• Title/Summary/Keyword: Launch Vehicle Development Process

Search Result 49, Processing Time 0.022 seconds

A Study on the Life Cycle for Launch Vehicle in NASA (NASA의 발사체 수명주기에 대한 연구)

  • Jung, Dong-Ho;Kim, Ji-Hoon;Lee, Han-Ju;Oh, Seung-Hyub
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2006.11a
    • /
    • pp.99-105
    • /
    • 2006
  • A Launch vehicle which consists of many sub-systems is one sophisticated huge system. A lot of experience and system integration technique are needed for the launch vehicle to accomplish a mission successfully. The characteristics and complexity in the development of the launch vehicle depend on the size of that. However the systematic work flow is similar to each other. This paper introduces a standardized development process which is based on the whole program life cycles and experiences of NASA on the development of the launch vehicle. The development process can be categorized into 10 phases through the life cycle of the launch vehicle.

  • PDF

Practical Requirements and Verification Management for Requirements-based Development Process in Space Launch Vehicle Development Project (요구조건 기준의 개발 수행을 위한 우주발사체 개발사업의 실제적인 요구조건-검증 관리 체계)

  • Dong Hyun Cho;Jun Hyouk Jang;Il Sang Yoo
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.19 no.1
    • /
    • pp.56-63
    • /
    • 2023
  • For the success of system development, it is necessary to systematically manage the requirements that are the basis of system development and its verification results. In order to follow the principles of SE(Systems Engineering)-based V&V(Verification&Validation) process, requirements can be managed by securing the requirements and their establishments, design compliances, and verification compliances according to the system development lifecycle. Especially, in a large-complex system research and development project, such as a space launch vehicle development project, many participants establish, verify, and validate numerous requirements together during the project. Therefore, logical and systematic requirements management, including guarantee of data integrity, change history, and traceability, is very important for multiple participants to utilize numerous requirements together without errors. This paper introduces the practical requirements and verification management for the requirements-based development process in the space launch vehicle development project.

Development of Cryogenic Propellant Filling System for Launch Vehicle (발사체 극저온 추진제 충전시스템 개발)

  • Yu, Byung-Il;Kim, Ji-Hoon;Park, Pyun-Gu;Park, Soon-Young
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2010.11a
    • /
    • pp.676-677
    • /
    • 2010
  • In Naro Space Center, Naro launch vehicle launched 2 times. Launch pad for Naro launch vehicle in Naro space center equipped propellant feeding facility for operating launch process. This paper studied development process and operating method for liquid oxygen filling system of cryogenic propellant systems in launch pad propellant feeding facility.

  • PDF

Development of Configuration Management Methodology for Rocket Development Test Facilities (발사체 개발 시험시설의 형상관리 방법론 개발)

  • Jeon, Chanmin;Choi, Minchan;Park, Taekeun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.31-41
    • /
    • 2023
  • This study is a study to develop a configuration management methodology for efficient and systematic management in the event of configuration changes such as deformation, explosion, and remodeling of launch vehicle development test facilities, which are emerging as important national facilities in the era of full-scale space competition. Through the analysis of international standards for configuration management, a configuration management process framework to be applied to launch vehicle development test facilities is extracted, a survey was conducted on experts who performed life cycle engineering of launch vehicle development test facilities, and a configuration management methodology optimized for operation/management of domestic launch vehicle development test facilities was proposed. Identify the configuration for launch vehicle development test facilities, the configuration management manager, configuration management organization, and configuration management board approve/process the configuration changes, and after construction is completed according to design requirements, launch vehicle development test facilities try to manage the configuration in a controlled state.

Analysis on Flow Control Method for Simultaneous Fuel Filling of the Korea Space Launch Vehicle-II (한국형발사체 연료 동시충전을 위한 유량제어 방식에 대한 고찰)

  • Yeo, Inseok;Lee, Jaejun;An, Jaechel;Kang, Sunil
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.22 no.5
    • /
    • pp.132-140
    • /
    • 2018
  • To lunch the Korea Space Launch Vehicle-II(KSLV-II), a second launch complex will be built at the Naro Space Center, and a Kerosene Filling System (KFS) will be installed. KFS of KSLV-II launch complex system is being designed based on Naro Launch Complex. But this must supply fuel to fuel tanks of the vehicle with only a supply pump because KSLV-II is a 3-stage launch vehicle unlike Naro Launch Vehicle or Test Launch Vehicle (TLV). A sudden rise of pump output pressure is recognized during fuel filling scenario selection process. This occurs because return flow can not actively deal with much flow change using the orifice-type flow-control method. To solve this problem, it is verified that fuel can be stably supplied by installing an accumulator, designed for appropriate adjustment of filling-mode change sequence via flow analysis of various cases.

