• Title/Summary/Keyword: K공사

Search Result 2,778, Processing Time 0.031 seconds

Development of Virtual Construction Equipment Simulation System Based on BIM for Civil Engineering Project (토목시설물에 대한 BIM 기반 가상건설 장비 시뮬레이션 시스템 개발)

  • Kim, Sung-Hoon;Yoon, Young-Cheol;Joo, Cheol-Beom;Yoon, Dong-Ju
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.3
    • /
    • pp.223-230
    • /
    • 2017
  • BIM(building information modeling) has been actively applied to construction industries and to maximize its application through the life cycle of structure, various relevant technologies have been proposed. In particular, 4D sequencing management and 5D cost-related management were introduced as an improved version of the design review and interface control by 3D information design. On the other hand, the virtual construction using virtual construction equipment can sophisticatedly handle capacity, dynamic movement, collision boundaries of actual construction machines but it still stays at a low level in a technical sense. In this study, simulation systems based on BIM involving virtual construction equipment have been developed; then it is applied to the actual construction project to evaluate the safety and efficiency of construction equipments. It was confirmed that the simulation systems can be utilized to construct virtual construction site by using an effective 3D library of construction equipment and can plays a key role to secure construction safety and economic feasibility. Specifically, the simulation system are very useful for decision making by construction managers to select the optimum equipment and construction method with a better understanding for safety and cost-saving.

Numerical Analysis of Retaining Wall Considering Supporting Load of Adjacent Retaining Wall (인접 흙막이 구조물의 지보재 하중을 고려한 가시설의 수치해석)

  • Yoo, Chanho;You, Jaemin;Lee, Seungjoo;Hwang, Jungsoon;Baek, Seungcheol
    • Journal of the Korean GEO-environmental Society
    • /
    • v.19 no.1
    • /
    • pp.31-36
    • /
    • 2018
  • Recently, as the building construction works have been activated, the environment in which the excavation work is proceeding in parallel with the existing structure and the adjacent excavation work is increasing. However, there is not a lot of research on this. In this study, numerical analysis was carried out for interaction analysis between former excavation construction and follow-up excavation on two excavation retaining structures in parallel with excavation. As a result of numerical analysis, if the supporting load of strut is not considered, it was analyzed that the displacement distribution in the structure can be underestimated and acting stress of strut is overestimated. It was analyzed that the support stress causes by the former excavation should be considered in order to simulate the actual behavior characteristic.

An Experimental Study on the Mechanical Impact (Third Party Damage) of High Pressure Gas Pipe (고압가스배관의 기계적 충격(타공사)에 대한 실험적 연구)

  • Lee, Kyung-eun;Kim, Jeong Hwan;Ha, Yu-jin;Kil, Seong-he
    • Journal of the Korean Institute of Gas
    • /
    • v.21 no.6
    • /
    • pp.8-14
    • /
    • 2017
  • One of the main causes of gas pipeline accidents is mechanical impact(third party damage). The majority of high pressure gas pipelines buried in major domestic industrial complexes are old pipes which have being operated over 20 years. Therefore, if an accident occurs, there will be a full scale accident because there is no additional inspection and reinforcement time. In this study, the defects on the piping during the mechanical impact were studied through the third party damage(excavation) experiments. Experiments were carried out using the 21 ton excavator which is operated in the actual excavation work and the type of pipe to be struck are ASTM A106 Grade.B and ASTM A53 Grade.B. As a result, when the bucket used during excavator operation is a sawtooth bucket, the defect is more bigger. And the smaller the diameter of the pipe, the smaller the depth and length of the defect. Also, it was confirmed that the impact height had no effect on the defects on the buried pipe, during the excavation work.

