• Title/Summary/Keyword: Land Cost

Search Result 848, Processing Time 0.027 seconds

Energy efficiency retrofit package plan for existing buildings (기존 건축물의 에너지 효율화 리트로핏 패키지 방안)

  • Kim, Su Min;Cho, Hyun Mi
    • Land and Housing Review
    • /
    • v.11 no.1
    • /
    • pp.95-101
    • /
    • 2020
  • In the past few decades, the global population growth and rapid economic development have resulted in significant increases in building energy consumption. To reduce greenhouse-gas emissions and building energy consumption, building materials and energy technologies must be optimized. Building retrofitting is a more efficient method than reconstruction to improve the building energy performance. In order to improve the energy performance of existing buildings, this study proposed energy-efficiency retrofit plans and derived cost-effective retrofit plan. The energy efficient retrofit method is achieved through the packaging of energy technology and the energy and cost reduction effect of the energy efficiency retrofit package are analyzed. As a result of the study, the energy-efficiency retrofit package showed an energy reduction effect of up to 60% or more and a construction cost reduction of about 30%. This study argues that optimal energy and construction cost reduction of existing buildings are possible through the packaging of energy efficiency technology.

Identification of Core Items for Repair Works of Apartment Housing by Evaluating Necessity of Repair Work and Buren of Repair Cost (수선필요도와 비용부담도 평가를 통한 공동주택 수선공사 핵심항목 도출방안)

  • Song, Sanghoon;Lee, Seok-Je;Park, Seong-Sik
    • KIEAE Journal
    • /
    • v.16 no.4
    • /
    • pp.79-86
    • /
    • 2016
  • Purpose: Frequently, the apartment management offices have difficulties in effective repair works due to their insufficient technological capability to operate long-term repair program. There also have been many cases of failure in executing urgent repairs mainly because the repair allowance has not accumulated enough for the repair works on time. This study aimed to determine core items in apartment maintenance in order to reduce the confusion and unnecessary efforts for the management office by suggesting simple list of repair items. Method: Core items are defined using several indicators. The degrees of necessity for repair work(NRW) are calculated combining the impacts to living, safety, and aesthetics. Then the degrees of burden of repair cost(BRC) are estimated by analyzing actual long-term repair program of three apartment complexes. Lastly the degrees of accumulation demand for repair allowance(AD) are calculated with NRW and BRC. Result: The core items and essential items are suggested for three apartment types as case studies based on the indicators of NRW, BRC, and AD. Then, the required accumulated allowance per $m^2$ was calculated to effectively implement repair works.

A Study on the Space Size Analysis in the Multifamily Housing in aspect of management cost. -Focused on the Central Heating System using the diesel, kerosene- (공동주택 관리비용에 따른 적정공간규모 산정에 관한 연구 -경유, 등유를 사용하는 중앙집중난방방식을 중심으로 -)

  • 이강희;양재혁
    • Journal of the Korean housing association
    • /
    • v.13 no.5
    • /
    • pp.89-99
    • /
    • 2002
  • The multifamily housing has various advantages in construction cost, land-use intensity. KRIHS(1997) recommended the proper scale of th multifamily housing as 800 households in constructability, 1,000 households in facility compactability, 500 households in social aspect. At the early planning stage of project, the size of the multiftmily housing has, until now, been maximizingly considered under the regulation on which has been emphasized at the building volume ratio, land area, etc., except for the expenditure during the maintenance stage. This paper aimed at providing the proper size of multifamily housing in aspect of area and household number with maintenance cost at the early stage of project. For these, it took 곧 average cost function which is made from the 3-rd quardratic form and analyzes the unit increasing rate of the average cost. It surveyed in nationwide focused on the central heating system using diesel and kerosene. The number of samples is 88 and items of management cost is 11. The results are as follows ; first, 3rd-order quadratic function is proper at explaining the cost variation, considering the multicollinearity and statistics. Second, the proper size of multifamily housing is recommended with 83,000 $m^2$ on management area, 820 or over the 2,630 household number in aspect of total management cost.