Systems Engineering Processes for KSLV-II Program (한국형발사체개발사업 시스템엔지니어링 프로세스)

  • Park, Chang-Su;Kim, Keun-Taek
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.10 no.2
    • /
    • pp.81-87
    • /
    • 2014
  • The Korea space launch vehicle-II (KSLV-II) program aims at developing a national launch vehicle system capable of launching 1.5 ton satellite into a sunsynchronous orbit. It is the succeeding program to the Naro launch vehicle program. The KSLV-II is a large-scale complex system which requires a systematic approach to all parts of the program. The KSLV-II program is currently developing a tailored systems engineering process for its need. It references practices and lessons learned from developing Naro launch vehicle. Standardized NASA processes and INCOSE processes were also referenced and compared during development of the process framework. This paper introduces the systems engineering processes developed for the KSLV-II program.

A Process of the Technical Performance Management for A Space Launch Vehicle R&D Project (우주발사체 개발사업을 위한 기술성능관리 프로세스)

  • Yoo, Il Sang;Cho, Dong Hyun;Kim, Keun Taek
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.10 no.2
    • /
    • pp.71-79
    • /
    • 2014
  • To enhance success probability of a system development project, its overall risk level should be minimized through systematically managing schedules, costs, and technical performances. However, Attempts to manage technical performance compared to numerous efforts to control costs and schedules in such projects are deficient. Particularly, a space launch vehicle, a large complex system, development project is much less likely to meet its technical performance objectives due to its technological difficulty, along with schedule delay and cost overrun. The technical performance management (TPM) is a method for tracking and managing technical progress in order to achieve technical performance targets within schedule and budget. In this paper, we investigate applications of the TPM in several space launch vehicle development projects. Then we propose and validate the TPM process to achieve a successful mission in such projects.

Introduce for Development of Pyro Valve of Vehicle Holding Device for KSLV-II (한국형발사체 발사체고정장치용 파이로밸브 개발 소개)

  • Ji, Sang-Yeon;Kang, Sun-Il;Lee, Young-Ho
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2017.05a
    • /
    • pp.26-29
    • /
    • 2017
  • KARI has been conducting R&D for independent development of KSLV-II since 2010. Vehicle holding device is a device for vertically standing SLV on the launch pad of launch complex and fixing the lower part of vehicle in order to firmly fix vehicle so that SLV does not fall from an external load such as a wind load. When thrust generated after the 1st stage engine ignition of SLV must exceed the takeoff weight of vehicle, and holding device should be quickly released so that it does not interfere with takeoff of vehicle like other ground equipment at the beginning of the launch. Pyro-valve is one of the key components constituting VHD, and it should have high reliability and quick response characteristics with similar functional parts applied to launch vehicle separation device and satellite separation device. Through this paper, I intend to broaden the overall understanding of the development process of pyro-valve for VHD and KSLV-II.

  • PDF

A Study on Establishing the Requirements Verification Matrix (RVM) for the Space Launch Vehicle (우주발사체 요구조건 검증 매트릭스(RVM) 수립 연구)

  • Jang, Junyouk;Cho, Dong Hyun;Yoo, Il Sang
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.14 no.2
    • /
    • pp.16-23
    • /
    • 2018
  • The intended system's function and performance can be assured through implementing the development process, the verification compliance against corresponding requirements, in accordance with the fundamental principle from the Systems Engineering. For the effective verification implementation, related core metadata should be selected and managed throughout the development life cycle. And these have to be included in the configuration document such as specification so that taking them as development baselines each phases if necessary. In this paper, associated case study results are introduced to establish the Requirements Verification Matrix (RVM) for the verification management on the space launch vehicle development program.

A Study on the Development Process of the Liquid Rocket Engine for the Upper Stage of the Korea Space Launch Vehicle-II (한국형발사체 상단 액체로켓엔진의 개발과정에 대한 고찰)

  • Seo, Kyoun-Su;Park, Soon-Young;Nam, Chang-Ho;Moon, Yoonwan
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.26 no.1
    • /
    • pp.68-76
    • /
    • 2022
  • Upper stage of the Korea Space Launch Vehicle-II(KSLV-II) uses a 7-tons class liquid rocket engine and is an open gas generator cycle with a turbopump supply method that uses kerosene/liquid oxygen as the propellant combination. This study first provided a brief overview of the design and development process of the upper stage engine. In addition, it introduced the solutions and results applied to some of the problems that occurred during the development process of the upper stage engine.