• 제목/요약/키워드: Maintenance and Operation

검색결과 2,133건 처리시간 0.037초

The application study of preventive maintenance during normal operation for APR1400 nuclear power plants considering risk

  • Jung-Wun Kim;YoungJu Lee;Weon Gyu Shin
    • Nuclear Engineering and Technology
    • /
    • 제56권10호
    • /
    • pp.4327-4334
    • /
    • 2024
  • Preventive Maintenance(PM) for safety component during power operation at nuclear power plants, On-Line Maintenance(OLM) refers to intentionally entering the Limited Condition of Operation(LCO) specified in the Technical Specification(TS) for safety-related systems and components in order to perform preventive maintenance within the Allowed Outage Time (AOT). This study assessed the feasibility of conducting OLM at the domestic APR1400 nuclear power plant. It focused on preventive maintenance duration and risk perspectives. A total of 78 FEGs were developed for 4450 facilities, considering system functions and preventive maintenance scope during output operation for eight safety-related systems. Additionally, maintenance items included in FEGs were selected, designated as targets for OLM, and their maintenance durations were evaluated and compared with AOT for each maintenance item. As a result, the Auxiliary Feedwater and Essential Chilled Water systems were identified as systems allowing OLM. Furthermore, utilizing the Risk Monitoring System (RIMS), the increased risk value due to the unavailability of target equipment during preventive maintenance was analyzed to determine whether it falls within the acceptable range. Regarding the temporary risk increase caused by OLM, it was observed that in all systems, it falls within Zone III according to NUMARC93-01 standards, allowing for normal equipment arrangement for OLM. However, according to the risk increase standards rate in domestic nuclear power plants, when maintaining the A-train in four systems including Component Cooling Water, they are all evaluated as 'Orange,' indicating that measures for risk mitigation are necessary for OLM to be feasible. When considering extending AOT up to 1.6 times the maintenance time, the risk increase falls within Zone III according to permissible change in risk standards, indicating that AOT extension might be feasible based solely on risk changes. To apply OLM within the permissible risk management scope in domestic nuclear power plants, regulatory policies need to allow voluntary LCO entry for preventive maintenance, necessitating clear determination by regulatory agencies using risk-informed policies. While OLM seems viable concerning maintenance duration and quantitative risk aspects, for inducing regulatory policy changes, comprehensive OLM guidelines are necessary, including risk management strategies.

연장된 운용기간을 활용하는 그룹보전모형 (A Group Maintenance Model with Extended Operating Horizon)

  • 유영관
    • 대한안전경영과학회지
    • /
    • 제19권3호
    • /
    • pp.89-95
    • /
    • 2017
  • This paper presents another maintenance policy for a group of units under finite operating horizon. A group of identical units are subject to random failures. Group maintenances are performed to all units together at specified intervals, and the failed units during operation are remained idle until the next group maintenance set-up. Unlike the traditional assumption of infinite operating horizon, we adopt the assumption of the finite operating horizon which reflect the rapid industrial advance and short life cycle of modern times. The units are under operation until the end of the operating horizon. Further, the operation of units are extended to the first group maintenance time after the end of the horizon. The total cost under the proposed maintenance policy is derived. The optimal group maintenance interval and the expected number of group maintenances during the horizon are found. It is shown that the proposed policy is better than the classical group maintenance policy in terms of total cost over the operating horizon. Numerical examples are presented for illustrations.

신규 도입차량 유지관리 기술과 품질보증 대책에 대한 고찰 (A Study on the New Rolling Stock Vehicle Maintenance Technology and Discussion on Quality Assurance Measures)

  • 최석중;김문홍;김봉래
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.27-37
    • /
    • 2011
  • Currently, in the course of introducing rolling stocks, RAMS standard and management by system engineering method apply to rolling stock system. Technical elements and results applied in system introduction phase are just used in acquisition stage, and these are not applied to the standard in railway site. Therefore, it is difficult to apply to standardized technology and quality assurance measure. Due to the establishment of the EU, railway operation system is internationalized and the international railway standards are being discussed in various ways. In addition, standardization is expanded from manufacture to operation and maintenance. It is to provide consistent standard in quality, cost calculation of maintenance technology, maintenance technology and quality assurance in case of international railway safety incidents. Therefore, this study is to find technology, quality and cost management model to be used for choosing railway-operation guidance by considering how technologies & quality have changed in system life cycle, compared with estimated standards, based on the technologies & quality-related result in the process of getting new rolling stocks and management guidance for operation & maintenance process.