Cost-Benefit Analysis of The National Land Census Project and Its Policy Implications (국토센서스 사업의 비용 및 편익분석과 시사점)

  • Lee, Young-Sung;Kim, Kab-Sung;Lee, Choon-Won;Kwon, Dae-Jung;Yu, Hyeon-Ji;Yun, Hyung-Seok;Kim, Jin
    • Journal of Cadastre & Land InformatiX
    • /
    • v.49 no.2
    • /
    • pp.23-38
    • /
    • 2019
  • The National Land Census Project aims to survey the national land regularly to resolve the land category disagreement and reflect the actual land use. The objective of this study is to investigate whether not only the National Land Census Project but also related land and housing surveys bring about the improvement of social welfare in light of the invested budget, and to measure the project feasibility. The potential benefit after the National Land Census Project is not traded in the market. To determine the economic value of this potential benefit, the Contingent Valuation Method was used. This study utilized the single-bounded and double-bounded dichotomous choice models simultaneously to estimate the project feasibility of the cadastral system improvement. According to this study, cost-benefit ratio of the project was estimated larger than 1, which means that social benefits are larger than social costs.

An Economic Analysis of Land Investment for Plantations by Faustmann's Formula (Faustmann식(式)에 의(依)한 조림용(造林用) 임지(林地)의 투자지표(投資指標) 설정(設定))

  • Cho, Eung Hyouk
    • Journal of Korean Society of Forest Science
    • /
    • v.40 no.1
    • /
    • pp.19-24
    • /
    • 1978
  • The study was conducted to find out the relationship between land cost and financial yield earned by the plantations of Pinus koraiensis, Pinus densiflora and Cryptomeria japonica, and to investigate possible land investment for the given rates of return. The result of the study could be summarized as follows: 1. In the case of Pinus koraiensis plantation on site index 12, the finnancial yield was 6.4 percent when the land cost was 0.5 million Won per hectare, but the yield was reduced to 2.1 percent when the cost was 2.5 million Won. It would be therefore necessary for inducing plantation investment to raise financial yield by control of forest land price. 2. The financial yield on land of zero expectation value, in other words, internal rate of return of land investment was estimated at 10 percent. If the opportunity cost of forest land is higher than this, the economic plantation is not visible even though the land is free. 3. With the expected financial yield of 3 percent, the possible land investment of poor sites was estimated at 1.24, 0.28 and 0.80 million Won per hectare for the plantation of Pinus koraiensis, Pinus densiflora and Cryptomeria japonica, respectively. In any case, however, land cost could not be over 3 million Won per hectare. 4. The rate earned from forest land investment was generally less than 10 percent. Therefore, the annual interest rate in forestry could not be higher than this, and hopeful rate is not exceeding 6 percent.

  • PDF

Emergy evaluation of the optimum number of stories of new apartment buildings (아파트의 적정 건설층수 결정을 위한 에머지(emergy)평가)

  • Im Jung-Hyuk;Kang Dae-Seok;Lee Suk-Mo
    • Journal of Environmental Science International
    • /
    • v.14 no.5
    • /
    • pp.473-480
    • /
    • 2005
  • The cost of the construction and management of new apartment buildings was evaluated using a monetary analysis and an emergy concept to provide a new perspective regarding the housing policy of Korea. The systems of analyses were typical apartment buildings with an area of $76.03m^2$ per household in Korea built on the same size of land area. Three apartment buildings with different stories were evaluated and compared; 5-story, 15-story, and 20-story apartment buildings. The durable years of those apartments were assumed to be 40 years. The total cost of the construction and management of an apartment building was divided into three categories of construction, land purchase, and management. A 20-story apartment showed the highest cost and a 15-story apartment the lowest in the monetary cost analysis. In contrast, the emergy evaluation revealed a different pattern in the cost of construction and management, the cost increasing from a 5-story apartment to a 20-story one. This means that the higher the apartment constructed, the greater the cost in terms of real wealth. This result suggests that new evaluation methodologies like the emergy analysis should be used together with the monetary analysis to provide better insights on the national housing policy.

