• Title/Summary/Keyword: Korean Apartment

Search Result 3,252, Processing Time 0.056 seconds

A Pre-Hospital Cardiac Arrest Patient Surviving after Dispather-Assisted Defibrillation by an Untrained Witness (응급의료전화상담원의 도움에 의해 교육 받지 않은 목격자의 제세동 시행 후 생존한 병원 전 심정지 1례)

  • Kim, Jong-Ho;Moon, Jun-Dong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.4
    • /
    • pp.239-244
    • /
    • 2018
  • A 59-year-old man with no specific medical or family history complained of chest pain and became unconscious. A member of his family, who was a witness, called 119 and gave him dispatcher-assisted cardiopulmonary resuscitation, followed by defibrillation using an automated external defibrillator placed in his apartment. Afterward, he was given two sessions of defibrillation by the 119 emergency squad, then transferred to an emergency medical center with the return of spontaneous circulation. The patient was discharged with cerebral performance category (CPC) 1 15 days later. While dispatcher-assisted cardiopulmonary resuscitation and defibrillation is at its beginning stage in South Korea, this case seems to demonstrate its effectiveness. Moreover, this case suggests it can be particularly useful for helping untrained witnesses use an automated external defibrillator, which may have important implications in regions in which there are delayed responses of the 119 emergency squad to the site. It is also important to develop a plan for improving witness access to and quantitative supply of the South Korean public access defibrillation (PAD) program.

A Study on Feasibility and Applicability of Pneumatic Waste Collection System (쓰레기 수송관로 방식의 적용사례 및 실용에 관한 연구)

  • 민병균;이재영;최상일
    • Journal of Korea Soil Environment Society
    • /
    • v.2 no.1
    • /
    • pp.109-117
    • /
    • 1997
  • The dust chute was a part of equipment in apartment which have been settled down as new residential style in this country since 1960s. However, the dust chute was destructed by results of social discussion, and it ended up old remains which cannot be found in new towns. Nowadays, chute was substituted a collecting system from extra collecting sites which were prepared near residential area. This phenomenon was caused by the poor separating collection. Since the early part of 1995, the whole vocal operating the volume-base charge system has been placed as the institution capable of recycling and separating collection of residential wastes in this country. People pursue the residential quality which is suitable to the Greenround period. Such a diverse effort corresponding to the social change can be also accomplished in the field of waste collecting transportation. In this paper, the local heating system and waste combustion site and hollow are already applied to the new residential area in the form of housing development. After investigating of the waste collecting transportation method in other countries related to such facilities, this paper represents the feasibility and applicability of pneumatic waste collection system which is used practically in the new housing complex and large facilities in other countries.

  • PDF

A Study on Public Rental Housing for Young Generation Utilizing an Alternative Investment of National Pension Fund: Using Apartment Trading Data on Seoul Metropolitan Area from 2011 to 2016 (국민연금기금의 대체투자를 통한 청년층 공공임대주택 공급 후보지 분석: 2011-2016년 수도권 아파트 거래 자료를 토대로)

  • Cho, SeongAh;Hong, Yeryun;Lee, Seongmin;Shin, Hyu-Seok
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.21 no.2
    • /
    • pp.156-172
    • /
    • 2018
  • Recently, Korea suffered serious social conflicts between generations due to population aging. Anxiety about depletion of the National Pension Fund is one of the social problem to young generation, because of the uncertainty that they will not able to receive the pension they paid. At the same time, due to the high housing rent in Seoul metropolitan area, the demand for housing welfare and supply of public rental housing for young generation was increased. There are some opinions about using National Pension Fund to supplying public rental houses in the society. In this research, we were concentrated on finding the suitable areas for the public rental house using National Pension Fund. First, verifying the validity of the investment using National Pension Fund for the public rental housing was done. And spatial statistical methods were applied to explore the suitable areas for the public rental housing in Seoul metro area. Finally, this study divided young people into three groups and analyzed ways to supply public rental housing for each group in proper areas by their demand. This research's ultimate goals are mitigating the conflicts between the generations and achieving both profitability and publicness of National Pension Fund.

The PM2.5 Concentration and Components Characteristics in Miryang (밀양지역의 PM2.5 농도 및 성분특성)

