• 제목/요약/키워드: Life Time Distribution

검색결과 873건 처리시간 0.034초

Further Results Involving the $NBU_{mgf}$ Class of Life Distributions

  • Elbatal I.
    • International Journal of Reliability and Applications
    • /
    • 제7권1호
    • /
    • pp.13-25
    • /
    • 2006
  • A new class of life distributions is studied. This class is defined based on comparing the residual life time to the whole life in the moment generating function order giving 'the new better than used in the moment generating function order ageing class $(NBU_{mgf})$'. Fundamental properties of this class are given including some closure properties and characterizations. Finally, we consider new results about comparisons of age and block replacement policies when the underlying distribution belongs to $NBU_{mgf}$ aging classes.

  • PDF

Estimation of a Bivariate Exponential Distribution with a Location Parameter

  • 홍연웅;권용만
    • Journal of the Korean Data and Information Science Society
    • /
    • 제13권2호
    • /
    • pp.243-250
    • /
    • 2002
  • This paper considers the problem of estimating parameters of the bivariate exponential distribution with a location parameter for a two-component shared parallel system using component data from system-level life test terminated at the time of the prespecified number of system failure. In the system-level life testing, there are three patterns of failure types ; 1) both component failed 2) both component censored 3) one is failed and the other is censored. In the third case, we assume that the failure time might be known or unknown. The maximum likelihood estimators are obtained for the case of known/unknown failure time when the other component is censored.

  • PDF

실제 교량의 시스템 신뢰성해석에 기초한 수명예측 (Lifetime Prediction of Existing Highway Bridges Using System Reliability Approach)

  • 양승이
    • 한국강구조학회 논문집
    • /
    • 제14권2호
    • /
    • pp.365-373
    • /
    • 2002
  • 이 논문에서는 교량의 수명을 예측하기 위한 시스템 신뢰성 이론이 설명되고, 생애 분포 함수를 이용하여 현존하는 교량의 잔존 수명을 예측하는 방법이 설명된다. 시스템 이론과 생애함수 (survivor functions) 를 이용하여 LIFETIME 이라는 프로그램을 개발하였다. Survivor functions은 주어진 시간 t에 대해 신뢰성을 산출한다. 이 프로그램을 이용하여 콜로라도주에 있는 교량의 수명을 예측하였다. 이 교량은 직렬과 병렬로 구성된 시스템으로 컴퓨터 모델링 되었으며 이 모델을 이용하여 시스템 파괴 확률을 시간에 대해 계산하였다.

Accelerated life test plan under modified ramp-stress loading with two stress factors

  • Srivastava, P.W.;Gupta, T.
    • International Journal of Reliability and Applications
    • /
    • 제18권2호
    • /
    • pp.21-44
    • /
    • 2017
  • Accelerated life tests (ALTs) are frequently used in manufacturing industries to evaluate the reliability of products within a reasonable amount of time and cost. Test units are subjected to elevated stresses which yield quick failures. Most of the previous works on designing ALT plans are focused on tests that involve a single stress. Many times more than one stress factor influence the product's functioning. This paper deals with the design of optimum modified ramp-stress ALT plan for Burr type XII distribution with Type-I censoring under two stress factors, viz., voltage and switching rate each at two levels- low and high. It is assumed that usage time to failure is power law function of switching rate, and voltage increases linearly with time according to modified ramp-stress scheme. The cumulative exposure model is used to incorporate the effect of changing stresses. The optimum plan is devised using D-optimality criterion wherein the ${\log}_{10}$ of the determinant of Fisher information matrix is maximized. The method developed has been explained using a numerical example and sensitivity carried out.

  • PDF

공동주택 구성재의 내용년수 산정방법에 관한 연구 (A Study on the Service life of the Building Components in the Apartment Housing)

  • 이강희;장정희;채창우
    • 한국주거학회논문집
    • /
    • 제16권5호
    • /
    • pp.67-74
    • /
    • 2005
  • The performance of building should be deteriorated with time while the building would maintain and manage the function and performance to get a living condition. For the efficient maintenance of the building, the repair cycle would be provided and applied during the service-life time. The service-life time of the building components would be needed to determine the repair time and the repair scope. The service-life time of the building components would be calculated with the 1st repair time and the recovery rate of the performance, considering the recovery rate after repaired. In this paper, the 1st repair time would be estimated with the normal probability distribution, choice probability and 3rd quadratic function. The recovery rate of the building components assumes various level according to the research target and utility area. The results of this study are as follows ; first, most of the components of the building work would range about 30 years in the service-life time and the components of the mechanical works range from 28 years to 37 years, those of the electrical works would be about 31 years.

