• Title/Summary/Keyword: Information Breakdown Structure

Search Result 189, Processing Time 0.028 seconds

Study of Composite channel Structure of Metamorphic HEMT for the Improved Device Characteristics (기존의 MHEMT와 InP 합성 채널 MHEMT의 소자의 항복 특성 분석 및 비교 연구)

  • Choi, Seok-Gyu;Baek, Yong-Hyun;Han, Min;Bang, Seok-Ho;Yoon, Jin-Seob;Rhee, Jin-Koo
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.44 no.12
    • /
    • pp.1-6
    • /
    • 2007
  • In this study, we have performed the channel modification of the conventional MHEMT (metamorphic high electron mobility transistor) to improve the breakdown characteristics. The Modified channel consists of the InxGal-xAs channel and the InP sub channel instead of the InxGa1-xAs channel. Since InP has the lower impact ionization coefficient in comparison with In0.53Ga0.47As, we have adopted the InP-composite channel in the modified MHEMT. We have investigated the breakdown mechanism and the RF characteristics for the conventional and the InP- composite channel MHEMTs. From the measurement results, we have obtained the enhanced on and off-state breakdown voltages of 2.4 and 5.7 V, respectively. Also, the increased RF characteristics have brought about the decreased output conductance for the InP-composite channel MHEMT. The cut-off frequency (fT) and the maximum oscillation frequency (fmax) for the InP-composite Channel MHEMT were 160 GHz and 230 GHz, respectively. It has been shown that the InP-composite channel MHEMT has the potential applications for the millimeter wave power device.

A Study on the Classification System of National Construction Project based on WBS (WBS 기반의 국책 건설사업 기록물 분류체계에 대한 연구)

  • Jeong, Ki-Ae;Jung, Kuk-Hwan;Kim, Chang-Ha
    • Journal of Information Management
    • /
    • v.41 no.1
    • /
    • pp.173-200
    • /
    • 2010
  • National construction project for SOC(Social Overhead Capital) is led by the government and invested high cost and all capabilities for long times. In general case the life times of SOC facilities are permanently. According to the long life time of the facilities documents and records of national projects are also retained permanently. Consistent classification systems are required to operation and maintenance of the facilities efficiently and to support the organic co-works for several Stakeholders. Therefore the classification of national construction projects are based on WBS of the project. WBS is the hierarchy structure that established and developed in project management project management methodology to produce deliverables of the projects. As a result, this study provides a prospect of project records classification systems in the 21st Century.

Procedural Model of XML Schema Framework for Digitalizing Disaster Information Management for Construction Facility (시설물 재해정보관리 전자화를 위한 XML스키마 구축 방법의 절차적 모형 구성)

  • Kang, Leen-Seok;Park, Seo-Young;Moon, Hyoun-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.56-64
    • /
    • 2006
  • The current disaster management manual is being utilized as a book or document-based type. It causes a low applicability and interoperability in practical business because each information has a different document format and it is difficult to recycle those information as common disaster information. The information reading by text type without electronic data and visual object also has a limitations in guaranteeing a quickness of disaster management business. Accordingly, the electronic document management system with visual information is necessary and the system needs to tie framed by XML schema because the electronic document standard will be changed from DTD to XML schema. This study attempts to develop a procedural methodology of an electronic document management system based on XML for disaster management. The applicability of the proposed results is verified by the simulated scenario.

A Standardized BIM Framework for Supporting Life-cycle Business Process for Port & Harbour Facilities (항만시설의 생애주기 업무 지원을 위한 BIM 표준 프레임워크 구축)

