1 |
Armstrong, J., "Technical Performance Measures : Connecting Technical and Management Progress", James R Armstrong Consulting Services. Sep. 2008
|
2 |
Cho, D. H., Yoo, I. S., Kim, K. T., "Trends and Analysis of Space Launch Failures", Bulletin of the Korean Space Science Society, Vol. 23, No. 1, pp. 65, April, 2014
|
3 |
Choi, S., "A Study on Technical Measures and Their Application", Journal of the Korea Society of Systems Engineering, Vol. 3, No. 2, pp. 3-8, 2007
|
4 |
EIA-632, Processes for Engineering a System, Jan. 1999
|
5 |
Hur, J., Noh, H., "A Study on TPM for Performance Management of Weapon System R&D Program", Journal of the Korea Institute of Military Science and Technology, Vol. 13, No. 4, pp. 612-618, Aug. 2010
|
6 |
IEEE Std 1220, IEEE Standard for Application and Management of the Systems Engineering Process, Sep. 2005
|
7 |
INCOSE, Technical Measurement v.1, Dec. 2005
|
8 |
INCOSE, Systems Engineering Handbook, v.3.2.1, pp.240-249, 2011
|
9 |
ISO/IEC 15288, Systems and software engineering - System life cycle processes, 2nd Edition, Feb. 2008
|
10 |
NASA Marshall Space Flight Center, Constellation Systems Launch Vehicle (CSLV) Systems Engineering Management Plan(SEMP) v1.0, pp.51-53. May 2006
|
11 |
NASA Marshall Space Flight Center, Project Management and Systems Engineering Handbook, Rev. B
|
12 |
NASA, Space Systems Engineering, version 1.0, Technical Performance Measures Module & Margins and Contingency, http://spacese.spacegrant.org/
|
13 |
NASA, Systems Engineering Handbook, Rev. 1, Dec. 2007
|
14 |
Oakes, J, Botta, R., Bahill T., Technical Performance Measures, 2004
|
15 |
U.S. Air Force, Space & Missile Systems Center, Systems Engineering Primer & Handbook, 3rd Edition, pp 90-91, 216, 256-258, April 2005
|
16 |
Yoo, I. S., Cho, D. H., Hong, I. H., "Global Trends of Space Launch Vehicle Technology", Bulletin of the Korean Space Science Society, Vol. 22, No. 1, pp. 62, April, 2013
|