• Title/Summary/Keyword: Information Breakdown Structure

Search Result 188, Processing Time 0.037 seconds

On Physical Security Threat Breakdown Structure for Data Center Physical Security Level Up (데이터센터 물리 보안 수준 향상을 위한 물리보안 위협 분할도(PS-TBS)개발 연구)

  • Bae, Chun-sock;Goh, Sung-cheol
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.29 no.2
    • /
    • pp.439-449
    • /
    • 2019
  • The development of information technology represented by ICBMA (IoT, Cloud, Big Data, Mobile, AI), is leading to a surge in data and a numerical and quantitative increase in data centers to accommodate it. As the data center is recognized as a social infrastructure, It is very important to identify physical security threats in advance in order to secure safety, such as responding to a terrorist attack. In this paper, we develop physical security threat breakdown structure (PS-TBS) for easy identification and classification of threats, and verify the feasibility and effectiveness of the PS-TBS through expert questionnaires. In addition, we intend to contribute to the improvement of physical security level by practical use in detailed definition on items of PS-TBS.

Fabrication of FIPOS-SOI Using $n/p^+/p$ Structure ($n/p^+/p$구조를 이용한 FIPOS-SOI의 제조)

  • 양천순;이종현
    • Journal of the Korean Institute of Telematics and Electronics
    • /
    • v.26 no.12
    • /
    • pp.2010-2015
    • /
    • 1989
  • A SOI was fabricated by the FIPOS technique using n/p+/p silicon structure. Fabricated silicon island which has 3\ulcorner thickness and 100\ulcorner width was investigated by measuring van der Pauw resistivity, Hall mobility, dielectric breakdown voltage and leakage current. Hall mobility of the SOI was measured to be 300-500cm\ulcornerV.sec and its breakdown field was 1-2 MV/cm. The cross-sectional geometries of the SOI island were examined by SEM and optical microscope.

  • PDF

A Model of Work Breakdown Structure for being applied to Historical Data in BTL Project for Educational Facilities (교육시설 BTL 사업의 실적공사비 적용을 위한 작업분류체계(WBS) 구축)

  • Kim, Sung-Kyum;Cho, Chang-Yeon;Son, Jae-Ho;Kim, Jae-On
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.499-502
    • /
    • 2007
  • The government abolished the existing method to calculate the construction price by the quantity take-off and pricing. It has introduced a new estimating system which uses the actual cost data on the basis of actual contract unit price. However, in the case of the current method to calculate the estimate price of BTL educational facilities, it is difficult to prepare an accurate ground for calculating unit prices due to a lack of standardized work breakdown structure (WBS) and guidelines for the detailed bidding documents. Thus, this research aims to establish WBS using the actual construction price on the basis of the actual bidding documents for the previous construction of BTL educational facilities. This specific WBS can be differentiated from the general WBS which is not suited for construction of the educational facility. It makes possible to build the construction information classification system and it helps to systemize the maintenance and repair cost items.

  • PDF

Conceptual WBS Model for a Large-Scale Information System Acquisition Project (대규모 정보시스템 개발 프로젝트를 위한 개념적 작업분담구조도의 모형화에 관한 연구)

  • Nam Yong Lee
    • The Journal of Society for e-Business Studies
    • /
    • v.6 no.1
    • /
    • pp.55-67
    • /
    • 2001
  • Over the past decade, the topic of work breakdown structure (WBS) has gained an increasing amount of attention from information technology Professionals as an effective tool for managing the complexity of a large-scale information system development project. It is a method for planning and controlling a large-scale information system development. A WBS provides the basis for project organization, cost estimation, task scheduling, and contract management. Based on the authors' practical experience, this paper discusses how to establish a specific WBS and some considerations for developing a well-defined WBS. The model of WBS suggested in this study will provide useful insight and guidelines for establishing the spec-ific WBS for a large-scale information systems development.

  • PDF

Project Management Information System Using Work Breakdown Structure (업무분할체계를 이용한 사업관리정보시스템)

  • 이정구
    • Proceedings of the Korea Society for Industrial Systems Conference
    • /
    • 1997.11a
    • /
    • pp.303-320
    • /
    • 1997
  • In A institute, project managers present quarterly project performance report according to institute's law. In quarterly project performance report, progress of project performance and budget expended should be written. Progress of project performance and progress of budget expended are key management factors in A institute. Because financial database system Is already constructed, progress of budget expended is got from information system. But the progress of project performance that project manager estimate subjectively can not be judged of its correctness because there is not project management information system that is able to calculate the progress of project performance systematically. In this study, we present the project management system assign all activities to every project participator according to their work share rate using WBS(Work Breakdown Structure) and calculate the progress of project performance systematically Also we construct project management information system for above project management system implementing.

