1 |
NASA, Systems Engineering Handbook, p47-48, Appendix D, 2007
|
2 |
NASA, MSFC Verification Handbook Volume II, p2.1.54-64, 1994
|
3 |
NASA, SLS Program Launch Vehicle Specification, p53-26, 2012
|
4 |
INCOSE, Systems Engineering Handbook V.2a, 2004
|
5 |
ESA, Space Engineering Verification Guidelines, 2010
|
6 |
DAPA, Systems Engineering Technical Review GUIDEBOOK, 2017
|
7 |
Keun-Taek Kim, Chang-Su Park, Byung-Chan Kwon, A Scheme of Systems Engineering Based Requirements Management for Development of a Large Complex System, Journal of the Korea Society of Systems Engineering, Vol.12, No.2, p39-45, 2016
DOI
|
8 |
KSLV-II Program Office, KSLV-II Requirements and Verification Management Plan, 2017
|
9 |
Junyouk Jang, Dong Hyun Cho, Il Sang Yoo, A Study on the Requirements Verification Schema for the Space Launch Vehicle, 2017 Spring Conference of the Korea Society of Systems Engineering, 2017
|