Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.140-144
/
2004
Barcode system has been used for many years in labors controlling & ready mixed concrete supplement in A/E/C industry However, it was not quite successful because ot its limitations in the field. The use of RFID system is getting important in the real world. RFID system substituted for barcode system in labor controling & ready mixed concrete supplement and it showed its potentialities in other major materials supply logistics and its possibilities In progress management of 4D system. This research shows RFID system's case study and its future directions in A/E/C industry.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.588-591
/
2004
Recently as people's values are changing from development into quality of life, the needs of environmentally friendly construction are gradually increasing, also popular discontent about the construction pollution such as the noise and vibration cause by construction machinery is increasing. Even though it is impossible to eliminate construction pollution fully, it is necessary to make efforts to reduce construction pollution to a minimum. The first step solving these matters is that the necessary sum of expense must be secured as the environmental budgeting method regarding Environmental management costs. To provide an efficient budgeting method, a interview with the person in charge of environment management was conducted. and the environmental management costs were analyzed through the historical data.
The current construction industry mainly uses paper-based construction documents which are produced during the whole life cycle. The paper-based information hinders to reuse the construction information, due to the inefficiency to exchange and share the construction information between designers and constructors. To overcome these problems, construction CALS/EC (Continuous Acquisition and Life Cycle Support/Electronic Commerce) has been proposed by the government. It supports efficient reusing, sharing and exchanging the construction information using digitalized drawings and documentations. This study intends to show the future applying methodologies of using the standardized key technologies in the construction CALS/EC based on the case study of Korea and several countries.
Korean Journal of Construction Engineering and Management
/
v.5
no.3
s.19
/
pp.137-145
/
2004
Owing to the growth of Information Technology, some of big general contractors have been interested in the development of Quality Management Information Systems to integrate the information of quality in planning, design, procurement, construction, and maintenance phases, and tried to maximize the usefulness of it. But the trend has confined only to some big general contractors. The purpose of this paper is to put together and analyze the character of Quality Management Information Systems of big general construction companies and classfy them into a result-focused system and a process-focused system in order to provide primary information for both of development and adoption of the systems.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.483-486
/
2006
The value engineering(VE) in construction projects is systematic method which improve quality as well as reduction input cost and as construction VE work extends the range of application, the importance is rising. For this reason studies are needed to enforce design value engineering work systemically and effectively. In this study, we analyzed the problem of the present construction VE processing and deduced the model to be most suitable the work efficiency. As suggested model reflects systemically requirement item of owner and user, it will make approaching direction and standard establishment possible. So it will increase the following function analysis in analyzing step and the effectiveness of creating idea and make successful VE result.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.515-518
/
2006
Construction project has various effective factor and many producer in multifarious process of the work. Thus it has many variation. However, Process management up to now is management method of conclusion oriented. So, it do not consider sequency and variation occurrence. In a result that a lot of problems happen. Lean Construction can solve limit of the present management method. And Lean Construction is estimated new management method of process management for reliance on process plan, safety of process and promotion of effectiveness. This study analysed application of real construction project in Lean Construction theory and examined to utilize VSM and TACT for field application.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.164-170
/
2003
This paper is to evaluate the informational direction, current situations and ERP establishment concerning constructing industry, to present the right directions, implemented cases for implementing constructional ERP, also to suggest the effect, influence, problems and shootings in constructional ERP arena. The constructing industries in korea are facing great turning point because of the huge corruptions currently happened and forcing to open the market in 1997. Attempting to establish Computer Integrated construction system (ERP) by breaking down constructing cost, improving quality, operating rapid and effective construction to enhance productivity, it is hard to achieve the goal with only inter-contractor's establishment. Constructing industries are integrated ones, consisted of many organizations for instance ordering agencies, contractors, subcontractors, material vendors, etc. and use various information formats such as texts, graphics, drawings. I dare suggest that implementation of constructional CALS including EDI/EC, GIS is tile only solution to control the information systematically generated in whole stages from planing, designing, constructing through maintenance, and to supply or switch the information.
Proceedings of the Korean Institute of Building Construction Conference
/
2021.05a
/
pp.293-294
/
2021
For the successful introduction of the construction automation system, it is necessary to define the consideration factors and target tasks for the necessity of automating the conventional methods. In this study, the factors for automation were derived through brainstorming and questionnaires, and calculated the relative importance through the pairwise comparison using the AHP analysis method. In addition, the detailed type of concrete work was classified into 32 detailed works, and the automation score for each work was calculated by investigating the factors considering the necessity of automation. As a result of the automation score analysis, it was concluded that the need for automation of concrete placing work was the highest. Based on this study, we will consider the strategy of a concrete construction automation system.
Korean Journal of Construction Engineering and Management
/
v.10
no.4
/
pp.119-128
/
2009
The construction R&D(Research & Development) has various performance according to research charater. But present performance evaluation form evaluates project rather than charater of research. The important reasons that evaluats the performance are to try conclusions with evaluated objects in the short run, but to forecast the performance of future construction R&D and to get the better performance. Thus this study extracts the RPI(Research Performanc Index) with output as the conter, developes the estimation method and measures the quantitative performance. Applying the ANOVA(Analysis of Variance), it is proved that the performance according to research charater is various. And applying the Correspondence Analysis, it is analised the relationship with performance and research charater. The purposes of this study are to idetify the problem of uniform performance evaluation and to improve it.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.234-237
/
2003
The Korean housing supply have been provided by the Pre-construction sales system. The Pre-construction sales system contributed to large housing supply. But it followed by the market anomaly. Along the housing market is changing to tile market for consumers, it requires new policy and regulations. This market changes and needs to modify the policy make a discussion about introducing the Post-construction sales system. it concerns to change the time to sale. This paper analyzes the present feasibility study and makes a tool to predict construction cashflow considering changed sales point. The sales timing leads to decide the amount of financial costs in the construction project and that cost affects to the feasibility. The accurate cashflow prediction is required for a successful apartment construction delivery.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.