Process Planning for Finishing Works of High-rise Residential Buildings Project (고층 공동주택 마감공사의 공정계획 프로세스)

  • Baek, Tae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.110-117
    • /
    • 2017
  • In the construction of high-rise residential buildings in which the finishing works are done repetitively in each housing unit, the construction period and cost can be reduced, while maintaining the quality, if the work process is properly managed in order for the resources to be input continuously. Time management methods such as the Bar Chart, CPM and LOB are not appropriate, due to the difficulties involved in the diagraming of repetitive works and applying them to the project. The Tact method also has difficulties in maintaining a constant work flow and needs significant effort and cooperation from the subcontractors to allocate the resources consistently. Partitioning, base works for finishing, floor mortar plastering and the final finishing work are done sequentially in residential buildings projects, and there are many repetitive activities which differ in terms of the work method, work area and productivity. If these repetitive activities are synchronized or converged toward the last work area, the goal of process management can be achieved effectively. Therefore, a process planning method for the finishing works of residential building projects is proposed, which takes into consideration elements, such as the sequential relation between the activities in each housing unit and classification of repetitive works in terms of their management method, work area and production rate, for the continuous input of resources into the housing units.

Development of Construction Benchmarking for Oversea Industrial Projects (해외플랜트 공사 벤치마킹 프로그램 개발)

  • Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.1165-1171
    • /
    • 2013
  • The oversea construction contract amount has sharply increased since 2003. The contractor's capability for EPC and project management is a key factor for a successful industrial construction project. Construction performance measurement and evaluation is needed to improve contractor's project management capability. Therefore, this paper proposes the construction performance benchmarking program for oversea industrial projects. Performance metrics consists of project cost, schedule, quality, and safety. Data from 10 oversea industrial projects were collected and analyzed. Also, this paper describes the process for development of the benchmarking program and lessons learned from industry are summarized. Finally, this paper recommends how sustainable benchmarking program should be established and implemented.

Standardization Research on Drone Image Metadata in the Agricultural Field (농업분야 드론영상 메타데이터 표준화 연구)

  • Won-Hui Lee;Seung-Hun Bae;Jin Kim;Young Jae Lee;Keo Bae Lim
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.3
    • /
    • pp.293-302
    • /
    • 2023
  • This study examines and proposes standardization approaches to address the heterogeneous issues of metadata in drone imagery within the agricultural sector. Image metadata comes in various formats depending on different camera manufacturers, with most utilizing EXIF and XMP. The metadata of cameras used in fixed-wing and rotary-wing platforms, along with the metadata requirements in image alignment software, were analyzed for sensors like DJI XT2, MicaSense RedEdge-M, and Sentera Double4K. In the agricultural domain, multispectral imagery is crucial for vegetation analysis, making the provision of such imagery essential. Based on Pix4D SW, a comparative analysis of metadata attributes was performed, and necessary elements were compiled and presented as a proposed standardization (draft) in the form of tag information.

A Study on Project Information Integrated Management Measures Using Life Cycle Information in Road Construction Projects (도로건설사업의 생애주기별 정보를 이용한 건설사업정보 통합관리방안 연구)

  • Kim, Seong-Jin;Kim, Bum-Soo;Kim, Tae-Hak;Kim, Nam-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.11
    • /
    • pp.208-216
    • /
    • 2019
  • Construction projects generate a massive amount of diverse information. It takes at least five years to more than 10 years to complete, so it is important to manage the information on a project's history, including processes and costs. Furthermore, it is necessary to determine if construction projects have been carried out according to the planned goals, and to convert a construction information management system (CALS) into a virtuous cycle. It is easy to ensure integrated information management in private construction projects because constructors can take care of the whole process (from planning to completion), whereas it is difficult for public construction projects because various agencies are involved in the projects. A CALS manages the project information of public road construction, but that information is managed according to CALS subsystems, resulting in disconnected information among the subsystems, and making it impossible to monitor integrated information. Thus, this study proposes integrated information management measures to ensure comprehensive management of the information generated during the construction life cycle. To that end, a CALS is improved by standardizing and integrating the system database, integrating the individually managed user information, and connecting the system with the Dbrain tool, which collectively builds artificial intelligence, to ensure information management based on the project budget.