  • Suh, Jeong-Min;Kim, Young-Sik;Jeon, Bo-Kyung;Choi, Kum-Chan;Ryu, Jae-Yong;Park, Jeong-Ho
    • Journal of Environmental Science International
    • /
    • v.16 no.12
    • /
    • pp.1355-1367
    • /
    • 2007
  • This study summarizes the relations among $PM_{2.5}$ concentration, water-soluble ions concentration, metallic element Components characteristics and SPSS in negative ion and metallic element of $PM_{2.5}$ particle in Miryang.(By the urban area, the industrial complex area and the suburban area according to the season) $PM_{2.5}$ concentration of total 72 samples collected from 3 sites turned out to range from 3.47 to 34.7 ${\mu}g/m^3$, and the average concentration was the suburban area-the kin nup(16.00 ${\mu}g/m^3$) > the urban area-the roof of the old Miryang university(10.32 ${\mu}g/m^3$) > the industrial complex-Sapo industrial complex(10.29 ${\mu}g/m^3$). In particular, the suburban area had $PM_{2.5}$ concentration 1.5 times those of urban area, industrial complex. It was thought although the site was suburban and farm-side without pollutants around, it had a higher concentration value influenced by external factors including the brickyard, small-scale incinerator, driving range construction, construction on the Daegu-Busan express and the widening of the four-lane road between Miryang-Anyang nearby. As for water-soluble ions among $PM_{2.5}$ particle collected in Miryang area, $SO4_{2^-}$ accounted for 60% and $NO_{3^-}$, was 30% in spring and summer. And $NO_{3^-}$ accounted for 50% and $SO4_{2^-}$ was 35% in fall and winter. The AI value of metallic Components among $PM_{2.5}$ particle collected in Miryang area had a high value influenced by the apartment complex construction and the extension work of road. The industrial complex area had Zn concentration 3 times, and Fe concentration 2 times those of urban area and suburb area. When it comes to the relation with metallic elements in urban area, the highest coefficient of correlation was between Cr-Fe with 0.85, and Pb-Cd turned out in the reverse correlation. Among metallic elements, the coefficients of correlation between Zn and Cr, Mn, Fe, NI were high in industrial complex area. The highest coefficient of correlation was between Mn-Zn with 0.88, meanwhile Ni and Cu, Cd turned out in the reverse correlation in the suburb area. These coefficients of correlation are attributed to the difference in pollutant sources, rather than difference in pollutant and non-pollutant.

A Competitive Advantage Analysis of Construction Duration through the Comparison of Actual Data of Domestic Construction Firms - Focused on Mix-Use Residential Building and Officetel Building - (건설사별 공기비교를 통한 공기경쟁력 분석 - 주상복합 및 오피스텔 건물을 중심으로 -)

  • Ryu, Han-Guk;Kim, Sun-Kuk;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.138-147
    • /
    • 2006
  • Construction companies have been interested in the construction duration which importantly affects the performance and the success of the construction projects in accordance with the systemic changes such as five days per week system, introduction of construction duration reduction bidding system and post sale system nowadays. It is also very important to estimate and forecast properly the construction duration as the construction companies compete for the projects in the situation of construction market reduction and the lowest bidding system. Recognizing the importance about the construction duration, the researches about comparing and analyzing or estiamting the construction duration have been performed. However, comparing studies about the construction duraion have been limited to the apartment and office building in domestic area. Many studies about forecasting construction duration have been performed through stochastic analysis and simulations. Little research has been addressed the comparison analysis of the real construction duration about the mix-use building and officetel building which occured according to the changes of the building requirements. Therefore, the objective of this study is to compare and analyze the real construction duration and the hypothetical construction duration about the mix-use building and officetel building of the domestic companies. Moreover, we select the most competitve construction company to get the strengths and analyze the competitive advatages of the construction companies about construction duration.

Development of Optimal TACT Process for Eco-Friendly Demolition Works in Aged Housing Remodeling - Focus on Case Study - (친환경 리모델링 철거공사의 최적 TACT공정 개발 - 사례연구를 중심으로 -)

  • Woo, Joong-Pyung;Kim, Ki-Hyun;Hwang, Young-Gyu;Kim, Kyung-Rai;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.3-12
    • /
    • 2011
  • Technology based civilization has made a sustained advancement, resulting in economic growth and material prosperity. The outcome was the beginning of environmental destruction. Especially, in regard to construction, it has been recognized as a key culprit for pollution. As such, the construction industry has recently shown interest in the environment, as it has been applying environment friendly method of construction and reducing wastes. As the number of old common housing increases in our country, reconstruction and remodeling are implemented as a means of improvement. However, it can be said that remodeling is the inevitable option because of cost and environmental problems associated with reconstruction. As part of its feature, remodeling work is preceded by removal work. And, removal work inevitably creates construction wastes. Treatment of wastes that takes into consideration environmental aspects is important and for this, removal work that is based on environment friendly remodeling to ensure selective separation must be implemented. Yet, a removal work based on environment friendly remodeling has a lower level of output compared to existing methods. Because remodeling work by its nature has a post construction work which proceeds after it, securing work efficiency is important as the removal work is a critical path activity. Thus, the present study improves the work process of a removal work that is based on environment friendly remodeling so that it becomes a work process that includes work efficiency. For this, as a case study, old common housing has been selected, and a TACT process has been developed which is based on data acquired from environment friendly removal work. And, this study develops an optimal TACT process which is based on environment friendly remodeling by conducting a simulation for a 15 floor apartment.