  • PDF

열차 차량기지의 중정비 검수 용량 시뮬레이션 분석 (Simulation Analysis of the Train Overhaul Maintenance Capacity for Rolling Stock Depot)

  • 전병학;이원영;장성용;유재균
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1481-1498
    • /
    • 2007
  • As railroad industry face the new Renaissance era, effective and efficient maintenance methods for rolling stock operation are required with advanced railroad technology. All kinds of railroad systems such as high speed long distance train, metropolitan mass transit and light rail require systematic maintenance technology in order to maintain the safe railroad operation. Simulation models for detailed operations of the sample maintenance center are developed. In this study, standard maintenance procedures, layout, equipments and number of workers of Siheung Metropolitan Railroad Maintenance Rolling Stock Depot are considered. The proposed simulation models are developed using simulation package ARENA. Three simulation analysis using the developed simulation model are done. First, the bottleneck operation is identified. Second, the relationship between maintenance center size, number of workers and cycle time is analyzed. Lastly, the scheduling performances between PERT/CPM and Critical Chain Project Management(CCPM) are compared.

  • PDF

제4세대 언어를 사용한 서비스품질 관리 프로그램의 개발 (Development of the Quality of Service management program using the fourth generation language)

  • 박순달;정호연;서정대;김태호
    • 경영과학
    • /
    • 제9권1호
    • /
    • pp.41-52
    • /
    • 1992
  • The QOS(Quality of Service) recognized by the customer will become the most important thing under the competitive telecommunications market. Korea Telecom is going to develop many system to manage the telecommunication network, to improve the level of QOS, and to increase the revenue. Operation and Maintenance Adiministration System is one of the systems developed to meet those purposes efficiently. This system gathers qualities data from telephone offices or operation centers and analyze the results of QOS improvement activities and evaluate overall QOS. And also system makes it possible to improve the cost/effectiveness of operation and maintenance of telecommunication network. Operation and Maintenance Administration System has four functional modules, i.e., the user interface module, the database management module, the QOS management module, and the database conversion module. The purpose of this study is to develop the QOS management program, one of the four functional modules of the system,using FOCUS 4GL/DBMS. Since Operation and Maintenance Administration System is developed using FOCUS 4GL, every user can handle and maintain the system very easily and reduce system backlogs.

  • PDF

Tele-robotic Application for Nozzle Dam Maintenance Operation in Nuclear Power Plants

  • Seo, Yong-Chil;Kim, Chang-Hoi;Cho, Jae-Wan;Kim, Seung-Ho
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2004년도 ICCAS
    • /
    • pp.1520-1524
    • /
    • 2004
  • This paper describes the development of a robotic maintenance system for use in a maintenance operation of the nozzle dam in a water chamber of a steam generator at the Kori nuclear power plant in Korea. The robotic maintenance system was designed to minimize the personnel exposure to a hazardous radioactive environment. This robotic maintenance system is operated by a teleoperated control which was designed to perform the nozzle dam maintenance tasks in a remote manner without endangering the human workers. Specific maintenance tasks involve the transportation, insertion, and removal of nozzle dams in a water chamber inside a steam generator via a narrow man-way entrance port. The developed robotic maintenance system has two major subsystems: a two degrees of freedom guiding device acting as the main guiding arm and a master-slave manipulator with a kinematic dissimilarity. The mechanical design considerations, control system, and capabilities of the robotic maintenance system are presented. Finally, a graphical representation of the nozzle dam maintenance processes in a simulated work environment are also demonstrated.