  • Moon, Hyoun-Seok;Won, Ji-Sun;Shin, Jae-Young
    • Journal of KIBIM
    • /
    • v.8 no.4
    • /
    • pp.49-59
    • /
    • 2018
  • Recently, the application of BIM for port & harbour facilities has been increasing, as it is widely applied to the infrastructure field both at domestic and abroad. However, the port and harbour projects still have very poor facilities information management system and the application level of BIM is very low compared to other facilities. Even if BIM is applied for those project, it is very difficult to determine in advance what information is needed without an accurate understanding of the business process. The purpose of this study is to develop a BIM framework for port & harbour facilities and to examine its applicability. To do this, we structured the classification of the port & harbour facilities and constructed object-based classification system based on ISO12006-3 standard. We also derived the BIM framework requirements from the viewpoint of process, standard, interface, and information, and confirmed the linkage of the BIM object classification system in the framework item. The applicability of the BIM framework for inspection process cases of port & harbour was examined. Accordingly, this study can solve requirement setting method, which is the non - procedural and non - systematic project information, in the BIM application process of the port & harbour project with the BIM framework. In addition, the framework is expected to be integrated into the system to play a key role in the selection of project objectives, and the ability to clearly identify the information requirements required by the BIM manager to perform the project.

Design and Analysis of AlGaN/GaN MIS HEMTs with a Dual-metal-gate Structure

  • Jang, Young In;Lee, Sang Hyuk;Seo, Jae Hwa;Yoon, Young Jun;Kwon, Ra Hee;Cho, Min Su;Kim, Bo Gyeong;Yoo, Gwan Min;Lee, Jung-Hee;Kang, In Man
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • v.17 no.2
    • /
    • pp.223-229
    • /
    • 2017
  • This paper analyzes the effect of a dual-metal-gate structure on the electrical characteristics of AlGaN/GaN metal-insulator-semiconductor high electron mobility transistors. These structures have two gate metals of different work function values (${\Phi}$), with the metal of higher ${\Phi}$ in the source-side gate, and the metal of lower ${\Phi}$ in the drain-side gate. As a result of the different ${\Phi}$ values of the gate metals in this structure, both the electric field and electron velocity in the channel become better distributed. For this reason, the transconductance, current collapse phenomenon, breakdown voltage, and radio frequency characteristics are improved. In this work, the devices were designed and analyzed using a 2D technology computer-aided design simulation tool.

The Development of Business Information System based on BPS for Urban Regeneration Projects (BPS기반의 도시재생사업 업무정보 시스템 구축)

  • Kim, Il-Woo;Seo, Jae-Pil;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.3-13
    • /
    • 2012
  • Urban area has caused decline of commercial function and infrastructure because of unorganized urban development, and urban regeneration projects have appeared since 2000s in order to solve urban problems. Because urban regeneration projects have a complexation of various use, the complicated business process and unsystematic conduction work, project stakeholders are suffering from problem in conducting project. Therefore, this study suggested the necessity of business system for urban regeneration projects with analyzing situations and stakeholders. Also, this study classified business information through development of BPS in order to make information system of business process in the urban regeneration project and evaluated it after realization for information system based on BPS of urban regeneration projects. Project stakeholders will be systematically provided information about urban regeneration projects through this system and it is expected to accomplish urban regeneration projects effectively.

A measure for activating BIM by actual application analysis of integrated utilization process of quantity, process(4D), and construction cost(5D) in view of life-cycle

  • Lee, Jae-Hong;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.12
    • /
    • pp.1-15
    • /
    • 2020
  • In this paper, we propose a novel method for converting the existing 2D processes in the design and construction phase of civil engineering, to the future BIM-based processes. First, we compare and analyze the actual application processes of the outputs of the existing 2D method and the outputs of the 3D BIM method, for the whole process of BIM design of earthworks and road structures and integrated utilization of quantity, process(4D) and construction cost(5D), in view of life-cycle. The proposed method acquire the outputs of the design phase integrating IFC international common standard file information and CBS/OBS/WBS standard classification scheme information, and acquire the outputs of the construction stage by using an integrated utilization module for quantity, process(4D) and construction cost(5D). Ultimately, we intend to commercialize the step by step technologies for BIM design and construction in civil engineering by using the proposed method.

