DOI QR코드

DOI QR Code

Systems Engineering Processes for KSLV-II Program

한국형발사체개발사업 시스템엔지니어링 프로세스

  • Published : 2014.12.30

Abstract

The Korea space launch vehicle-II (KSLV-II) program aims at developing a national launch vehicle system capable of launching 1.5 ton satellite into a sunsynchronous orbit. It is the succeeding program to the Naro launch vehicle program. The KSLV-II is a large-scale complex system which requires a systematic approach to all parts of the program. The KSLV-II program is currently developing a tailored systems engineering process for its need. It references practices and lessons learned from developing Naro launch vehicle. Standardized NASA processes and INCOSE processes were also referenced and compared during development of the process framework. This paper introduces the systems engineering processes developed for the KSLV-II program.

Keywords

References

  1. Miok Joh, Kyoun-Su Seo, Myoung Ho Shin, Soondo Hong, Young-In Choi, Hyeon Cheol Gong, Bum Seok Oh, Analysis of Systems Engineering Management Techniques for Launch Vehicle Development, 4th Space Launch Vehicle Technology Symposium, 2003.
  2. Miok Joh, Byoung-Kyu Cho, Bum Seok Oh , Eui Seung Chung, Application of System Engineering Management Techniques for KSLV-I Development, 5th Space Launch Vehicle Technology Symposium, 2004.
  3. Miok Joh, Byoung-Kyu Cho, Bum Seok Oh , Jeong-Joo Park, Gwang-Rae Cho, Application of SE Management Techniques for Space Launch System Development, System Engineering Journal, Vol 1. No.1, 53-60, 2005.
  4. Miok Joh, Myoung Ho Shin, Introduction of Program Life-Cycle Management System for Space Launch System Development, System Engineering Journal, Vol 2. No.1, 48-53, 2006.
  5. NASA Systems Engineering Handbook, NASA/SP-2007-6105 Rev.1, 2007
  6. ISO/IEC 15288, Systems and software engineering - System life cycle processes, 2nd Edition, Feb. 2008
  7. INCOSE Systems Engineering Handbook, v.3.2, 2010.
  8. DAPA Systems Engineering Club, Systems Engineering Guidebook, Ver. 2, 2010.
  9. KSLV-II Program Office, KSLV-II Systems Engineering Management Plan, 2014.