전력설비의 수명계산을 위한 통계적 분석기법의 활용 및 검증에 대한 연구 (A Study on the Application and Verification of Statistical Techniques for Calculating the Life of Electric Power Facilities)

  • 이온유;김강식;이홍석;조종은;김상봉;박기훈
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제8권1호
    • /
    • pp.9-14
    • /
    • 2022
  • Social infrastructure facilities such as production, transportation, gas and electricity facilities may experience poor performance depending on time, load, temperature, etc. and may require maintenance, repair and management as they are used. In particular, in the case of transformers, the process of managing them for the purpose of preventing them from failing is necessary because a failure can cause enormous social damage. The management of transformers should consider both technical and economic aspects and strategic aspects at the same time. Thus, it applies the Asset Management concept, which is widely used in the financial industry as an advanced method of transformer management techniques worldwide. In this paper, the operation and power outage data were secured for the asset management of the transformer for distribution, and the asset status was analyzed. Analysis of asset status using actual operation and power outage data is essential for assessing the statistical life and failure rate of the facility. Through this paper, the status of transformer assets for arbitrary A group distribution was analyzed, and the end of life and replacement life were calculated.

농업용 트랙터 변속기의 가속 수명 시험법의 사례연구 (Case Study of Accelerated Life Test Method for Agricultural Tractor Transmission)

  • 김대철;강영선
    • Journal of Biosystems Engineering
    • /
    • 제34권5호
    • /
    • pp.325-330
    • /
    • 2009
  • This study was performed to develop accelerated life test methods for agricultural tractor transmission receiving variable load. To acquire parameters for calculation of accelerated life test, endurance tests were performed under different torque conditions. Test results showed that the shape factor of Weibull distribution was 1.5 and fatigue damage exponent was 5.4. The calculated test time was 5,877 hours under the conditions of average life (MTBF) 3,000 hours and 90% reliability for one test sample. According to the linear cumulative damage rule, test time could be reduced using increased test load. Test time could be reduced by 252 hours when 1.2 times of the rated load compared with 0.67 times of the rated equivalent load calculated by load spectrum of the agricultural tractor. Calculated acceleration coefficient was 23.3.

Bilevel-programming based failure-censored ramp-stress ALTSP for the log-logistic distribution with warranty cost

  • Srivastava, P.W.;Sharma, D.
    • International Journal of Reliability and Applications
    • /
    • 제17권1호
    • /
    • pp.85-105
    • /
    • 2016
  • In this paper accelerated life testing is incorporated in quality control technique of acceptance sampling plan to induce early failures in high reliability products.Stress under accelerated condition can be applied in constant-stress, step-stress and progressive-stress or combination of such loadings. A ramp-stress results when stress is increased linearly (from zero) with time. In this paper optimum failure-censored ramp-stress accelerated life test sampling plan for log-logistic distribution has been formulated with cost considerations. The log-logistic distribution has been found appropriate for insulating materials. The optimal plans consist in finding optimum sample size, sample proportion allocated to each stress, and stress rate factor such that producer's and consumer's interests are safeguarded. Variance optimality criterion is used when expected cost per lot is not taken into consideration, and bilevel programming approach is used in cost optimization problems. The methods developed have been illustrated using some numerical examples, and sensitivity analyses carried out in the context of ramp-stress ALTSP based on variable SSP for proportion nonconforming.

Optimum multi-objective modified step-stress accelerated life test plan for the Burr type-XII distribution

  • Srivastava, P.W.;Mittal, N.
    • International Journal of Reliability and Applications
    • /
    • 제15권1호
    • /
    • pp.23-50
    • /
    • 2014
  • This paper deals with formulation of optimum multi-objective modified step-stress accelerated life test (ALT) plan for Burr type-XII distribution under type-I censoring. Since it is impractical to estimate only one objective parameter after conducting costly ALT tests; also, it is not desirable to assume instantaneous changes in stress levels because of limited capacity of test equipments and the presence of undesirable failure modes, therefore, an optimum multi-objective modified step-stress ALT plan has been designed. The optimal test plan consists in determining the optimum low stress level and optimal time at which stress starts linearly increasing from low stress by minimizing the weighted sum of the asymptotic variances of the maximum likelihood estimator of quantile lifetimes at design constant stress. The method developed has been illustrated using an example. Sensitivity analysis has been carried out. Comparative study has also been done to highlight the merits of the proposed model.

  • PDF