  • PDF

Apartment house project cost schedule for integrated management BIM-based BoQ application plan (공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안)

  • Zheng, Lianyi;Kim, Woong-Gi;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.11 no.2
    • /
    • pp.1-16
    • /
    • 2021
  • Since entering the 21st century, the construction industry has developed faster and faster, and more and more technologies have been applied in the construction industry. BIM technology (Building Information Modeling) was born in this environment. The application of BIM technology can greatly improve the efficiency of cost management and help achieve the goal of cost management. But through BIM to realize project cost management, there is still no good solution. In order to solve this problem, this paper puts forward the concept of WBS structure applied to construction projects by studying the BoQ (Bill of Quantities) list based on BIM, and proposes the numbering method of the structure. The WBS (Work Breakdown Structure) structure proposed in this paper divides more than 5000 cost objects into 133 projects according to the type of work and project schedule. This structure helps to realize the application of BIM in project cost management. Although this article has studied more than 5000 data of three projects, it does not think that it can cover all cost objects in the existing construction industry. The purpose of this article is to propose a solution for cost and Process Control using BIM-based BoQ data.

Establishment of WBS·CBS-based Construction Information Classification System for Efficient Construction Cost Analysis and Prediction of High-tech Facilities (하이테크 공장의 효율적 건설 사업비 분석 및 예측을 위한 WBS·CBS 기반 건설정보 분류체계 구축)

  • Choi, Seong Hoon;Kim, Jinchul;Kwon, Soonwook
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.8
    • /
    • pp.356-366
    • /
    • 2021
  • The high-tech industry, a leader in the national economy, has a larger investment cost compared to general buildings, a shorter construction period, and requires continuous investment. Therefore, accurate construction cost prediction and quick decision-making are important factors for efficient cost and process management. Overseas, the construction information classification system has been standardized since 1980 and has been continuously developed, improving construction productivity by systematically collecting and utilizing project life cycle information. At domestic construction sites, attempts have been made to standardize the classification system of construction information, but it is difficult to achieve continuous standardization and systematization due to the absence of a standardization body and differences in cost and process management methods for each construction company. Particular, in the case of the high-tech industry, the standardization and systematization level of the construction information classification system for high-tech facility construction is very low due to problems such as large scale, numerous types of work, complex construction and security. Therefore, the purpose of this study is to construct a construction information classification system suitable for high-tech facility construction through collection, classification, and analysis of related project data constructed in Korea. Based on the WBS (Work Breakdown Structure) and CBS (Cost Breakdown Structure) classified and analyzed through this study, a code system through hierarchical classification was proposed, and the cost model of buildings by linking WBS and CBS was three-dimensionalized and the utilized method was presented. Through this, an information classification system based on inter-relationships can be developed beyond the one-way tree structure, which is a general construction information classification system, and effects such as shortening of construction period and cost reduction will be maximized.

Information Breakdown Structure of Engineering Phase for Plant Project through Business Analysis (산업설비 업무 분석을 통한 설계단계 정보 분류체계)

  • Song, Young-Woongl;Cho, Hang-Min;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.3-15
    • /
    • 2009
  • Recently, it has increased projects in the Oil and Gas industry as growing plant of overseas construction market. Therefore, domestic companies need to set some aggressive plans up that secure competitiveness of international plant business such as enhancing productivity, technological ability and statistical management. Specifically in the Oil and Gas industry of overseas plant business requires implying information in EPC (Engineering, Procurement and Construction, below EPC) more, but it has not been suggested an appropriate breakdown system for contents that manages the information each EPC phase, which lead to problems such as revision of design document, occurring duplicated work and omissions of each participant. For these problems, we find market share decreasing and competitiveness running down. Thus, for increasing practical use of contents management system and construction industry's information, this paper suggests a contents breakdown system based on BPM (Business Process Management), defines business process and systematizing knowledge needed, and finally analyzing contents information that establish information among industrial facilities in Design phase which is the weakest part of domestic companies.

Study of performance and characteristics of InP-composite channel MHEMT for High Breakdown Voltage (높은 항복전압을 위한 InP 합성 채널 MHEMT의 성능과 특성에 대한 연구)

  • Choi, Seok-Gyu;Beak, Young-Hyun;Han, Min;Lee, Seong-Dea;Rhee, Jin-Koo
    • Proceedings of the IEEK Conference
    • /
    • 2006.06a
    • /
    • pp.467-468
    • /
    • 2006
  • To perform the comparative study, we experimented on two differential epitaxial structures, the conventional Metamorphic High Electron Mobility Transistor (MHEMT) using the InAlAs/InGaAs structure and the InP-composite channel MHEMT adopting the InAlAs/InGaAs/InP/n-InP structure. Compared to the conventional MHEMT, the InP-composite channel MHEMT shows improved breakdown performance; over about 3.5 V. This increased breakdown voltage can be explained by the lower impact ionization coefficient of the InP-composite channel MHEMT than that of the conventional MHEMT.

  • PDF

The Development of Information Breakdown Structure for Integrated Management of Water Filtration Plants (정수장 시설공사의 통합관리를 위한 시설물분류체계 개발)

  • Kim, Chang Hak;Kang, Leen Seok;Kim, Hyo Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.5
    • /
    • pp.863-869
    • /
    • 2017
  • In this study, the information breakdown structure of water purification plant has been made by classifying various the water purification methods and facilities. this can be utilized as a code system of computer for integrating information and analyzing quantitative of environmental impact and calculating cost of maintenance and energy consumption which was used during life cycle of water purification plant. Since the construction information contains many heterogeneous information, it is very important to have a code system for managing the integrated information. In addition, since water purification plant facilities are mainly composed of installation of facilities including many processes, a more detailed classification code is required. Therefore, in this study, the water purification breakdown structure which is not yet attempted in Korea was constructed by using facet classification system.