Landuse classifications from Thematic Mapper Images Using a Maximum Likelihood Method (위성영상을 이용한 토지이용분류에 관한 연구)

  • 박희성;박승우
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1998.10a
    • /
    • pp.366-369
    • /
    • 1998
  • To get the knowledge of land uses for watersheds, Thematic Mapper image from Landsat 5 satellite was used. The image was classified into land covers/uses by maximum likelihood classification technique. Land uses from the satellite image in this study was compared with those from the topographical map in previous. It was found that Land uses from the satellite image had a good reflection of real situations and more advantage in the reduction of time and cost.

  • PDF

The Impact of Plan Characteristics of Residential Land Development Project on Inner Land Price Change (택지개발사업의 계획특성이 사업지구 지가변동에 미치는 영향)

  • Jang, In-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.8
    • /
    • pp.698-705
    • /
    • 2016
  • The purpose of this study is to analyze the impact which the plan characteristics of Residential Land Development Projects have on land price changes in the project district and to derive policy implications for the efficient promotion of these projects. For this purpose, we analyzed the promotion land price change progress of Residential Land Development Projects step-by-step. After theoretical consideration and a review of the references, 16 plan characteristics of Residential Land Development Projects affecting land price changes were selected ((1) The rate of land price change, (2) Business area, (3) Residential land ratio, (4) Commercial land ratio, (5) Semi-residential land ratio, (6) Neighborhood facilities land ratio, (7) Apartment house ratio, (8) Street ratio, (9) Park & green ratio, (10) Ratio of land for schools, (11) Site development cost for $1m^2$, (12) General residential area ratio, (13) Semi-residential area ratio, (14) Commercial area ratio, (15) Semi-Industrial area ratio, and Natural green area ratio). We used SPSS Version 20.0 to analyze the impact of the 16 selected plan characteristics on the land price changes. As a result, it was found that the land price began to rise two years (before/after?) the appointment of the district and became stabilized after the completion of the project. The plan characteristics that affect the land price changes were found to be the (2) Business area, (4) Commercial land ratio, (6) Neighborhood facilities land ratio, (8) Street ratio, (11) Site development cost for $1m^2$, and (12) General residential area ratio.

Factors That Affect Project Time and Cost Performance during Highway Construction Using Incentive/Disincentive Provisions

  • Pyeon, Jae-Ho;Park, Moonseo;Jung, Sangsun;Park, Taeho
    • Land and Housing Review
    • /
    • v.11 no.4
    • /
    • pp.115-124
    • /
    • 2020
  • Incentive/Disincentive (I/D) contract is designed for minimizing any disruption of traffic flow in road construction projects. I/D contracting projects have been evaluated with regard to time and cost performance in various states, more than 35 states. However, construction project managers and planners have little understanding of the project factors that affect the project time and cost performance of highway construction projects using I/D regulations. Therefore, the purpose of this research is to find factors that affect I/D project success or failure to improve the decision-making process for the implementation of I/D projects. In order to achieve the objectives of this research, the researchers collected I/D road construction project data from FDOT and performed evaluation for each collected project. Then, project data analysis to identify key factors that affect I/D project performance was performed. In conclusion, five significant factors for project time performance and six significant factors for project cost perfornace were identified and summarized.

Development of a sustainable land-based Gracilaria cultivation system

  • Kim, Jang K.;Yarish, Charles
    • ALGAE
    • /
    • v.29 no.3
    • /
    • pp.217-225
    • /
    • 2014
  • Land-based seaweed (Gracilaria) cultivation systems may provide products with high quality and biosafety for human consumption, as well as for other high value applications. However, a limitation for this land based system is high management costs. The objective of this study was to determine if the management costs for Gracilaria cultivation can be reduced without a decrease in productivity by using $CO_2$ injection along with a high stocking density and high photosynthetically active radiation (PAR), and commercially available fertilizers. When Gracilaria tikvahiae was cultivated at a high stocking density and high PAR, coupled with $CO_2$ enhancement, the productivity was significantly higher than that at a lower stocking density, low light without $CO_2$ injection. We also found that G. tikvahiae grown in a medium of commercially available fertilizer (Jack's Special, JS) showed a similar growth rate and productivity to that grown in von Stosch's enriched (VSE) seawater, while the cost for JS media is only 2% of the cost for VSE. These results suggest that $CO_2$ injection and commercial fertilizer may be a potential way to provide sustainability in land-based Gracilaria cultivation systems.