive and constrain cow postures during measurement of body parameters. This study was conducted to develop the stereo vision system fur non-invasive analysis of cow body features. Body feature parameters of 16 heads at two farms(A, B) were measured using scales and nineteen stereo images of them with walking postures were captured under outdoor illumination. In this study, the camera calibration and inverse perspective transformation technique was established fer the stereo vision system. Two calibration results were presented for farm A and fm B, respectively because setup distances from camera to cow were 510 cm at farm A and 630cm at farm B. Calibration error values fer the stereo vision system were within 2 cm for farm A and less than 4.9 cm for farm B. Eleven feature points of cow body were extracted on stereo images interactively and five assistant points were determined by computer program. 3D world coordinates for these 15 points were calculated by computer program and also used for calculation of cow body parameters such as withers height. pelvic arch height. body length. slope body length. chest depth and chest width. Measured errors for body parameters were less than 10% for most cows. For a few cow. measured errors for slope body length and chest width were more than 10% due to searching errors fer their feature points at inside-body positions. Equation for chest girth estimated by chest depth and chest width was presented. Maximum of estimated error fur chest girth was within 10% of real values and mean value of estimated error was 8.2cm. The analysis of cow body parameters using stereo vision system were successful although body shape on the binocular stereo image was distorted due to cow movements.

A STUDY ON THE SIZE OF CONDYLE AND THE POSTERIOR SLOPE OF THE ARTICULAR EMINENCE IN PATIENTS WITH TEMPOROMANDIBULAR JOINT DISORDERS. (측두하악장애 환자에서 과두크기와 관절융기의 후방경사에 관한 연구)

  • Park, Won-Hee;Shim, Kwang-Sup;Woo, Soon-Seop;Lee, Young-Soo
    • Maxillofacial Plastic and Reconstructive Surgery
    • /
    • v.22 no.1
    • /
    • pp.43-50
    • /
    • 2000
  • The purpose of this study was to investigate the interrelationship between temporomandibular joint disorders, and the condyle size and angle of the posterior slope of the articular eminence. The subjects used in this study were 100 patients with temporomandibular joint disorders and 100 volunteers with normal temporomandibular joints. All the patients and the volunteers were subjected to take panoramic and temporomandibular radiographs for the morphologic evaluation. The films were traced, measured, and analyzed. The data were processed with SPSS/PC+ package for statistical analysis. The obtained results were as follows; 1. The posterior slope of the articular eminence in the group of temporomandibular joint disorders was larger than that in the normal group (p<0.05). The mean articular eminence angle was $31.6^{\circ}\;{\pm}\;6.3$ in the group of temporomandibular joint disorder, and $29.9^{\circ}\;{\pm}\;8.4$ in the normal group. 2. There were no statistically significant differences in the discrepancies of the left and right articular eminence angular measurements between the group (p>0.05). 3. There were no statistically significant differences in the condylar ratio between the groups (p>0.05). 4. There were no statistically significant differences in the discrepancies of the left and right ramus length measurements between the groups (p>0.05). 5. The relative size of condyle to fossa in the group of temporomandibular disorders was smaller than that in the normal group (p<0.05).

  • PDF

Modelling of Sediment Transportation and Deposition in GIS (GIS를 이용한 토사이송 및 퇴적분포 예측기법 개발)

  • Son, Kwang-Ik
    • Journal of Korea Water Resources Association
    • /
    • v.38 no.3 s.152
    • /
    • pp.223-233
    • /
    • 2005
  • In this study, a two-dimensional model for identifying areas of erosion and deposition over a basin was developed based on the mass balance principle in a distributed model. The program consists of three steps: (a) estimation of soil erosion; (b) determination of flow amount and direction; and (c) estimation of mass balance. Soil erosion was estimated with USLE. A single-direction (SF) and a multi-direction flow algorithm (MF) were applied to estimate slope length (L). The Maximum Downhill Slope Method (MDS) and the Neighborhood Method (NBH) were used to estimate the slope degree (S). Sediment transport resulting from eroded soil was estimated using Ferro's (1998) and Swift's (2000) sediment delivery ratio (DR). The model was validated by comparing the predicted sediment yields for three basins with measured data. The developed algorithm showed that Ferro's DR method combined with the MDS and MF produced the best agreement with the dredging records of three agricultural reservoir basins in Korea.

Estimation of Rock Drilling Work Size for Mountain Forest Road Construction (산악지(山岳地) 임도시설(林道施設)을 위한 암석천공(岩石穿孔) 작업량(作業量)의 예측(豫測))

  • Ma, Sang Kyu
    • Journal of Korean Society of Forest Science
    • /
    • v.76 no.3
    • /
    • pp.193-199
    • /
    • 1987
  • Simple estimating method of rock drilling and blasting work size is necessary to apply as a guidance of general road plan and a cost analysis of mountain forest road construction. For this work study, 11 cycles were divided in 5km route at Hyeonnammeon Yangyang-gun and the mountain slope at every 20m interval was measured. During working days all kind of works concerned on drilling and blasting was investigated in every cycle. Depending on the simple work study results it's work size can bef estimated with high correlation between drilling length in meter and frequency percentage of mountain slope more than 70%. With total drilling length known the machinery hours, drillers and explosive quantify can be estimated by the regression with high correlation. Estimation of drilling and blasting work by mountain slope gradient in road route is proposed like table 5 with estimating value of machinery hour, drillers and explosive in granite gneiss region.

  • PDF

An Experimental Study for Drainage Capacity Improvement of Waterway with Steep Slope (급경사 사면 도수로의 배수능력 개선을 위한 실험적 연구)

  • Kim, Jung Soo;Kim, Ju Hyung;Yoon, Sei Eui
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2303-2315
    • /
    • 2013
  • In general, the waterway was installed for drain water from steep slope and waterway cover was set up to prevent overflow and water separation at berm of waterway. In this study, hydraulic experiment was conducted to analyze the flow characteristics and enact standard design criteria of the waterway. Hydraulic experimental apparatus which can change the slope of waterway and the length of berm were installed to analyze of flow characteristics at the waterway. The slopes of waterway were $40^{\circ}$, $50^{\circ}$, $60^{\circ}$, and $70^{\circ}$ and the range of discharge were 1.0~5.6 ${\ell}/s$. The flow in berm was distinguished two types such as hydraulic jump and splash flow. These kinds of flows depended on the rates of discharge in waterway. When inlet discharge was below 1.1~2.0 ${\ell}/s$, the separation phenomenon of water was generated at upper and lower portion in berm by the splash flow. The scattering range of water particles and length of water separation was measured depending on the slope of waterway. The start point of scattering was about 20 cm(1.3B) from the place connected upper waterway with brem and the length of water separation was till 210 cm(3.5B) from the place connected lower waterway with brem. Therefore, the waterway cover needed to install from starting of berm to 1B and from the lower part of berm to 3.5B.

Accurate RF C-V Method to Extract Effective Channel Length and Parasitic Capacitance of Deep-Submicron LDD MOSFETs

  • Lee, Sangjun;Lee, Seonghearn
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • v.15 no.6
    • /
    • pp.653-657
    • /
    • 2015
  • A new paired gate-source voltage RF capacitance-voltage (C-V) method of extracting the effective channel length and parasitic capacitance using the intersection between two closely spaced linear regression lines of the gate capacitance versus gate length measured from S-parameters is proposed to remove errors from conventional C-V methods. Physically verified results are obtained at the gate-source voltage range where the slope of the gate capacitance versus gate-source voltage is maximized in the inversion region. The accuracy of this method is demonstrated by finding extracted value corresponding to the metallurgical channel length.