DOI QR코드

DOI QR Code

요구조건 기준의 개발 수행을 위한 우주발사체 개발사업의 실제적인 요구조건-검증 관리 체계

Practical Requirements and Verification Management for Requirements-based Development Process in Space Launch Vehicle Development Project

  • 투고 : 2023.04.20
  • 심사 : 2023.06.27
  • 발행 : 2023.06.30

초록

For the success of system development, it is necessary to systematically manage the requirements that are the basis of system development and its verification results. In order to follow the principles of SE(Systems Engineering)-based V&V(Verification&Validation) process, requirements can be managed by securing the requirements and their establishments, design compliances, and verification compliances according to the system development lifecycle. Especially, in a large-complex system research and development project, such as a space launch vehicle development project, many participants establish, verify, and validate numerous requirements together during the project. Therefore, logical and systematic requirements management, including guarantee of data integrity, change history, and traceability, is very important for multiple participants to utilize numerous requirements together without errors. This paper introduces the practical requirements and verification management for the requirements-based development process in the space launch vehicle development project.

키워드

참고문헌

  1. NASA, "NASA Systems Engineering Handbook", SP-2016-6105, Rev.2, 2016
  2. Dong-Hyun Cho, Il Sang Yoo, "A Process of the Risk Management for a Space Launch Vehicle R&D Project", Journal of the Korean Society of Systems Engineering, Vol.12, No.2, 2016
  3. KARI Space Launch Vehicle R&D Office, "Project Management Model for Korea's Space Launch Vehicle Project", L2-PD-00071, 2019
  4. INCOSE, "Systems Engineering Handbook: 4th Edition", INCOSE-TP-2003-002-04, 2015
  5. NASA, "Space Launch System Program Verification & Validation Plan", SLS-PLAN-009, Ver.1, 2013
  6. KARI Space Launch Vehicle R&D Office, "KSLV-II Requirements and Verification Management Plan", L2-PN-00037, 2018
  7. Junyouk Jang, Dong-Hyun Cho, Il Sang Yoo, "A Study on Establishing the Requirements Verification Matrix(RVM) for the Space Launch Vehicle", Journal of the Korean Society of Systems Engineering, Vol.14, No.2, 2018
  8. Dong-Hyun Cho, Junyouk Jang, Chang Young Lim, Il Sang Yoo, Mu Seong Hwang, "Web-based Systems Engineering Management System in a Space Launch Vehicle R&D Project", 2017 Fall Conference of the Korean Society of Systems Engineering
  9. Il Sang Yoo, Dong-Hyun Cho, DaeSeung Kim, "Practices for Securing Requirements Traceability to Develop and Acquire the Target System", 2016 Fall Conference of the Korean Society of Systems Engineering
  10. Junyouk Jang, Dong-Hyun Cho, Il Sang Yoo, "A Justification and Management of Requirements Establishment for the Space Launch Vehicle", 2019 Fall Conference of the Korean Society of Systems Engineering
  11. Junyouk Jang, Dong-Hyun Cho, Il Sang Yoo, "The Requirements and Verification Management for the Successful Space System Development", 2022 Fall Conference of the Korean Society of Propulsion Engineers