  • PDF

운영·관리 및 서비스 지표에 기반한 정보시스템 유지보수 비용 추정 모델 (The Maintenance Cost Estimation Model for Information System Maintenance Based on the Operation, Management and Service Metrics)

  • 이병철;류성열
    • 한국컴퓨터정보학회논문지
    • /
    • 제18권5호
    • /
    • pp.77-85
    • /
    • 2013
  • 본 연구는 소프트웨어의 변경을 가하는 순수 유지보수 비용 외에 운영 관리 및 서비스 향상을 위한 비용 측정지표를 도출하고 이를 기반으로 정보시스템유비보수 비용 추정 모델을 제안한다. 운영 관리 및 서비스 향상 측정지표는 선행연구를 요약 분류하여 지표의 기반으로 도출하고 경험적인 측정지표를 추가 보완하였으며, 이를 근거로 유지보수 비용 추정 모델을 제안한다. 제안한 측정지표는 정보시스템 유지보수 범위에 따라 선택적으로 사용할 수 있어 상세한 유지보수 비용 산정이 가능하다. 제안한 유지보수 비용 측정지표와 비용 추정 모델의 유효성을 검증하기 위하여 기존의 연구와 비교 검증하여 유효성을 입증하였다.

지하철 유지관리 계측의 문제점 분석 및 개선방안 연구 (Case Study on Analysis the Problem and Improvement of Subway Maintenance Monitoring)

  • 우종태;김홍석
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 봄 학술세미나 논문집
    • /
    • pp.93-104
    • /
    • 2000
  • By means of analyzing the problems in monitoring plan, design, installation, operation based on maintenance monitoring system installed in subway tunnel section, the methods of improvement were proposed for applying to subway monitoring maintenance effectively in future. The choice of the better monitoring system, the operating method of monitoring system, the confidence and continuity of maintenance monitoring, the performance of responsible monitoring supervision in the phase of the planning of monitoring and design were proposed. The problem and developed plan in the different monitoring systems, the calibration and correction of monitoring system, the analysis for the results and plan for maintenance in the phase of installation of monitoring system and operation were also proposed.

  • PDF

Virtual Analysis of the Remote Operation of the ACP

  • Yoon Ji sup;Kim Sung Hyun;Song Tai Gil;Lim Kwang-Mook
    • 한국방사성폐기물학회:학술대회논문집
    • /
    • 한국방사성폐기물학회 2005년도 Proceedings of The 6th korea-china joint workshop on nuclear waste management
    • /
    • pp.60-75
    • /
    • 2005
  • The remote operation of the Advanced Spent Fuel Conditioning Process (ACP) is analyzed by using the 3D graphic simulation tools. The ACP equipment operates in intense radiation fields as well as in a high temperature. Thus, the equipment should be designed in consideration of the remote handling and maintenance. As well as suitable remote handling and maintenance method needs to be provided. To provide such remote operation technology, we developed the graphic simulator which provides the capability of verifying the remote operability of the ACP without fabrication of the process equipment. In other words, by applying virtual reality to the remote maintenance operation, a remote operation task can be simulated in a computer, not in a real environment. In this way the graphic simulator can substantially reduce the design cost of the remote operation process and the equipment. Also it can provide new operation concept that is more reliable, easier to implement, and easier to understand.

  • PDF

차세대 전동차 대불선 시운전 시 유지보수방안 연구 (A study on advanced EMU's maintenance program on test operation in Dabul line)

  • 김영규;박세영;송정훈;안천헌;이한민
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.2215-2222
    • /
    • 2010
  • Advanced EMU have been enhanced in terms of safe transport and maintainability. It is a new urban railway technology that enables an operation institution to cut repair and maintenance costs and customers to use convenient service at lower costs based on IT technology. If a development vehicle of Advanced EMU is completed, it will be used to test the entire advanced EMU system through sufficient performance check and reliability check prior to operation in commercial line. It will also verify efficiency, safety, punctuality and energy efficiency of transport. Accordingly, it is necessary to figure how to repair and maintain vehicles to enhance safety of Advanced EMU system in cooperation with operation during the period of comprehensive evaluation on the operation of a development vehicle in a test line. In this paper, we investigated the maintenance program of Advanced EMU on test operation in Dabul line. The test condition and operation environment of Advanced EMU in Daebul line was analyzed.

  • PDF