DEVELOPMENT OF BUILDING INFORMATION MODEL FOR RESOURCES OPTIMIZATION IN CONSTRUCTION PROJECT

  • Gopal M. Naik;Rokhsareh Badamahgan
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.634-639
    • /
    • 2013
  • The aim of the study is to develop the 3D visualization of Building Information Model and integrated 4D model for optimization of resources in the construction project. This study discuss the process of methodology and creation of 4D model of the project and simulate it to monitor the workflow at the site. Different stages of the construction process and activities are generated by using Revit and MS Project. MS project has been used for creation of the schedules and these are linked with the Revit for 3D modeling. The time used as the fourth dimension and 4D model created by using Navisworks Time liner software. Narges shopping center is presented as a case study to realize the actual uses and benefits of Building Information Model (BIM). Narges shopping mall is located in Tehran, Iran. As a part of Hekmat master plan, Narges shopping center is an 11 stores building with a total area of 30000 Sq.m. This shopping and entertainment center is comprised of 150 retails and two multi-use public halls with a capacity of 400 persons each and underground parking with total 400 parking space. The main purpose of architecture was to create an urban public center along with its revolving, spiral like form and an ever changing continuous façade by means of different colors, materials, which is in harmony with the other building of the master plan. The approximate cost of the project is $17 million and duration of the project schedule is 30 months. The developed Building Information Model enabled us to identify the potential collisions or clashes between various structural and architectural systems. 4D model has been used for limiting the interaction between subcontractors installing the different systems so rework could be avoided and productivity maximized. It is also observed that the utility of BIM for construction stimulation and clash detection is the best suitable method. Clash detection before the implementation of work is highly recommended to avoid rework.

  • PDF

Short Channel Analytical Model for High Electron Mobility Transistor to Obtain Higher Cut-Off Frequency Maintaining the Reliability of the Device

  • Gupta, Ritesh;Aggarwal, Sandeep Kumar;Gupta, Mridula;Gupta, R.S.
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • v.7 no.2
    • /
    • pp.120-131
    • /
    • 2007
  • A comprehensive short channel analytical model has been proposed for High Electron Mobility Transistor (HEMT) to obtain higher cut-off frequency maintaining the reliability of the device. The model has been proposed to consider generalized doping variation in the directions perpendicular to and along the channel. The effect of field plates and different gate-insulator geometry (T-gate, etc) have been considered by dividing the area between gate and the high band gap semiconductor into different regions along the channel having different insulator and metal combinations of different thicknesses and work function with the possibility that metal is in direct contact with the high band gap semiconductor. The variation obtained by gate-insulator geometry and field plates in the field and channel potential can be produced by varying doping concentration, metal work-function and gate-stack structures along the channel. The results so obtained for normal device structure have been compared with previous proposed model and numerical method (finite difference method) to prove the validity of the model.

A WEB-BASED PROJECT MANAGEMENT SYSTEM FOR GOVERNMENT R&D PROGRAMS (국가 연구개발을 위한 웹기반의 과제관리 시스템)

  • 손권중
    • Proceedings of the Technology Innovation Conference
    • /
    • 2003.06a
    • /
    • pp.108-115
    • /
    • 2003
  • Government R&D Project Management in Korea has had considerable difficulties because of the lack of project monitoring systems and insufficient communication. The National Program for Tera-level Nanodevices (TND Program) is a ten-year R&D program for commercialization in the area of nano technology. Collaboration and communication among the various participants such as business companies, universities, and government R&D institutes are key success factors in this R&D program. TND Program office has developed a Web-based project management system. This system consists of mostly four sub-management functions: (1) Milestones management of all R&D projects; (2) DR (Design Review) management as the mechanism for checking the performance against milestones; (3) Project activity management using the WBS (Work Breakdown Structure); (4) Budget management. Additionally, it also has many R&D supporting functions such as technology information bulletin board, community management, and visual summary of project progress and performance. This system is effective for monitoring research project as well as measuring project performance of the overall research program. This Web-based system has become the useful tool of R&D moving target mechanism and effective communication and collaboration tool. System features and adoption process of the system are also suggested.

  • PDF