Economic Evaluation of Eco-friendly Demolition Work and Case study in Remodeling Project (친환경 리모델링 철거공사의 경제성 평가 및 사례적용)

  • Kim, Yoon-Duk;Kim, Ki-Hyun;Cha, Hee-Sung;Kim, Kyung-Rai;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.45-53
    • /
    • 2010
  • When increasing quantity of construction wastes, how to deal with construction wastes and environmental problems relating to disposal of construction wastes are discussed as social issues, treatment of construction waste and subsidiary issues are raised as important problems. The demolition work produce construction wastes most in construction industry. Various researches on eco-friendly treatment of construction wastes, recycling rates and recycled materials were conducted aspect of sustainability in developed countries, however, domestic remodeling projects were performed demolition work with first-demolition and second-classification method which emphasize productivity focused on efficiency. It caused not only environmental problems, but also economical problems such as increasing disposal cost of construction wastes. Solving these problems, the previous study, suggested the process model of eco-friendly demolition work to recycle materials. This paper applied eco-friendly remodeling process to practical projects and economic feasibility on eco-friendly remodeling process. Moreover these results expect to contribute the revitalization of eco-friendly demolition work in remodeling projects.

Technical Proposal based Bidding System Applying the Concept of the Lowest Total Combined Bid Price for Supplying Affordable Housing (최저통합환산가격 개념을 적용한 기술제안 기반 입찰제도)

  • Cho, Gun-Hee;Kang, Seung-Hee;Lee, Jeong-Seok;Sohn, Jeong-Rak;Bang, Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.94-105
    • /
    • 2010
  • Recently, resettlement problems of low income groups in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). There are several approaches for supplying affordable housing and one of these is the bidding system which can reduce construction cost. However, the lowest bidding system has many problems such as dumping and substandard quality. In this context, this study proposed bidding system based on technical proposal applying the concept of the lowest total combined bid price for optimization of bid price, reduction of construction cost and period, and maintenance of suitable quality. This bidding system embraces the best value and cost plus time concept on the basis of an improved lowest price bidding system. It consists of the following components: work unit based, project unit based, and period reducing technical proposals. The proposed bidding system for determining bidders are designed to evaluate the adequacy of each technical proposal in the order of the combined minimum price in an effort to effectively optimize bid prices and reduce the construction periods, as well as to maintain a minimum appropriate quality.

A Study on the Application of Zero Rate of V.A.T. to National Housing Supply and Construction Service (국민주택 공급 및 건설용역에 대한 부가가치세 영세율 적용에 관한 연구)

  • Noh, Kye-Won;Hwang, Uk-Sun;Lee, Jong-Gwang;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.64-73
    • /
    • 2010
  • The stagnation of unsold houses is recently aggravated due to domestic and overseas crisis of finance and real-sector economy and domestic housing construction is in serious difficulty. Thus, tax support is necessary for national housing construction. Due to the current tax exemption system of national housing, V.A.T. paid in the construction of national housing is not deducted. Namely, it is ascribed to consumer as it is reflected in the construction cost. This research intends to analyze the limit of V.A.T. tax exemption system, to present the necessity of applying zero rate and to calculate the scale of non-deduction of V.A.T. purchase tax amount for national housing by analyzing the construction site of apartment house of house constructor in order to analyze the effect of zero rate when it is applied on the basis of above ground. In the zero rate system, V.A.T. is not collected from the consumers like the present tax exemption system. However, the purchase tax amount borne in the construction of national housing is deducted totally. As purchase tax is deducted, constructor will promote supplying national housing thanks to the effect of solving financial difficulties and improving liquidity. Since the architecture cost and parceling-out price can be lowered due to the improved liquidity of constructor, the policy will actually help the people without house.

Method of Quantity Data Analysis for Building Construction Cost Estimation : Focusing on Finish Work of Public Apartment Project (공사비 예측을 위한 수량기반 데이터 분석방법 : 공공 아파트 수장공사 중심으로)

  • Ji, Sae-Hyun;Park, Moon-Seo;Lee, Hyun-Soo;Seong, Ki-Hoon;Yoon, You-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.235-243
    • /
    • 2008
  • Construction projects have unique characteristics that these may be carried out by contractors thus, cost should be estimated before execution. The importance of cost estimation and cost check has become increasingly emphasized in all phases of construction project that would be performed numerously. It is needed that owner have to estimate reasonable budget, and contractor should predict the bid price. However, there are lack of standard cost estimation method before quantity takeoff, cost analysis method, and cost database thus, the method of area cost, such as square foot method, is as used as ever in Korea. Therefore, this research suggested standard cost database structure CUBE, and analysis method of item quantity per one household categorized by area type. Whereafter, database of all item quantity of finish work has been built with 90 building cost data, and validated it's availability. In this respect, the suggested method and the findings from this research are expected to help enhancing the efficiency and productivity of cost estimation in Korea.