Alternative Evaluation Model for Tower Crane Operation Plan in Modular Construction - Focusing on Modular Unit Installation and Finishing works - (모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 -)

  • Kim, Joo Ho;Park, Moonseo;Lee, Hyun-Soo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.50-60
    • /
    • 2018
  • Recently, modular construction method has been widely applied to projects with repetitive processes including dormitory, the residential facility, and the hotel construction due to reduced labor input and shortened construction schedule. Generally, about 40% of total on-site construction cost excluding unit installation cost, is put on exterior finishing work, and thus management of finishing work is deemed important in maintaining the targeted schedule and cost. Since limited equipment is shared so that subsequent activities are not affected while carrying out on-site installation and finishing work, lifting plan becomes more important for modular projects with greater portion of finishing work load. In this regard, tower crane operation plan may take the form of a single cycle or multiple cycles in which equipment efficiency can be affected. However, difficulties exist in evaluating alternatives to tower crane operation plans supporting unit installation and finishing work. Therefore, this study aims to evaluate the alternative of tower crane operation method according to the cyclic period setting in modular building site to determine the effect on T/C uptime and process by parameterizing lifting time for unit and exterior finishing material, lift cycle for unit and exterior finishing material and time required for finishing work. Accordingly, this study develops a simulation model that can increase the tower crane efficiency by controlling the work speed. An academic contribution of this study is to suggest a resource leveling method applying the concept of lifting cycle, and further is expected to be managerially used as a basis for an alternative evaluation of equipment plan.

An Implementation of Construction Machine Noise Simulation System (건설 장비 소음 예측 시스템의 구현)

  • Lee, Jung-Hwan;Kim, Ju-Ryong;Seo, Jeong-Min
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2011.01a
    • /
    • pp.21-24
    • /
    • 2011
  • 일반적으로 공사현장에서 발생하는 건설소음은 주변 생활환경을 해치는 중요한 원인으로 대두되고 있으며, 최근에는 건설공사 주변에 거주하는 주민들로부터 많은 민원을 낳고 있다. 따라서 최근에는 각종 공사 시 설계 및 시공단계에서부터 건설 소음에 대한 영향평가를 실시하여 규제기준치를 초과하면 방음벽 설치나 기타 방음 대책 등에 대한 적극적인 검토 및 보완을 요구하고 있다. 이러한 관점에서 본 연구는 건설 현장고 인접해 사업계획 승인단계에 있는 현장을 대상으로 음향시뮬레이션 프로그램을 이용하여 건설 소음도를 예측하였다. 이러한 연구는 향후 각종 건설 현장과 소음 영향평가, 방음대책 수립 시 중요한 자료를 제공할 시스템으로 예상된다.

  • PDF

Construction and Design of 3.3kV Submarine Cable (3.3kV급 해저케이블의 설계와 포설공사)

  • Oh, Jae-Hyung;Hong, Chan-Jin;Kwon, Shin-Nam;Park, Joo-Ho;Sung, Hee-Jin;Park, Dae-Hee
    • Proceedings of the KIEE Conference
    • /
    • 1997.07e
    • /
    • pp.1651-1653
    • /
    • 1997
  • 본 보고는 육지로부터 1.1km 떨어진 하섬에 전력, 통신, 제어케이블을 각각 포설공사한 결과이다. 먼저 포설공사전에 Route의 유속과 수심, 해저면등의 조건을 각각 측정하였다. 하섬의 부하를 계산하고 케이블의 전압 및 허용전류등을 계산한후에 해저 직매에 적합한 구조 및 수밀특성을 향상시키는 설계를 하였다. 또한, 시이즈의 표면은 포설시에 손상을 줄이기 위하여 Smooth형으로 제조하였다. 포설은 전력, 제어, 통신케이블을 동시에 직매식으로 최단시간내에 수행하는 공사를 하였으며, 케이블의 진단은 직류전압법에 의한 전류특성으로 평가하였다.

  • PDF